Oracle Primavera Cloud26.3.0



Publisher Description

Oracle Primavera Cloud -

Use the Oracle Primavera Cloud app to monitor the health of your projects.

By installing this app, you agree to the End User License Agreement terms at http://docs.oracle.com/cd/E91857_01/EULA/en/eula.htm.

Use the Oracle Primavera Cloud app (formerly Oracle Primavera Projects) to update progress and monitor the health and performance of your projects. Oracle Primavera Cloud supports offline access and provides the following capabilities:

• Access multiple projects while offline.

• Provide on-site progress updates for your assigned work on projects, including tasks and activities.

• Powerful overviews quickly provide insight into the performance of your projects and highlight missed and upcoming deadlines.

• Visually manage work plans and communicate with task performers from all partner companies.

• Browse and view project files, and save them for access while offline.

Note: For full functionality, a current license and connection to Oracle Primavera Cloud are required. The app includes a demo mode that enables you to evaluate the app without a license or connection.



About Oracle Primavera Cloud

Oracle Primavera Cloud is a free app for Android published in the Office Suites & Tools list of apps, part of Business.

The company that develops Oracle Primavera Cloud is Oracle America, Inc.. The latest version released by its developer is 26.3.0.

To install Oracle Primavera Cloud on your Android device, just click the green Continue To App button above to start the installation process. The app is listed on our website since 2026-03-03 and was downloaded 54 times. We have already checked if the download link is safe, however for your own protection we recommend that you scan the downloaded app with your antivirus. Your antivirus may detect the Oracle Primavera Cloud as malware as malware if the download link to com.oracle.cegbu.prime.project is broken.

How to install Oracle Primavera Cloud on your Android device:

  • Click on the Continue To App button on our website. This will redirect you to Google Play.
  • Once the Oracle Primavera Cloud is shown in the Google Play listing of your Android device, you can start its download and installation. Tap on the Install button located below the search bar and to the right of the app icon.
  • A pop-up window with the permissions required by Oracle Primavera Cloud will be shown. Click on Accept to continue the process.
  • Oracle Primavera Cloud will be downloaded onto your device, displaying a progress. Once the download completes, the installation will start and you'll get a notification after the installation is finished.

Program Details


General

Publisher
Released Date
2026-03-03
Languages
English

Category

Category
Subcategory

System requirements

Operating systems
Android

Download information

File size
N/A
Total downloads
54

Pricing

License model
Free
Price

Version History


Here you can find the changelog of Oracle Primavera Cloud since it was posted on our website on 2023-12-30. The latest version is 26.3.0 and it was updated on Soft112 on 12 March, 2026. See below the changes in each version:

version 26.3.0

posted on 2026-03-03

* Print the Work Plan report in a different language than the one already configured to your device.
* Minor bug fixes and changes to ensure a consistent and stable experience.

version 26.1

posted on 2025-12-10

* Minor bug fixes and changes to ensure a consistent and stable experience.

version 25.9

posted on 2025-09-04

* Swimlane headers display Task Color settings identified for companies and codes.
* Tasks with hand-offs can now be completed earlier than their planned due date.
* Minor bug fixes and changes to ensure a consistent and stable experience.

version 25.7.1

posted on 2025-07-24

* Specify the crew size needed to complete a task and manage it, along with other task details, as the task progresses.
* Easily identify the current date when using the calendar view on the Work Plan screen.
* Minor bug fixes and changes to ensure a consistent and stable experience.

version 25.5.0

posted on 2025-04-30

* Automatically display descendent nodes with a parent when filtering records by hierarchical objects.
* Preview and confirm assignment changes when moving tasks on the Work Plan screen.
* Minor bug fixes and changes to ensure a consistent and stable experience.

version 25.1.0

posted on 2025-01-06

* Manage a personalized and comprehensive task list using My Tasks.
* Drag and drop task cards from a quick-add drawer, and assign due dates to unplanned tasks from the hopper on the Work Plan.
* Minor bug fixes and changes to ensure a consistent and stable experience.

version 24.11.1

posted on 2024-10-30

* View task constraint icons on the Work Plan.
* Receive a notification when another user has modified or deleted your task plan.
* Use updated homescreen icons that are more consistent with the web interface.
* Minor bug fixes and changes to ensure a consistent and stable experience.

version 24.9.0

posted on 2024-09-03

* Arrange swimlanes by activity code on the Work Plan page.
* View status icons on task cards for incomplete tasks.
* Minor bug fixes and changes to ensure a consistent and stable experience.

version 24.7.0

posted on 2024-07-08

* Arrange swimlanes by task code on the Work Plan page.
* Non-work time on the Work Plan calendar has been visually reduced to maximize screen space.
* Minor bug fixes and changes to ensure a consistent and stable experience.

version 24.5.0

posted on 2024-05-03

* Arrange swimlanes by WBS and edit task WBS from the Work Plan page.
* Project-specific codes can be made available to tasks. Customize view options to display assigned project-specific codes along with other task details.
* Minor bug fixes and changes to ensure a consistent and stable experience.






Click stars to rate this APP!

Users Rating:
  0.0/5     0
Downloads: 54
Updated At: 2026-03-12
Operating System: Android
License Type: Free