Resource Leveling Module for dotProject1.0.5
Continue to app
Free Version
Publisher Description
A simple resource leveling module for dotProject (). It is intended to fill the lack of this functionality in version 2.x of the software.
About Resource Leveling Module for dotProject
Resource Leveling Module for dotProject is a free software published in the Project Management list of programs, part of Business.
This Project Management program is available in English. It was last updated on 12 March, 2026. Resource Leveling Module for dotProject is compatible with the following operating systems: Linux, Mac, Windows.
The company that develops Resource Leveling Module for dotProject is dsaran. The latest version released by its developer is 1.0.5. This version was rated by 7 users of our site and has an average rating of 2.3.
The download we have available for Resource Leveling Module for dotProject has a file size of 23.6 KB. Just click the green Download button above to start the downloading process. The program is listed on our website since 2014-03-05 and was downloaded 330 times. We have already checked if the download link is safe, however for your own protection we recommend that you scan the downloaded software with your antivirus. Your antivirus may detect the Resource Leveling Module for dotProject as malware if the download link is broken.
How to install Resource Leveling Module for dotProject on your Windows device:
This Project Management program is available in English. It was last updated on 12 March, 2026. Resource Leveling Module for dotProject is compatible with the following operating systems: Linux, Mac, Windows.
The company that develops Resource Leveling Module for dotProject is dsaran. The latest version released by its developer is 1.0.5. This version was rated by 7 users of our site and has an average rating of 2.3.
The download we have available for Resource Leveling Module for dotProject has a file size of 23.6 KB. Just click the green Download button above to start the downloading process. The program is listed on our website since 2014-03-05 and was downloaded 330 times. We have already checked if the download link is safe, however for your own protection we recommend that you scan the downloaded software with your antivirus. Your antivirus may detect the Resource Leveling Module for dotProject as malware if the download link is broken.
How to install Resource Leveling Module for dotProject on your Windows device:
- Click on the Download button on our website. This will start the download from the website of the developer.
- Once the Resource Leveling Module for dotProject is downloaded click on it to start the setup process (assuming you are on a desktop computer).
- When the installation is finished you should be able to see and run the program.
Program Details
System requirements
Operating systems
mac,windows,linux
Download information
File size
23.6 KB
Total downloads
330
Pricing
License model
Free
Price
Version History
Here you can find the changelog of Resource Leveling Module for dotProject since it was posted on our website on 2015-04-27. The latest version is 1.0.5 and it was updated on Soft112 on 12 March, 2026. See below the changes in each version:
version 1.0.5
posted on 2014-03-05
version 1.0.4
posted on 2008-09-10
Several fixes and updates



