Skip to content

[CI] Rebalance CI test partitions to reduce Part3 bottleneck#142930

Merged
breskeby merged 2 commits intoelastic:mainfrom
breskeby:rebalance-ci-partitions
Feb 24, 2026
Merged

[CI] Rebalance CI test partitions to reduce Part3 bottleneck#142930
breskeby merged 2 commits intoelastic:mainfrom
breskeby:rebalance-ci-partitions

Conversation

@breskeby
Copy link
Copy Markdown
Contributor

Move EQL and SQL projects from Part3 to Part5, and move
smoke-test projects and :x-pack:plugin root from Part3 to
Part6. This reduces Part3 from ~86 min to ~60 min, cutting
PR build critical path by ~25-30%.

Move EQL and SQL projects from Part3 to Part5, and move
smoke-test projects and :x-pack:plugin root from Part3 to
Part6. This reduces Part3 from ~86 min to ~60 min, cutting
PR build critical path by ~25-30%.
@breskeby breskeby added >non-issue :Delivery/Build Build or test infrastructure Team:Delivery Meta label for Delivery team auto-backport Automatically create backport pull requests when merged v9.4.0 v9.3.2 v8.19.13 v9.2.7 labels Feb 24, 2026
@breskeby breskeby self-assigned this Feb 24, 2026
@breskeby breskeby changed the title Rebalance CI test partitions to reduce Part3 bottleneck [CI] Rebalance CI test partitions to reduce Part3 bottleneck Feb 24, 2026
@elasticsearchmachine
Copy link
Copy Markdown
Collaborator

Pinging @elastic/es-delivery (Team:Delivery)

@breskeby breskeby merged commit abaf34e into elastic:main Feb 24, 2026
34 of 35 checks passed
breskeby added a commit to breskeby/elasticsearch that referenced this pull request Feb 24, 2026
Move EQL and SQL projects from Part3 to Part5, and move
smoke-test projects and :x-pack:plugin root from Part3 to
Part6. This reduces Part3 from ~86 min to ~60 min, cutting
PR build critical path by ~25-30%.
breskeby added a commit to breskeby/elasticsearch that referenced this pull request Feb 24, 2026
Move EQL and SQL projects from Part3 to Part5, and move
smoke-test projects and :x-pack:plugin root from Part3 to
Part6. This reduces Part3 from ~86 min to ~60 min, cutting
PR build critical path by ~25-30%.
@elasticsearchmachine
Copy link
Copy Markdown
Collaborator

💔 Backport failed

Status Branch Result
9.3
8.19 Commit could not be cherrypicked due to conflicts
9.2

You can use sqren/backport to manually backport by running backport --upstream elastic/elasticsearch --pr 142930

elasticsearchmachine pushed a commit that referenced this pull request Feb 24, 2026
…42966)

Move EQL and SQL projects from Part3 to Part5, and move
smoke-test projects and :x-pack:plugin root from Part3 to
Part6. This reduces Part3 from ~86 min to ~60 min, cutting
PR build critical path by ~25-30%.
szybia added a commit to szybia/elasticsearch that referenced this pull request Feb 24, 2026
…on-sliced-reindex

* upstream/main:
  Activity logging improvements (elastic#142901)
  Fix serialization of NodeGpuStatsResponse when no GPU is present (elastic#142937)
  Add doc on master elections in DistributedArchitectureGuide (elastic#142435)
  ESQL: Account for missing StubRelation due to SurrogateExpressions replacement (elastic#142882)
  Add BulkByScrollTask Serialization Tests (elastic#142697)
  Rebalance CI test partitions to reduce Part3 bottleneck (elastic#142930)
  Mute org.elasticsearch.xpack.esql.qa.multi_node.EsqlClientYamlIT test {p0=esql/40_tsdb/to_aggregate_metric_double with multi_values} elastic#142964
  Bump OpenTelemetry dependencies (elastic#142323)
  SQL: add support for API key to JDBC and CLI (elastic#142021)
  Ensure requested capability exists (elastic#142695)
  Warn and fall back to local branches.json (elastic#142606)
  [CI] Mute testWithFetchFailures, testAddCompletionListenerScheduleErr… (elastic#142926)
  ESQL: Add support for ORC file format (elastic#142900)
  Update wolfi (versioned) (elastic#142948)
  Add BulkByScrollResponse Serialization Tests (elastic#142688)
  Run 25_id_generation with and without synthetic id (elastic#142770)
breskeby added a commit that referenced this pull request Feb 25, 2026
…42965)

Move EQL and SQL projects from Part3 to Part5, and move
smoke-test projects and :x-pack:plugin root from Part3 to
Part6. This reduces Part3 from ~86 min to ~60 min, cutting
PR build critical path by ~25-30%.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

auto-backport Automatically create backport pull requests when merged backport pending :Delivery/Build Build or test infrastructure >non-issue Team:Delivery Meta label for Delivery team v8.19.13 v9.2.7 v9.3.2 v9.4.0

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants