Explore real-world case studies that show how ACCC® Conductors increase capacity, efficiency, and solve key challenges like sag mitigation. From long spans and river crossings to desert and mountain landscapes, these case studies highlight why ACCC® Conductor is the trusted choice for a wide range of applications.

ENEL Reconductors to Ensure a Reliable Energy Future

Project Goal: Increased line capacity from 800 to 1,200 amps.

Conductor Length: 70 km

Voltage: 115 kV

RECONDUCTORING FOR ADDED CAPACITY IN THE SCOTTISH HIGHLANDS

SSEN RECONDUCTORS FOR ADDED CAPACITY IN THE SCOTTISH HIGHLANDS

Project Goal: Increase Ampacity (use existing structures)

Conductor Size: Drake

Conductor Length: 30 km

Voltage: 138 kV

Energized: 2005

Over 100 existing structures saved

ELIA ADDS NETWORK RELIABILITY WITH THE ACCC INFOCORE® SYSTEM

Project Goal: Install New Line

Conductor Size: Hawk

Conductor Length: 108 km

Voltage: 34.5 kV

Energized: 2006

American Electric Power Doubles Capacity, Saves Time and Money

American Electric Power Reconductors to Double Capacity, Saving Time and Money

SCE Reconductors to Mitigate Sag and Improve Reliability

Southern California Edison Reconductors to Mitigate Sag and Improve Reliability

PGCB Completes New Lines Project in Bangladesh to Accommodate Growth

Transmission tower on a green field with a tree in the frame

TenneT Netherlands Reconductors with ACCC® AZR Conductor to Endure Ice Load

Red and white painted transmission tower

ANDE Completes New Line Project with ACCC® Conductor to Meet Energy Demand and Future Growth