We take into account the logistical limitations of the surroundings to inform our method and risk management strategies. Where necessary, we take on the role of liaising with local authorities to organise applications, licences and relevant permissions required to carry out our works.
Demolition of a 4-storey building, extensive groundworks and 5-storey RC Frame construction.
Demolition of Berkeley House and associated structures, including grubbing up of slabs and foundations.
Groundworks consisting of access road and roundabout establishment, FW & SW drainage, lighting and soft landscaping erection.
Demolition of non-listed and no-curtilage listed commercial buildings, whilst protecting grade II listed buildings on site.
Demolition of an 8-storey office block and multi storey carpark.
Demolition of the existing Riverside site; the scope including demolition of 15 structures, over two phases.
Multi storey car park demolition, Abbey Road, London.
DDS Demolition undertook the demolition and land remediation in two phases. The site comprised of former brickworks which included the presence of drying sheds, kilns, production buildings and stores.
Demolition and enabling works at the former Canterbury prison.
The modification and refurbishment of the Former Hornby Hobbies building, following initial demolition and asbestos removal.
Industrial Demolition and Site Remediation of the 50acre Sheerness Steelworks Site
Partial demolition and complete refurbishment of a former agricultural building.
Demolition and site clearance of former leisure centre and the protection and preservation of the historical ruins of St James Church.
Industrial Demolition and Site Remediation of the 50acre Sheerness Steelworks Site.
Top-down demolition of 2 multi storey carparks within Dover Docks
Demolition and site clearance of two 6 storey office blocks.
Demolition of the PM1 paper mill buildings in Kent, facilitating construction of the new PM9 paper mill.
The partial demolition and height reduction of the Prince of Wales Pier at Dover Harbour.
Enabling and groundworks for the development of two NHS accommodation blocks.
Demolition and Dismantling of the ED1 Link Span Bridge within the Port of Dover Eastern Docks.
Demolition and site clearance of dilapidated and dangerous buildings.
Emergency ground stabilisation, partial demolition and reconstruction works of a strategically critical water reservoir asset.
Demolition of various buildings, as part of a 1,200-home development; the works included a mixture of single and two-storey buildings.
Demolition of commercial properties, site remediation and enabling works in preparation for 159 new homes.