- Pipe Installation : Well Pad WRP01 to WRP03
- Location : Job 4″ CS SMLS Pipe API 5L X 52 DRL
- Coating Material : External 3LPP Coating
- Coating Spec : DECO-RX-Y-SP-2003 / DIN 30678
Projects
Integrated Field Plan Execution Services in Satellite Fields in RJ-ON 90/1 Block-surface Facilities
CLIENT

MAIN CONTRACTOR

ENGINEERING CONSULTANT

SUB CONTRACTOR






Zuluf Water Treatment Plant
CLIENT

PROJECT COMPANY

EPC


- Project No: WT 2201
- Job :8″ to 48″ Puddle Flanges
- Coating Material :Fusion Bonded Epoxy (FBE)
- Coating Spec: 09-SAMSS-091 / APCS-102B
- Application: Formation Water Service




EPC for ADCOP remaining works at MOT, MPS, and IPS – (Package 1 & 2)
CLIENT

CONTRACTOR

CONSULTANT

VENDOR


- ADNOC Onshore Project No : P24026 & P24010Job : 4″ to 10″ Y Strainers
- Internal Coating Material : Fusion Bonded Epoxy (FBE)
- Internal Coating Spec : P24026-30-99-90-1955
- Internal Coating Grade : Corvel EP-10 & 10-8158




Marjan Increment Program (MIP) Pkg.01 - Offshore Gosp-4 Development(BI-10-12201)
CLIENT

CONTRACTOR

CONSULTANT

VENDOR


- Job :4″ to 24″ Y Strainers
- Internal Coating Material: Fusion Bonded Epoxy (FBE)
- Internal Coating Spec : 09-SAMSS-091 / APCS 102B



Lower Zakum LTPD-1 (NMGL)
CLIENT

EPC CONTRACTOR

VENDOR


- Job : FIRE HYDRANTS 4″ & 6″ Stand Post 2 Way & 4 Way
- Internal Coating Material: Fusion Bonded Epoxy (FBE)
- Internal Coating Grade: Corvel EP-10 & 10-8158




E1150 Engineering, Procurement & Construction For 1.0 MMBD Sustain Phase 1 Surface Facilities Project
CUSTOMER

EPC/PMC CONTRACTOR

END USER


- Job : Air Manifold
- External Coating Material : Three Coat System
- External Coating Grade : 1 Coat – Penguard Primer, 2 Coat – Pengaurd MIO 80 , 3 Coat – Hardtop XP




JOB DESCRIPTION
3 LPE Coating on Bend 12” 90° & 45°
END USER
Seabridge Terminal Pvt. Ltd

- Job : 3D BEND 12” 90° & 45°
- External Coating Material : 3 LPE
- External Coating Grade : FBE+ADHESIVE+HDPE BLACK

5040-200-Debottleneck Safaniya Project
EPC/PMC CONTRACTOR

END USER


- Job : 24” Venturi Flow Meter (Fabricated)
- External Coating Material : FBE With Primer
- External Coating Grade : Primer Karumel PP100 + FBE KC


Hail & Ghasha Development Project Package-1-Offshore Facilities
EPC/PMC CONTRACTOR

END USER


- Job : Flame Arrestors
- External Coating Material : Epoxy HR + Hardtop XP (BS 00E 55)
- External Coating Grade : Phenolic Epoxy Primer + Polyurethane Top Coat




Upgrade SRU – Yanbu Refinery Projec
EPC/PMC CONTRACTOR

END USER


- Job : SFI Body
- Internal Coating Material : FBE Coating With Primer
- Internal Coating Grade : Primer Karumel PP100 + FBE KCC


Arada Water Transmission System Phase-2
EPC/PMC CONTRACTOR

END USER


- Job : 250 mm 300 CL Ball Valve , 300 mm 300 CL Ball Valve
- ID + OD Coating Material : FBE Coating Jotun Blue
- Internal Coating Grade : Polyurethane Coat – Hardtop XP (BS 00E 55)