Skip to content

Revert "Graduate PodLifecycleSleepAction to GA"#128627

Merged
k8s-ci-robot merged 1 commit into
kubernetes:masterfrom
kannon92:revert-128046-ga3960
Nov 7, 2024
Merged

Revert "Graduate PodLifecycleSleepAction to GA"#128627
k8s-ci-robot merged 1 commit into
kubernetes:masterfrom
kannon92:revert-128046-ga3960

Conversation

@kannon92

@kannon92 kannon92 commented Nov 6, 2024

Copy link
Copy Markdown
Contributor

Reverts #128046

#128613 (comment)

We found that this feature does not have any periodics verifying that the feature is working as intended in the CI.

We should have a periodic that runs this suite before we promote this feature to stable.

Remember, Adding a e2e test will not guarantee it runs in our CI. You have to include that feature. It seems that there is a presubmit for this feature but we are missing a periodic.

NONE

@k8s-ci-robot k8s-ci-robot added size/M Denotes a PR that changes 30-99 lines, ignoring generated files. do-not-merge/release-note-label-needed Indicates that a PR should not merge because it's missing one of the release note labels. cncf-cla: yes Indicates the PR's author has signed the CNCF CLA. do-not-merge/needs-kind Indicates a PR lacks a `kind/foo` label and requires one. do-not-merge/needs-sig Indicates an issue or PR lacks a `sig/foo` label and requires one. needs-triage Indicates an issue or PR lacks a `triage/foo` label and requires one. needs-priority Indicates a PR lacks a `priority/foo` label and requires one. labels Nov 6, 2024
@k8s-ci-robot k8s-ci-robot requested review from aojea and liggitt November 6, 2024 21:31
@k8s-ci-robot k8s-ci-robot added area/kubelet area/test sig/node Categorizes an issue or PR as relevant to SIG Node. sig/testing Categorizes an issue or PR as relevant to SIG Testing. and removed do-not-merge/needs-sig Indicates an issue or PR lacks a `sig/foo` label and requires one. labels Nov 6, 2024
@kannon92

kannon92 commented Nov 6, 2024

Copy link
Copy Markdown
Contributor Author

/release-note-none

@k8s-ci-robot k8s-ci-robot added release-note-none Denotes a PR that doesn't merit a release note. and removed do-not-merge/release-note-label-needed Indicates that a PR should not merge because it's missing one of the release note labels. labels Nov 6, 2024
@kannon92

kannon92 commented Nov 6, 2024

Copy link
Copy Markdown
Contributor Author

/kind feature

@k8s-ci-robot k8s-ci-robot added kind/feature Categorizes issue or PR as related to a new feature. and removed do-not-merge/needs-kind Indicates a PR lacks a `kind/foo` label and requires one. labels Nov 6, 2024
@kannon92

kannon92 commented Nov 6, 2024

Copy link
Copy Markdown
Contributor Author

/priority important-soon
/triage accepted

@k8s-ci-robot k8s-ci-robot added priority/important-soon Must be staffed and worked on either currently, or very soon, ideally in time for the next release. triage/accepted Indicates an issue or PR is ready to be actively worked on. and removed needs-priority Indicates a PR lacks a `priority/foo` label and requires one. needs-triage Indicates an issue or PR lacks a `triage/foo` label and requires one. labels Nov 6, 2024
@kannon92

kannon92 commented Nov 6, 2024

Copy link
Copy Markdown
Contributor Author

#128629

unrelated test issue.

/test pull-kubernetes-unit

@liggitt

liggitt commented Nov 6, 2024

Copy link
Copy Markdown
Member

/lgtm
/approve

@k8s-ci-robot k8s-ci-robot added the lgtm "Looks good to me", indicates that a PR is ready to be merged. label Nov 6, 2024
@k8s-ci-robot

Copy link
Copy Markdown
Contributor

LGTM label has been added.

DetailsGit tree hash: 72f51bb22a7c1ecac133b185153aace8f5469873

@k8s-ci-robot k8s-ci-robot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Nov 6, 2024
@thockin

thockin commented Nov 6, 2024

Copy link
Copy Markdown
Member

Sorry, @AxeZhan :(

/approve

@k8s-ci-robot

Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: kannon92, liggitt, thockin

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@SergeyKanzhelev

Copy link
Copy Markdown
Member

/retest

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. area/kubelet area/test cncf-cla: yes Indicates the PR's author has signed the CNCF CLA. kind/feature Categorizes issue or PR as related to a new feature. lgtm "Looks good to me", indicates that a PR is ready to be merged. priority/important-soon Must be staffed and worked on either currently, or very soon, ideally in time for the next release. release-note-none Denotes a PR that doesn't merit a release note. sig/node Categorizes an issue or PR as relevant to SIG Node. sig/testing Categorizes an issue or PR as relevant to SIG Testing. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. triage/accepted Indicates an issue or PR is ready to be actively worked on.

Projects

Archived in project

Development

Successfully merging this pull request may close these issues.

5 participants