Drill Pipe Inspection

SCOPE This document recommends standards procedures for conducting an inspection program on drill stem components. Inspection and disassembly of equipment such as jars, and hole openers are not covered. PURPOSE To reduce inspection errors. The program defines: What method to use on which component A step by step procedure for each method What defines acceptable … Continue reading Drill Pipe Inspection

BOP Testing, Inspection and Maintenance

(a) BOP pressure testing timeframes.You must pressure test your BOP system: When installed; and Before 14 days have elapsed since your last BOP pressure test. You must begin to test your BOP system before 12 a.m. (midnight) on the 14th day following the conclusion of the previous test. (b) BOP test pressures.When you test the … Continue reading BOP Testing, Inspection and Maintenance