Skip to content

Refactor stub libraries structure#845

Merged
sim642 merged 8 commits intomasterfrom
issue-814
Oct 24, 2022
Merged

Refactor stub libraries structure#845
sim642 merged 8 commits intomasterfrom
issue-814

Conversation

@sim642
Copy link
Copy Markdown
Member

@sim642 sim642 commented Oct 4, 2022

Closes #814.

TODO

  • Adapt SV-COMP 2023 setup #859 to new layout.
  • Before merging this into master, merge master into this and make same changes in all the tests added on master meanwhile.

@sim642 sim642 added cleanup Refactoring, clean-up testing preprocessing C preprocessing labels Oct 4, 2022
@sim642 sim642 self-assigned this Oct 10, 2022
@sim642 sim642 mentioned this pull request Oct 18, 2022
1 task
@sim642 sim642 added this to the v2.1.0 milestone Oct 24, 2022
@sim642 sim642 merged commit 24ad290 into master Oct 24, 2022
@sim642 sim642 deleted the issue-814 branch October 24, 2022 10:45
sim642 added a commit to sim642/opam-repository that referenced this pull request Nov 25, 2022
CHANGES:

Functionally equivalent to Goblint in SV-COMP 2023.

* Add automatic configuration tuning (goblint/analyzer#772).
* Add many library function specifications (goblint/analyzer#865, goblint/analyzer#868, goblint/analyzer#878, goblint/analyzer#884, goblint/analyzer#886).
* Reorganize library stubs (goblint/analyzer#814, goblint/analyzer#845).
* Add Trace Event Format output to timing (goblint/analyzer#844).
* Optimize domains for address and path sets (goblint/analyzer#803, goblint/analyzer#809).
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

cleanup Refactoring, clean-up preprocessing C preprocessing testing

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Polish __goblint_check

2 participants