builddesign

The LAES and Architecture students worked together in a charrette environment for the second weekend of the Fall quarter, then the strongest designs to result from that charrette were moved ahead as a build project for the LAES 301-302 students (in collaboration with a small build team of LAES & Architecture students), with the goal of building the first iteration of this project at the center of the Cal Poly campus for the week prior to the national Presidential election (Nov. 8th). Due to some delays with the cutting machines, the project instead ran on campus, immediately after the election, for a 5-day installation at the center of campus.

 Setup Video              Teardown Video