Our Work

Through survey and assessment of the existing structure or ground condition, we first make a full analysis of the project requirements.

We take into account the logistical limitations of the surroundings to inform our method and risk management strategies. Where necessary, we take on the role of liaising with local authorities to organise applications, licences and relevant permissions required to carry out our works.

  • Asbestos Removal
  • Strip Out
  • Structural Alterations
  • Demolition
  • Site Remediation
  • Groundworks
  • Highways Works
  • RC Structures
  • Reclamation
  • Dismantling
  • Ashford Fire Station

    Demolition of a 4-storey building, extensive groundworks and 5-storey RC Frame construction.

    Bath Road, Slough

    Internal Strip out of a five-storey commercial office development

    Berkeley House

    Demolition of Berkeley House and associated structures, including grubbing up of slabs and foundations.

    Bromley North Carpark

    Demolition and enabling works at the former site of Bromley North Carpark.

    District Park, Margate

    Groundworks consisting of access road and roundabout establishment, FW & SW drainage, lighting and soft landscaping erection.

    Kent Wool Growers

    Demolition of non-listed and no-curtilage listed commercial buildings, whilst protecting grade II listed buildings on site.

    Mulberry Wharf

    Demolition of asbestos clad steel frame warehouses.

    Napchester Road

    Groundworks and highway package for the Whitfield Urban Expansion Project.

    Nash Road

    Substructure construction and enabling works for 49 one and two bedroom apartments.

    Port of Ramsgate

    Demolition of the passenger terminal building and associated two storey buildings.

    SSE Chimney

    Dismantling of a 55m high steel chimney.

    Phase 2 Riverside, Kingsmead Road

    Demolition of the existing Riverside site; the scope including demolition of 15 structures, over two phases.

    Former Naccolt Brickworks

    DDS Demolition undertook the demolition and land remediation in two phases. The site comprised of former brickworks which included the presence of drying sheds, kilns, production buildings and stores.

    Stelling Minnis

    Enabling and groundworks for a residential scheme in Kent.

    Hornby Hobbies

    The modification and refurbishment of the Former Hornby Hobbies building, following initial demolition and asbestos removal.

    Steel Mill Enabling

    Industrial Demolition and Site Remediation of the 50acre Sheerness Steelworks Site

    Secure Storage Solutions Development

    Partial demolition and complete refurbishment of a former agricultural building.

    Dover Leisure Centre

    Demolition and site clearance of former leisure centre and the protection and preservation of the historical ruins of St James Church.

    Sheerness Steel Mill

    Industrial Demolition and Site Remediation of the 50acre Sheerness Steelworks Site.

    Smurfit Kappa Paper Mill Demolition

    Demolition of the PM1 paper mill buildings in Kent, facilitating construction of the new PM9 paper mill.

    St James Retail Park

    Demolition of a 12-storey office block, multi-storey carpark, hotel and shops.

    Richborough Power Station

    Demolition of power station buildings, cooling towers and chimney.

    Canterbury Road West

    Groundworks for a 65 Residential unit development in Kent.

    Oaklands Care Home

    Groundworks for the construction of a 72 bed care home.

    Prince of Wales Pier

    The partial demolition and height reduction of the Prince of Wales Pier at Dover Harbour.

    Springwood

    Enabling and groundworks for the development of two NHS accommodation blocks.

    Dover Docks (ED1) Ferry Link Span Bridge

    Demolition and Dismantling of the ED1 Link Span Bridge within the Port of Dover Eastern Docks.

    Aylesford Reservoirs

    Emergency ground stabilisation, partial demolition and reconstruction works of a strategically critical water reservoir asset.

    Paddock Wood Community Centre

    Groundworks for the construction of Paddock Wood Community Centre.

    Risborough Barracks

    Demolition of various buildings, as part of a 1,200-home development; the works included a mixture of single and two-storey buildings.

    Hyleford Hostel, Loxford Lane

    Demolition of commercial properties, site remediation and enabling works in preparation for 159 new homes.