Skip to content

Work in progress on interface refactoring#6

Merged
avsm merged 9 commits intomirage:masterfrom
avsm:refactor-interface
May 31, 2014
Merged

Work in progress on interface refactoring#6
avsm merged 9 commits intomirage:masterfrom
avsm:refactor-interface

Conversation

@avsm
Copy link
Copy Markdown
Member

@avsm avsm commented May 27, 2014

No description provided.

arjunguha and others added 7 commits May 14, 2014 23:12
Allow the source interface for a conduit to be set.

This refactoring is WIP.
…e current connection

This is preferable to the solution in mirage#2 since it is extensible to other types of
connections in the future, such as shared memory (which will not fit into the sockaddr
model).
dinosaure added a commit to dinosaure/ocaml-cohttp that referenced this pull request May 28, 2014
avsm added 2 commits May 30, 2014 12:33
The Async server is still not using Conduit.Server since it's a
more complex type to override, so this will change in the future.
avsm added a commit that referenced this pull request May 31, 2014
Work in progress on interface refactoring
@avsm avsm merged commit 249849a into mirage:master May 31, 2014
@avsm avsm deleted the refactor-interface branch May 31, 2014 16:22
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants