Pinned
When D.C. sought $4M to connect 55 locations, NTIA took a closer look.
After two hours of on-the-ground oversight, we found the “unserved” sites were open fields or already-connected.
Result: $0 approved. Read how it happened from @ArielleRothNTIA:










