FORMAT
What we fit out

Restaurants
Standalone and in mall. Dining areas, kitchens, bars, washrooms, MEP, branding integration.

Cafés
Standalone and in mall. Counter led layouts, kitchen prep zones, customer flow optimisation.

Cloud kitchens
Multi brand commercial kitchens. Cooking zones, packaging stations, delivery rider flow, ventilation specification.

Hotel F&B
Hotel restaurants, bars, room service kitchens, breakfast operations. Coordinated with hotel brand standards.

FPG
The Permit Reality
Where most fit outs lose weeks.
F&B fit out in Dubai runs through three permit chains: Dubai Municipality (building and food safety), Civil Defence (fire and life safety), and Food Safety (operational license). Most contractors run the build first and chase permits after. We run permits in parallel from week one.
The difference is opening dates. F&B operators measure success in days — every week of delay is rent paid on a closed venue. We have shipped F&B venues on date because permits cleared on date.

Dubai
Ember Flame Grill Restaurant
F&B Fit Out

Abu Dhabi
Maison Étoile
F&B Fit Out

Dubai
Véloce Artisan Café
F&B Fit Out

Shisha Bar + Restaurant
F&B Fit Out
SELECTED WORK
Featured F&B projects

How we work
01
Brand Brief
Concept, brand standards, F&B menu/operations.
02
Design Intent
Layout, materials, kitchen plan.
03
Permits in Parallel
DM, Civil Defence, Food Safety submissions start immediately.
04
Detailed Design
Coordinated drawings, kitchen schematic, MEP, FFE.
05
Build
Single contractor, weekly site reports.
06
Opening Support
Snagging, soft-launch sign-off, defects window.
12-20 weeks for a standalone restaurant, 8-14 weeks for a café, 6-10 weeks for a cloud kitchen. Larger venues longer.
All three chains — Dubai Municipality, Civil Defence, Food Safety. Submissions start in parallel with detailed design.
Yes. Kitchen brief from the menu, equipment schedule, ventilation calculation, MEP
coordination. We work with the major kitchen suppliers.Ventilation is the most-failed inspection in F&B. We design to Civil Defence spec from day one, not retrofit after rejection. Kitchen extract, make-up air, and grease management coordinated up front.
Yes. Standard 1-2 week soft-launch period for snagging and operational shake-down. Defects warranty 1 year from handover.

Property, renovation and maintenance insights from Dubai.
Monthly briefing. No spam. Unsubscribe any time.
© Copyright 2026. FirstPoint Group. All rights reserved. Site by wevisualise
Quick Links

We provide real estate advisory, renovation, and commercial fit out services across Dubai and Abu Dhabi.
Authorised Contractor