Skip to content

[skip-ci] Packit: switch to EPEL instead of centos-stream+epel-next#22432

Merged
openshift-merge-bot[bot] merged 1 commit intocontainers:mainfrom
lsm5:packit-switch-targets
Apr 19, 2024
Merged

[skip-ci] Packit: switch to EPEL instead of centos-stream+epel-next#22432
openshift-merge-bot[bot] merged 1 commit intocontainers:mainfrom
lsm5:packit-switch-targets

Conversation

@lsm5
Copy link
Copy Markdown
Member

@lsm5 lsm5 commented Apr 18, 2024

  • EPEL is the recommended target for further testing with rpm builds.
  • Fix EL9 builds.
  • Do not change c8s for now as it will be removed soon anyway.

Does this PR introduce a user-facing change?

None

- EPEL is the recommended target for further testing with rpm builds.
- Fix EL9 builds.
- Do not change c8s for now as it will be removed soon anyway.

Signed-off-by: Lokesh Mandvekar <lsm5@redhat.com>
@openshift-ci openshift-ci bot added do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. release-note-none labels Apr 18, 2024
@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci bot commented Apr 18, 2024

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: lsm5

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Apr 18, 2024
@lsm5
Copy link
Copy Markdown
Member Author

lsm5 commented Apr 18, 2024

@containers/podman-maintainers PTAL.

The centos-stream+epel-next-9 builds have been failing on recent PRs because of undefined: ecdsa.HashSign which I suspect is an issue with the golang compiler that ended up in that environment. Anyway, epel-9* would be the right job environment to use if we want to add TMT tests and such, so this change would be required anyway.

@lsm5 lsm5 marked this pull request as ready for review April 18, 2024 19:30
@openshift-ci openshift-ci bot removed the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Apr 18, 2024
@Luap99
Copy link
Copy Markdown
Member

Luap99 commented Apr 19, 2024

The centos-stream+epel-next-9 builds have been failing on recent PRs because of undefined: ecdsa.HashSign which I suspect is an issue with the golang compiler that ended up in that environment. Anyway, epel-9* would be the right job environment to use if we want to add TMT tests and such, so this change would be required anyway.

yes see containers/skopeo#2297 (comment) and containers/skopeo#2305

Comment on lines +50 to +51
- epel-9-x86_64
- epel-9-aarch64
Copy link
Copy Markdown
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

should the epel-next-8 above also changed?

Copy link
Copy Markdown
Member Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

We will be removing all el8 stuff once centos8 stream goes EOL end of next month, so let's leave it as is for now.

@Luap99
Copy link
Copy Markdown
Member

Luap99 commented Apr 19, 2024

/lgtm
/hold

Feel free to remove the hold as you like.

@openshift-ci openshift-ci bot added the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Apr 19, 2024
@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Apr 19, 2024
@lsm5
Copy link
Copy Markdown
Member Author

lsm5 commented Apr 19, 2024

/hold cancel

@openshift-ci openshift-ci bot removed the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Apr 19, 2024
@openshift-merge-bot openshift-merge-bot bot merged commit 6b41fa5 into containers:main Apr 19, 2024
@lsm5 lsm5 deleted the packit-switch-targets branch April 19, 2024 12:31
nalind added a commit to nalind/buildah that referenced this pull request Apr 19, 2024
instead of centos-stream+epel-next-9-$arch, mirroring a change which was
just made in containers/podman#22432

Signed-off-by: Nalin Dahyabhai <nalin@redhat.com>
nalind added a commit to nalind/buildah that referenced this pull request Apr 22, 2024
instead of centos-stream+epel-next-9-$arch, mirroring a change which was
just made in containers/podman#22432

Signed-off-by: Nalin Dahyabhai <nalin@redhat.com>
@stale-locking-app stale-locking-app bot added the locked - please file new issue/PR Assist humans wanting to comment on an old issue or PR with locked comments. label Jul 19, 2024
@stale-locking-app stale-locking-app bot locked as resolved and limited conversation to collaborators Jul 19, 2024
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. locked - please file new issue/PR Assist humans wanting to comment on an old issue or PR with locked comments. release-note-none

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants