Skip to content

TPI-008 eval-first monkey model git auth recovery gate#7

Draft
gb250e wants to merge 6 commits intoexp/eval-first-007from
exp/eval-first-008
Draft

TPI-008 eval-first monkey model git auth recovery gate#7
gb250e wants to merge 6 commits intoexp/eval-first-007from
exp/eval-first-008

Conversation

@gb250e
Copy link
Copy Markdown
Owner

@gb250e gb250e commented Mar 21, 2026

Purpose

This is the TPI-008 internal review PR.

TPI-007 produced valid local state, but that state could not be reflected remotely because HTTPS push stalled on Git authentication. TPI-008 isolates Git auth recovery and remote reflection as the next highest-value move.

Thesis

When local TPI state exists but cannot be pushed, the highest-value move is to restore Git push/auth capability and reflect the pending local commits remotely before continuing any further handoff or execution loop.

Scope

What is included

  • git auth recovery plan
  • remote reflection contract
  • push decision surface
  • PR summary placeholder for the next update

What is intentionally not included yet

  • new model mechanism
  • tokenizer changes
  • new handoff-discovery work
  • execution resume work before remote reflection is fixed

Expected next step

  1. inspect the currently configured remote/auth path
  2. choose one working push route (HTTPS fixed or SSH)
  3. push both repos' pending local commits
  4. verify that PR TPI-007 eval-first monkey model external handoff gate #6 now reflects the latest absent-handoff state

Public-facing safety

This branch uses monkey model framing only and is intended to avoid exposing proprietary architecture language.

@gb250e gb250e force-pushed the exp/eval-first-008 branch from f54cda2 to 82eba9d Compare March 21, 2026 08:27
Copy link
Copy Markdown
Owner Author

gb250e commented Mar 21, 2026

LLM review checkpoint for TPI-008

Current assessment

  • recovered is the correct classification.
  • The original bottleneck for this loop was remote reflection failure, and that bottleneck is now resolved on the remote review surfaces.
  • PR TPI-007 eval-first monkey model external handoff gate #6 is again a trustworthy surface for the latest TPI-007 absent-handoff state.

Evidence checked

Consequence

  • Git auth / push recovery is no longer the lead blocker.
  • The lead blocker shifts back to the external provider handoff itself: exact attach route, endpoint tuple, and verified landing in /workspace/parameter-golf.

Required next step

Open TPI-009 as a trusted-remote handoff resume gate.
That loop should:

  1. treat remote review surfaces as trustworthy again
  2. avoid reopening Git auth unless a fresh concrete regression appears
  3. accept only concrete provider-supplied handoff data
  4. resume the unchanged TPI-004 execution contract immediately after landing verification

Control note

This PR mentions a prior --force-with-lease step. No further history-rewriting action should be taken in later loops without explicit user confirmation.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants