• Hi I’m testing Polylang with free version of Pie Calendar for a two languages site.

    I have set Polylang to synchronize the custom fields between translations, but it doesn’t synchronize the calendar settings, neither the “Show On Calendar” toggle, the “All day Event” toggle nor Start and End dates.

    The plugin developer says that it might be an issue with Polylang’s ability to translate react UI components (e.g. the controls in the Block Editor side bar).

    I have checked on the database and the original post have the postmeta “_piecal” meta_keys but the translation doesn’t have this meta_keys values.

    The developer also commented If you can point to something specific that they are or are not doing that’s interfering.

    There’s or you can point a solution?

The topic ‘Synchronize react UI components’ is closed to new replies.