Skip to content

Cherry-pick #19349 to 7.x: [Packetbeat] HTTP: Improve support for 100-continue #15830#20234

Merged
marc-gr merged 1 commit intoelastic:7.xfrom
marc-gr:backport_19349_7.x
Jul 28, 2020
Merged

Cherry-pick #19349 to 7.x: [Packetbeat] HTTP: Improve support for 100-continue #15830#20234
marc-gr merged 1 commit intoelastic:7.xfrom
marc-gr:backport_19349_7.x

Conversation

@marc-gr
Copy link
Copy Markdown
Contributor

@marc-gr marc-gr commented Jul 27, 2020

Cherry-pick of PR #19349 to 7.x branch. Original message:

What does this PR do?

Improve support for 100-continue #15830

Checklist

  • My code follows the style guidelines of this project
  • I have commented my code, particularly in hard-to-understand areas
  • I have added tests that prove my fix is effective or that my feature works

How to test this PR locally

nosetests ./tests/system/test_0070_http_100_continue.py

Related issues

#15830

…astic#19349)

* refactor(packet beat): Improve support for 100-continue

* test(packetbeat): 100-continue only generate one event without error

* test(packetbeat): 100-continue only generate one event without error

* Update packetbeat/protos/http/http.go

Co-authored-by: Adrian Serrano <adrisr83@gmail.com>

* delete unused string

* Fix format issue

Co-authored-by: Marc Guasch <marc.guasch@elastic.co>
Co-authored-by: Adrian Serrano <adrisr83@gmail.com>
(cherry picked from commit 41bc8c6)
@marc-gr marc-gr requested a review from a team as a code owner July 27, 2020 09:26
@botelastic botelastic bot added the needs_team Indicates that the issue/PR needs a Team:* label label Jul 27, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

Pinging @elastic/siem (Team:SIEM)

@botelastic botelastic bot removed the needs_team Indicates that the issue/PR needs a Team:* label label Jul 27, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

💚 Build Succeeded

Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: [Pull request #20234 opened]

  • Start Time: 2020-07-27T09:27:08.681+0000

  • Duration: 45 min 16 sec

Test stats 🧪

Test Results
Failed 0
Passed 181
Skipped 1
Total 182

@marc-gr marc-gr merged commit a6a9cd5 into elastic:7.x Jul 28, 2020
@marc-gr marc-gr deleted the backport_19349_7.x branch July 28, 2020 06:55
@zube zube bot removed the [zube]: Done label Oct 26, 2020
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants