Skip to content

Don't test using bazel on master#710

Merged
jetstack-bot merged 1 commit intocert-manager:masterfrom
SgtCoDFish:nobazel
Jun 30, 2022
Merged

Don't test using bazel on master#710
jetstack-bot merged 1 commit intocert-manager:masterfrom
SgtCoDFish:nobazel

Conversation

@SgtCoDFish
Copy link
Copy Markdown
Member

This leaves only the upgrade test using bazel as of now

@SgtCoDFish SgtCoDFish requested a review from irbekrm June 30, 2022 10:11
@jetstack-bot jetstack-bot added dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. area/cert-manager Indicates a PR related to cert-manager approved Indicates a PR has been approved by an approver from all required OWNERS files. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. labels Jun 30, 2022
@SgtCoDFish
Copy link
Copy Markdown
Member Author

/test verify

@SgtCoDFish
Copy link
Copy Markdown
Member Author

/test build

@irbekrm
Copy link
Copy Markdown
Contributor

irbekrm commented Jun 30, 2022

@SgtCoDFish also https://github.com/jetstack/testing/blob/master/config/config.yaml#L39-L40

@SgtCoDFish
Copy link
Copy Markdown
Member Author

@SgtCoDFish also https://github.com/jetstack/testing/blob/master/config/config.yaml#L39-L40

Thank you, I always forget stuff like this!

this leaves only the upgrade test using bazel as of now

Signed-off-by: Ashley Davis <ashley.davis@jetstack.io>
@SgtCoDFish
Copy link
Copy Markdown
Member Author

@irbekrm I also added the make test as required; does it look correct now?

@irbekrm
Copy link
Copy Markdown
Contributor

irbekrm commented Jun 30, 2022

Thanks!

/lgtm
/approve

@jetstack-bot jetstack-bot added the lgtm Indicates that a PR is ready to be merged. label Jun 30, 2022
@jetstack-bot
Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: irbekrm, SgtCoDFish

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@jetstack-bot jetstack-bot merged commit 0ed77e7 into cert-manager:master Jun 30, 2022
@jetstack-bot
Copy link
Copy Markdown
Contributor

@SgtCoDFish: Updated the following 2 configmaps:

  • job-config configmap in namespace default at cluster default using the following files:
    • key cert-manager-presubmits.yaml using file config/jobs/cert-manager/cert-manager/cert-manager-presubmits.yaml
  • config configmap in namespace default at cluster default using the following files:
    • key config.yaml using file config/config.yaml
Details

In response to this:

This leaves only the upgrade test using bazel as of now

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

@irbekrm
Copy link
Copy Markdown
Contributor

irbekrm commented Jun 30, 2022

Ahh wait, do we not have to remove pull-cert-manager-deps?

@irbekrm
Copy link
Copy Markdown
Contributor

irbekrm commented Jun 30, 2022

Ahh wait, do we not have to remove pull-cert-manager-deps

I'll do that in a separate PR. Apart from that I think it was right

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. area/cert-manager Indicates a PR related to cert-manager dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. lgtm Indicates that a PR is ready to be merged. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants