Portfolio

Problem solving, put into action.

Challenging sites, complex requirements, ambitious schedules. Every detail is an opportunity to flex our problem-solving muscles.

Featured Projects

Here are a few of the projects we've been talking about lately.

Coming Soon

Coming Soon

Coming Soon

Towne Center Retail Building

Port Facility Storage Expansion

Grain Export Facility

Industrial Center

Robotic Sorting Center

Delivery Station and Parking Structure

Transload Facility

Hollywood Theater

Lat14 Restaurant Conversion

True Friends Camp Courage Recreation Center

Minikahda Country Club Ballroom

Pueblo of Isleta Hotel & Convention Center

VAA Gensler MACP Eden Prairie MN

Food Manufacturing Facility

Freezer Expansion

Baking Facility Addition

Grain Facility Expansion

Oat Milling Facility Expansion

Fertilizer Plants Designed

Fertilizer Terminals Upgrades

Mineral Refining Consolidation

Frac Sand Rail Expansion

Elevator Feed Mill

Malt Production Facilities

300 TPH Sand Screening Facility

Seed Conditioning Facility

Flat Storage Dairy Feed Facility

Replacement Feed Mill

Malting Facility Expansion

8-Level Grain Cleaning Expansion

Shuttle Train Facility

Brewing Facility Expansion

Fromm Family Foods Pet Food Expansion

Canola Process Facility Rail

Protein Enhancement Facility

Soybean Processing Plant

Cuningham Group The Boathouse

Crude Oil Transload Facility

TEMCO Ship Loading Rain Shield

Portfolio Overview

Over our 45-year history, VAA has completed thousands of projects in a broad range of industries and geographic locations. Explore a few of the unique solutions we've developed to address client challenges.

All Projects
  • All Projects
  • Master Planning
  • Port and River Terminal Design
  • Civil Engineering
  • Rail Design
  • General Arrangement
  • Process Engineering
  • Industrial Architecture
  • Structural Engineering
  • Mechanical Engineering
  • Electrical Engineering
  • Marine Engineering
  • Origination
  • Processing
  • Manufacturing
  • Consumer & Service
  • Distribution
Coming Soon
Coming Soon
Coming Soon
Towne Center Retail Building
Port Facility Storage Expansion
Grain Export Facility
Industrial Center
Robotic Sorting Center
Delivery Station and Parking Structure
Transload Facility
Hollywood Theater
Lat14 Restaurant Conversion
True Friends Cambria Rec Center - VAA
True Friends Camp Courage Recreation Center
Minikahda Country Club Ballroom
Pueblo of Isleta Hotel & Convention Center
VAA Gensler MACP Eden Prairie MN
Food Manufacturing Facility
Freezer Expansion
Baking Facility Addition
Grain Facility Expansion
Oat Milling Facility Expansion
Fertilizer Plants Designed
Fertilizer Terminals Upgrades
Mineral Refining Consolidation
Frac Sand Rail Expansion
Elevator Feed Mill
VAA provided structural engineering and industrial architecture services for CFE’s new 780,000 tons/year feed mill, now one of the largest feed mills in the state.
Malt Production Facilities
VAA’s multidisciplinary team provided designs and facility layout for the expansion of two facilities, each now capable of producing 25,000 metric tons of malt per year.
300 TPH Sand Screening Facility
VAA’s multidisciplinary team provided designs and facility layout for the expansion of two facilities, each now capable of producing 25,000 metric tons of sand per year.
Seed Conditioning Facility
VAA led design efforts to upgrade a seed conditioning facility.
Flat Storage Dairy Feed Facility
VAA designed the first dairy mash feed mill in Michigan, resulting in a facility with a 35 ton/hour capacity with extensive safety features.
Replacement Feed Mill
VAA served as the primary design consultant on a new poultry feed mill, using 3D models for layout and design. The resulting mill is capable of producing over 15,000 tons of pelleted feed per week.
Malting Facility Expansion
VAA designed critical components, overcoming a challenging footprint, to help increase processing capacity by 120 percent.
Exterior view of large grain cleaning facility with vehicles parked in the foreground
8-Level Grain Cleaning Expansion
VAA provided comprehensive planning and design within an aggressive 18-month timeframe.
Exterior view of Crystal Valley Co-Op Shuttle Train Facility
Shuttle Train Facility
VAA designed a shuttle train facility capable of handling 3.8 million bushels of corn or soybeans with a loadout capacity of 80,000 bushels/hour.
Interior view of a brewery's stills with a yellow walking plank
Brewing Facility Expansion
VAA was selected to expand the headquarters of Summit Brewing to facilitate their entry into the canning market. The project had three phases including building expansion, new pipelines, and extensive remodeling.
Fromm Family Foods Pet Food Expansion
VAA provided design services which allowed Fromm Family Foods to reduce truck receiving time by more than half while adding nearly four million pounds of storage to the facility, all while maintaining plant operations.
Exterior view of a rail moving toward the horizon and blue sky
Canola Process Facility Rail
VAA’ s multidiscipline team designed a facility capable of producing 850,000 metric tons of canola per year, including a challenging rail design that enabled trains to enter the facility at high speeds while minimizing residential highway blockage.
Protein Enhancement Facility
VAA’s multidisciplinary team designed a first-of-its-kind animal nutrition production facility capable of loading out 1,250 tons of final product per hour. Project included the design of complex structures capable of housing substantial equipment loads as well as a compact conveying system designed as a cost saving measure.
Overhead view of large Soybean Processing Plant
Soybean Processing Plant
VAA’s multidisciplinary engineering team produced 2,294 construction and fabrication drawings used to create a 3,800 TPD soybean processing facility on a 435-acre site capable of processing more than 40 million bushels/year.
Daytime exterior shot of a vintage boathouse with a pier and boats parked alongside
Cuningham Group The Boathouse
Meticulous design for a very complex 18,000 SF, 400-seat eatery. The structure includes a 38-foot clear story portion, a two-story portion, a 70-foot tower element, a dock bar and boardwalk areas.
Exterior view of a large steel building with rails in the foreground
Crude Oil Transload Facility
Designed a facility that includes two 120,000-barrel crude oil storage tanks, a truck receiving area, rail loading, LACT system, and pumping capabilities. The plan included strategically allocated space for a future on-site refinery.
Wide exterior shot of a large ship at a port with a city in the background
TEMCO Ship Loading Rain Shield
VAA was brought in to determine a viable solution to remedy a substantial ship loading disruption due to rainfall each year. We designed a cantilevered roof nearly 9/10 of an acre in size that could be supported by current dock structures.

Let’s connect.

Interested in learning more? Looking for a specific area of expertise?

Scroll to Top