user avatar
RDSOLucknow
@RDSOLucknow
Research Designs & Standards Organisation (RDSO), Ministry of Railways is situated at Lucknow, UP. It is the sole R&D organisation of Indian Railways.
Lucknow, India
Joined October 2019
  • user avatar
    The RDSO Testing team is conducting speed trials of the new Vande Sleeper rake. High speed trials at 180 kmph are under way! During the trials, various parameters of the train in empty and loaded condition are being checked in different working conditions. @RailMinIndia
  • user avatar
    RDSO has completed Oscillation Trials of newly designed AC- Double Decker chair car -LHB Coach with 120 seating capacity at speed of 180 KMPH @RailMinIndia
  • user avatar
    RDSO Team is carrying out COCR trials of the 16 coach Namo Bharat Rapid Rail (NBRR) rake between ADI-MCT. The trial is being carried out at an operational speed of 130 kmph, paving the way for speed certification of NBRR rakes at 130 kmph both in 16 coach/ 12 coach
    00:00
  • user avatar
    00:00
  • user avatar
    00:00
  • user avatar
    RDSO is working on a project of National eminence through use of Hydrogen for traction purpose. In this direction, the first Hydrogen fuel cell motor Coach shell has been tested at Indira industries Ranipet, Tamil Nadu. @RailMinIndia @AshwiniVaishnaw
  • user avatar
    Hon'ble MR Shri @AshwiniVaishnaw witnessed the successful trial of KAVACH. #BharatKaKavach #AtmaNirbharBharat
    00:00
  • user avatar
    RDSO's Testing Team has completed Oscillation Trials on the prototype rake of Vande Metro coaches (12 coach formation) upto a Maximum Test Speed of 120 KMPH. The trials were carried out over the Mahoba-Khajuraho section of North Central Railway. @RailMinIndia @AshwiniVaishnaw
  • user avatar
    श्री संजीव भुटानी, महानिदेशक, आरडीएसओ 1 जनवरी 2023 से तीन साल की अवधि के लिए इंटरनेशनल यूनियन ऑफ रेलवे (यूआईसी) के इंटरनेशनल रेल रिसर्च बोर्ड (आईआरआरबी) के अध्यक्ष चुने गए l @RailMinIndia
  • user avatar
    RDSO starts Oscillation Trials of Flat Wagon Type ‘RORO’. These oscillation trials were started on 19 April 2022 over Mahoba- Khajuraho section of North Central Railway and expected to be completed by 6th May 2022. #hungry4cargo
  • user avatar
    RDSO team has recently issued speed certificate to conduct oscillation trials of Bengaluru Metro Railway Reach-5 new line (Yellow Line). Reach-5 New Line (Yellow line) pertaining to the Phase-II BMRCL Project consists of 16 stations over a stretch of 19.15 kms from RV Road to
  • user avatar
  • user avatar
    00:00
  • user avatar
    RDSO successfully conducted Balancing Speed and Controllability trials of Vande- Bharat Express between Kasara-Igatpuri and Karjat-Lonavala sections of Central Railway #AtmaNirbharBharat #TransformingRailways