Skip to content

Remove debug messages#22282

Merged
kaiyan-sheng merged 1 commit intoelastic:masterfrom
kaiyan-sheng:remove_debug
Oct 29, 2020
Merged

Remove debug messages#22282
kaiyan-sheng merged 1 commit intoelastic:masterfrom
kaiyan-sheng:remove_debug

Conversation

@kaiyan-sheng
Copy link
Copy Markdown
Contributor

Remove these debug messages I commit by mistake...

@botelastic botelastic bot added the needs_team Indicates that the issue/PR needs a Team:* label label Oct 29, 2020
@kaiyan-sheng kaiyan-sheng self-assigned this Oct 29, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

💚 Flaky test report

Tests succeeded.

Expand to view the summary

Test stats 🧪

Test Results
Failed 0
Passed 1947
Skipped 259
Total 2206

@elasticmachine
Copy link
Copy Markdown
Contributor

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: [Pull request #22282 opened]

  • Start Time: 2020-10-29T19:00:29.571+0000

  • Duration: 50 min 20 sec

Test stats 🧪

Test Results
Failed 0
Passed 1947
Skipped 259
Total 2206

@kaiyan-sheng kaiyan-sheng merged commit 985314a into elastic:master Oct 29, 2020
@kaiyan-sheng kaiyan-sheng deleted the remove_debug branch October 29, 2020 20:37
@kaiyan-sheng kaiyan-sheng added v7.10.0 Team:Platforms Label for the Integrations - Platforms team labels Oct 29, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

Pinging @elastic/integrations-platforms (Team:Platforms)

@botelastic botelastic bot removed the needs_team Indicates that the issue/PR needs a Team:* label label Oct 29, 2020
v1v added a commit to v1v/beats that referenced this pull request Oct 30, 2020
* upstream/master:
  adding timeout options to cisco umbrella and fixing the missing config options in module config.yml (elastic#22295)
  [Metricbeat] Remove io.time from windows (elastic#22237)
  remove debug messages (elastic#22282)
  dependency upgrade: ecszap v0.3.0 (elastic#22267)
  [repo] Add docs + cleanup labels to the categories in the incoming PR template (elastic#22280)
v1v added a commit to v1v/beats that referenced this pull request Oct 30, 2020
* upstream/master:
  adding timeout options to cisco umbrella and fixing the missing config options in module config.yml (elastic#22295)
  [Metricbeat] Remove io.time from windows (elastic#22237)
  remove debug messages (elastic#22282)
  dependency upgrade: ecszap v0.3.0 (elastic#22267)
  [repo] Add docs + cleanup labels to the categories in the incoming PR template (elastic#22280)
kaiyan-sheng pushed a commit that referenced this pull request Oct 30, 2020
(cherry picked from commit 985314a)
kaiyan-sheng pushed a commit that referenced this pull request Oct 30, 2020
(cherry picked from commit 985314a)
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Team:Platforms Label for the Integrations - Platforms team v7.10.0 v7.11.0

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants