About RealTime Scheduler
Schedule when to turn on and off WiFi, Bluetooth and Mobile Data during the day to conserve battery and save cost by ensuring that your phone runs efficiently. Why have WiFi, Bluetooth and Mobile Data on when you are not...
Schedule when to turn on and off WiFi, Bluetooth and Mobile Data during the day to conserve battery and save cost by ensuring that your phone runs efficiently.
Why have WiFi, Bluetooth and Mobile Data on when you are not using them and waste battery.
With RealTime Scheduler you can have unlimited schedule of actions to turn on and off WiFi, Bluetooth, Mobile Data, AutoSync,Silent Mode,Vibrate Mode,Normal(Loud) Mode at any specific time of the day repeatedly.
Have RealTime Scheduler automatically turn on WiFi in the morning, turn off when you leave the house or office, turn on Silent Mode when you go to sleep, turn on Sound when when you wake up.
RealTime Scheduler runs in the background, taking care of all your scheduled phone actions/tasks for the day. There is also the option of pausing all schedules(Vacation Mode), allowing you to temporarily suspend execution of all or a specific task. .
RealTime Scheduler can be a lifesaver for a number of reasons. For example you can easily configure RealTime Scheduler to automatically turn your Wi-Fi/Bluetooth,Mobile Data, on or off according to your desired schedule. The app can be very useful in situations when you always forget to switch off your Wi-Fi connection or you just want to save some battery for your device.
The app is also a handy tool for those who frequently travel long distances, those who are studying, those who don’t want to be disturbed at certain hours of the day (or days in the week), those who want to control cost of mobile data and those who wish to save battery life.
Realtime Scheduler offers a customizable theme for the best user experience and it is also tablet optimized.
Currently available Actions are;
* WIFI ON
* WIFI OFF
* BLUETOOTH ON
* BLUETOOTH OFF
* AUTO-SYNC ON
* AUTO-SYNC OFF
* NORMAL MODE
* VIBRATE MODE
* SILENT MODE
* MOBILE DATA ON (Does not work on all devices due to device manufacturers' constraints)
* MOBILE DATA OFF
* REMINDER
Watch out for Many more actions you will ever need to completely automate your phone.
***RealTime Scheduler does not check for wifi connection or automatically connects your device to the wifi network. It only turns on and off wifi. So be rest assured the app has zero negative impact on your battery.
Previous Versions
Here you can find the changelog of RealTime Scheduler since it was posted on our website on 2016-10-01 00:23:43.
The latest version is 2.0.0 and it was updated on 2026-06-15 14:54:32. See below the changes in each version.
RealTime Scheduler version 2.0.0
Updated At: 2014-10-10
Changes: Added REMINDER action.Now you can schedule a reminder and never miss any import routine task.
Disclaimer
Official Google Play Link
We do not host RealTime Scheduler on our servers. We did not scan it for viruses, adware, spyware or other type of malware. This app is hosted by Google and passed their terms and conditions to be listed there. We recommend caution when installing it.
The Google Play link for RealTime Scheduler is provided to you by apps112.com without any warranties, representations or guarantees of any kind, so access it at your own risk.
If you have questions regarding this particular app contact the publisher directly. For questions about the functionalities of apps112.com contact us.