Case Studies
Trusted by global manufacturers and over 50.000 users, Bluestar PLM unifies engineering and operations inside Dynamics 365, boosting efficiency,
cutting lead time, and reducing errors. Discover how leading companies transform their product lifecycle with Bluestar PLM.
90% Faster engineering releases at Bastian Solutions
Discover how Bastian Solutions, Toyota Automated Logistics, cut engineering lead time by 90% and unified design-to-production with Bluestar PLM.

Hooker Furnishings
Hooker Furnishings replaced a discontinued system with Bluestar PLM in D365 to centralize product data and speed up product releases without middleware.

Blum-Novotest GmbH
Blum-Novotest modernized its digital backbone with Dynamics 365 and Bluestar PLM, creating one shared digital thread.

Bastian Solutions
Bastian Solutions increased engineering efficiency by 90% using Bluestar PLM, replacing manual processes with automated workflows and improving collaboration.

HighRes Biosolutions
HighRes, a leading lab automation company, integrated Bluestar PLM with Microsoft Dynamics 365 to eliminate data silos and enhance productivity.

Hager Companies
Bluestar’s solution replaced Hager's manual systems, providing comprehensive document management and streamlined workflows to enhance strategic decision-making.

Schréder
Schréder, a global leader in outdoor lighting, aimed to streamline operations and unify processes by integrating Microsoft Dynamics 365 ERP with Bluestar PLM.

AMF Bakery
AMF chose Bluestar PLM for its D365 F&SCM integration, enabling seamless collaboration, easy file transfers, and efficient workload management across locations.

BMZ Germany GmbH
BMZ Germany GmbH, a global manufacturer of rechargeable battery systems, has greatly improved its engineering and production efficiency by integrating Bluestar PLM.

Scanlab
Scanlab, a leading manufacturer of laser scanning systems, successfully implemented Bluestar PLM within D365 F&SCM, improving its engineering and production processes.

Norican Group
Norican Group implemented Bluestar PLM, a Microsoft D365 F&SCM-based solution, to provide its employees with access to a single, version-controlled set of product data.

DAS Environmental Experts
DAS Environmental Experts successfully implemented Bluestar PLM, achieving seamless integration between engineering and production that enhanced collaboration.

Xtek
Xtek’s implementation of Bluestar PLM streamlined engineering workflows and strengthened collaboration, enhancing their ability to deliver customized solutions.
Reel Alesa
REEL Alesa AG's implementation of Bluestar PLM created a single source of truth, enabling information to be created once and seamlessly accessed thereafter.

Trainvac
Trainvac successfully implemented Bluestar PLM to enable seamless data flow between engineering and operations teams, enhancing collaboration across the enterprise.

Bucher Municipal
Bucher Municipal A/S adopted Bluestar PLM to connect CAD and ERP systems, centralizing product and manufacturing data within Dynamics 365.

Hannibal Industries
Hannibal Industries chose Bluestar PLM to standardize and automate processes for designing and configuring custom solutions.

SH Group
SH Group successfully implemented Bluestar PLM, enabling engineers to manage data more effectively, improving quality through data reuse and minimizing production errors.

Mobile Technologies
MTI implemented Bluestar PLM in five months, including installation, configuration in Dynamics 365, featuring customization, documentation, and on-site training in the US and Hong Kong.

Rotork
Recognizing the need for a PLM system, Rotork turned to Bluestar PLM, designing its engineering control system within the Dynamics 365 template.

Bel Power Solutions
Bel Power Solutions decided to deploy Bluestar PLM to handle all change management and product documentation.

Dellner Hydratech
Dellner Hydratech implemented Bluestar PLM to seamlessly connect design and production within Dynamics F&SCM, boosting efficiency and reducing data entry errors.
Genuine Parts Company
GPC implemented Bluestar PLM within D365 F&SCM, gaining improved data integrity, visual aids, document retention, and streamlined revision tracking.

Amplifier Research
AR uses Bluestar PLM for core product data management and is so satisfied that it plans to extend it for ECN management.



