Skip to content

Fix acceptance test assertions for updated plugin remove#17126

Merged
donoghuc merged 1 commit intoelastic:mainfrom
donoghuc:update-acceptance-test-assertions-take-2
Feb 20, 2025
Merged

Fix acceptance test assertions for updated plugin remove#17126
donoghuc merged 1 commit intoelastic:mainfrom
donoghuc:update-acceptance-test-assertions-take-2

Conversation

@donoghuc
Copy link
Copy Markdown
Member

Release notes

[rn:skip]

What does this PR do?

This commit updates the acceptance tests to expect messages in the updated format for removing plugins. See #17030 for change.

Why is it important/What is the impact to the user?

No user impact, this is fixing acceptance test assertions

Checklist

  • My code follows the style guidelines of this project
    - [ ] I have commented my code, particularly in hard-to-understand areas
    - [ ] I have made corresponding changes to the documentation
    - [ ] I have made corresponding change to the default configuration files (and/or docker env variables)
    - [ ] I have added tests that prove my fix is effective or that my feature works

Related issues

Logs

Example failures:
https://buildkite.com/elastic/logstash-exhaustive-tests-pipeline/builds/1361#01952103-6591-43cf-a364-cc876ac8bc21

Failures:
--
  |  
  | 1) CLI operation behaves like logstash remove logstash-plugin remove on [Ubuntu 20.04] when the plugin isn't installed fails to remove it
  | Failure/Error: DEFAULT_FAILURE_NOTIFIER = lambda { \|failure, _opts\| raise failure }
  |  
  | expected "ERROR: Operation aborted, cannot remove plugin, message: The plugin `logstash-filter-qatest` has not been previously installed" to match /This plugin has not been previously installed/
  | Diff:
  | @@ -1 +1 @@
  | -/This plugin has not been previously installed/
  | +"ERROR: Operation aborted, cannot remove plugin, message: The plugin `logstash-filter-qatest` has not been previously installed"
  |  
  | Shared Example Group: "logstash remove" called from ./acceptance/spec/lib/cli_operation_spec.rb:38
  | # ./acceptance/spec/shared_examples/cli/logstash-plugin/remove.rb:36:in `block in <main>'
  | # ./Rakefile:30:in `block in <main>'
  |  
  | Finished in 20 minutes 37 seconds (files took 1.57 seconds to load)
  | 30 examples, 1 failure, 1 pending

This commit updates the acceptance tests to expect messages in the updated
format for removing plugins. See elastic#17030
for change.
Copy link
Copy Markdown
Contributor

@mashhurs mashhurs left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM!

@elastic-sonarqube
Copy link
Copy Markdown

Quality Gate passed Quality Gate passed

Issues
0 New issues
0 Fixed issues
0 Accepted issues

Measures
0 Security Hotspots
No data about Coverage
No data about Duplication

See analysis details on SonarQube

@elasticmachine
Copy link
Copy Markdown

💚 Build Succeeded

@donoghuc donoghuc merged commit e8e24a0 into elastic:main Feb 20, 2025
@donoghuc
Copy link
Copy Markdown
Member Author

@logstashmachine backport 9.0

@donoghuc
Copy link
Copy Markdown
Member Author

@logstashmachine backport 8.x

github-actions bot pushed a commit that referenced this pull request Feb 20, 2025
This commit updates the acceptance tests to expect messages in the updated
format for removing plugins. See #17030
for change.

(cherry picked from commit e8e24a0)
yaauie pushed a commit to yaauie/logstash that referenced this pull request Feb 20, 2025
This commit updates the acceptance tests to expect messages in the updated
format for removing plugins. See elastic#17030
for change.
donoghuc added a commit that referenced this pull request Feb 20, 2025
…7129)

This commit updates the acceptance tests to expect messages in the updated
format for removing plugins. See #17030
for change.

(cherry picked from commit e8e24a0)

Co-authored-by: Cas Donoghue <cas.donoghue@gmail.com>
donoghuc added a commit that referenced this pull request Feb 20, 2025
…7131)

This commit updates the acceptance tests to expect messages in the updated
format for removing plugins. See #17030
for change.

Co-authored-by: Cas Donoghue <cas.donoghue@gmail.com>
v1v pushed a commit to v1v/logstash that referenced this pull request Feb 25, 2025
This commit updates the acceptance tests to expect messages in the updated
format for removing plugins. See elastic#17030
for change.
v1v added a commit to v1v/logstash that referenced this pull request Feb 25, 2025
…gify

* upstream/main: (27 commits)
  Add Windows 2025 to CI (elastic#17133)
  Update container acceptance tests with stdout/stderr changes (elastic#17138)
  entrypoint: avoid polluting stdout (elastic#17125)
  Fix acceptance test assertions for updated plugin remove (elastic#17126)
  Fix acceptance test assertions for updated plugin `remove` (elastic#17122)
  plugins: improve `remove` command to support multiple plugins (elastic#17030)
  spec: improve ls2ls spec (elastic#17114)
  allow concurrent Batch deserialization (elastic#17050)
  CPM handle 404 response gracefully with user-friendly log (elastic#17052)
  qa: use clean expansion of LS tarball per fixture instance (elastic#17082)
  Allow capturing heap dumps in DRA BK jobs (elastic#17081)
  Use centralized source of truth for active branches (elastic#17063)
  Update logstash_releases.json (elastic#17055)
  fix logstash-keystore to accept spaces in values when added via stdin (elastic#17039)
  Don't honor VERSION_QUALIFIER if set but empty (elastic#17032)
  Release note placeholder might be empty, making parsing lines nil tolerant. (elastic#17026)
  Fix BufferedTokenizer to properly resume after a buffer full condition respecting the encoding of the input string (elastic#16968)
  Add short living 9.0 next and update main in CI release version definition. (elastic#17008)
  Core version bump to 9.1.0 (elastic#16991)
  Add 9.0 branch to the CI branches definition (elastic#16997)
  ...
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants