Skip to content

[release-1.18] Fix typo in Certificate.Spec.SignatureAlgorithm documentation#7790

Merged
cert-manager-prow[bot] merged 2 commits into
cert-manager:release-1.18from
cert-manager-bot:cherry-pick-7789-to-release-1.18
Jun 10, 2025
Merged

[release-1.18] Fix typo in Certificate.Spec.SignatureAlgorithm documentation#7790
cert-manager-prow[bot] merged 2 commits into
cert-manager:release-1.18from
cert-manager-bot:cherry-pick-7789-to-release-1.18

Conversation

@cert-manager-bot

Copy link
Copy Markdown
Contributor

This is an automated cherry-pick of #7789

/assign wallrj

NONE

Signed-off-by: Richard Wall <richard.wall@cyberark.com>
Signed-off-by: Richard Wall <richard.wall@cyberark.com>
@cert-manager-prow cert-manager-prow Bot added release-note-none Denotes a PR that doesn't merit a release note. dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. labels Jun 10, 2025
@cert-manager-prow cert-manager-prow Bot added area/api Indicates a PR directly modifies the 'pkg/apis' directory area/deploy Indicates a PR modifies deployment configuration needs-kind Indicates a PR lacks a `kind/foo` label and requires one. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. labels Jun 10, 2025

@wallrj wallrj left a comment

Copy link
Copy Markdown
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/approve
/lgtm

@cert-manager-prow cert-manager-prow Bot added the lgtm Indicates that a PR is ready to be merged. label Jun 10, 2025
@cert-manager-prow

Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: wallrj

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@cert-manager-prow cert-manager-prow Bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Jun 10, 2025
@wallrj

wallrj commented Jun 10, 2025

Copy link
Copy Markdown
Member

/kind cleanup

@cert-manager-prow cert-manager-prow Bot added kind/cleanup Categorizes issue or PR as related to cleaning up code, process, or technical debt. and removed needs-kind Indicates a PR lacks a `kind/foo` label and requires one. labels Jun 10, 2025
@cert-manager-prow cert-manager-prow Bot merged commit 83dae3e into cert-manager:release-1.18 Jun 10, 2025
6 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. area/api Indicates a PR directly modifies the 'pkg/apis' directory area/deploy Indicates a PR modifies deployment configuration dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. kind/cleanup Categorizes issue or PR as related to cleaning up code, process, or technical debt. lgtm Indicates that a PR is ready to be merged. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants