Skip to content

Reduce time for initial PR to 14 days#14580

Merged
calixtus merged 1 commit into
mainfrom
timeout-to-14-days
Dec 12, 2025
Merged

Reduce time for initial PR to 14 days#14580
calixtus merged 1 commit into
mainfrom
timeout-to-14-days

Conversation

@koppor

@koppor koppor commented Dec 12, 2025

Copy link
Copy Markdown
Member

I think it should be possible within 14 days to either (a) pin the issue or (b) open a draft PR—especially for our good first issues. When contributors open a PR, the issue is pinned and not unassigned.

This change is also driven by the highly demanded good-first-issues and we cannot craft new good-first-issues to have multiple free ones available.

Steps to test

Watch out in production

Mandatory checks

  • I own the copyright of the code submitted and I license it under the MIT license
  • [/] I manually tested my changes in running JabRef (always required)
  • [/] I added JUnit tests for changes (if applicable)
  • [/] I added screenshots in the PR description (if change is visible to the user)
  • [/] I described the change in CHANGELOG.md in a way that is understandable for the average user (if change is visible to the user)
  • [/] I checked the user documentation: Is the information available and up to date? If not, I created an issue at https://github.com/JabRef/user-documentation/issues or, even better, I submitted a pull request updating file(s) in https://github.com/JabRef/user-documentation/tree/main/en.

@calixtus calixtus added this pull request to the merge queue Dec 12, 2025
Merged via the queue into main with commit 15a38ec Dec 12, 2025
71 of 77 checks passed
@calixtus calixtus deleted the timeout-to-14-days branch December 12, 2025 13:44
Siedlerchr added a commit that referenced this pull request Dec 14, 2025
* upstream/main: (23 commits)
  Chore(deps): Bump org.mockito:mockito-core in /jablib (#14611)
  Chore(deps): Bump actions/download-artifact from 6 to 7 (#14605)
  Chore(deps): Bump com.squareup.okio:okio-jvm in /versions (#14613)
  Chore(deps): Bump DavidAnson/markdownlint-cli2-action from 21 to 22 (#14607)
  Chore(deps): Bump org.mockito:mockito-core in /versions (#14615)
  New translations jabref_en.properties (Italian) (#14596)
  Reset and Import for GroupsPreferences (#14572)
  Enable parallel tests (#14571)
  Copy over label in all cases
  Also allow adding label
  Fix workflow (#14586)
  Unassign issues on stale (#14585)
  Increase max assignments from 1 to 2
  Reduce time for initial PR to 14 days (#14580)
  New Crowdin updates (#14579)
  chore(deps): update dependency org.eclipse.jgit:org.eclipse.jgit.pgm to v7.5.0.202512021534-r (#14577)
  Fix stale closing
  Try to fix commenting on closed PRs
  Add 15 non-standard BibLaTeX entry types with .withType() method (#14534)
  New Crowdin updates (#14570)
  ...
Siva-Sai22 pushed a commit to Siva-Sai22/jabref that referenced this pull request Dec 19, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants