Integrated Field Plan Execution Services in Satellite Fields in RJ-ON 90/1 Block-surface Facilities

  • Pipe Installation :  Well Pad WRP01 to WRP03
  • Location : Job 4″ CS SMLS Pipe API 5L X 52 DRL
  • Coating Material : External 3LPP Coating
  • Coating Spec : DECO-RX-Y-SP-2003 / DIN 30678

Zuluf Water Treatment Plant

  • Project No: WT 2201
  • Job :8″ to 48″ Puddle Flanges
  • Coating Material :Fusion Bonded Epoxy (FBE)
  • Coating Spec: 09-SAMSS-091 / APCS-102B
  • Application: Formation Water Service

EPC for ADCOP remaining works at MOT, MPS, and IPS – (Package 1 & 2)

  • ADNOC Onshore Project No : P24026 & P24010Job : 4″ to 10″ Y Strainers
  • Internal Coating Material : Fusion Bonded Epoxy (FBE)
  • Internal Coating Spec : P24026-30-99-90-1955
  • Internal Coating Grade : Corvel EP-10 & 10-8158

Marjan Increment Program (MIP) Pkg.01 - Offshore Gosp-4 Development(BI-10-12201)

  • Job :4″ to 24″ Y Strainers
  • Internal Coating Material: Fusion Bonded Epoxy (FBE)
  • Internal Coating Spec  : 09-SAMSS-091 / APCS 102B

Lower Zakum LTPD-1 (NMGL)

  • Job : FIRE HYDRANTS 4″ & 6″ Stand Post 2 Way & 4 Way
  • Internal Coating Material: Fusion Bonded Epoxy (FBE)
  • Internal Coating Grade: Corvel EP-10 & 10-8158

E1150 Engineering, Procurement & Construction For 1.0 MMBD Sustain Phase 1 Surface Facilities Project

  • Job : Air Manifold
  • External Coating Material : Three Coat System
  • External Coating Grade : 1 Coat – Penguard Primer, 2 Coat – Pengaurd MIO 80 , 3 Coat – Hardtop XP
  • Job : 3D BEND 12” 90° & 45°
  • External Coating Material : 3 LPE
  • External Coating Grade : FBE+ADHESIVE+HDPE BLACK

5040-200-Debottleneck Safaniya Project

  • Job : 24” Venturi Flow Meter (Fabricated)
  • External Coating Material : FBE With Primer
  • External Coating Grade : Primer Karumel PP100 + FBE KC

Hail & Ghasha Development Project Package-1-Offshore Facilities

  • Job : Flame Arrestors
  • External Coating Material : Epoxy HR + Hardtop XP (BS 00E 55)
  • External Coating Grade : Phenolic Epoxy Primer + Polyurethane Top Coat

Upgrade SRU – Yanbu Refinery Projec

  • Job : SFI Body
  • Internal Coating Material : FBE Coating With Primer
  • Internal Coating Grade : Primer Karumel PP100 + FBE KCC

Arada Water Transmission System Phase-2

  • Job : 250 mm 300 CL Ball Valve , 300 mm 300 CL Ball Valve
  • ID + OD Coating Material : FBE Coating Jotun Blue
  • Internal Coating Grade : Polyurethane Coat – Hardtop XP (BS 00E 55)