Skip to content

build: update symbol extractor tests to stabalize the order of the symbols listed#64389

Closed
josephperrott wants to merge 1 commit intoangular:mainfrom
josephperrott:update-symbol-extractor
Closed

build: update symbol extractor tests to stabalize the order of the symbols listed#64389
josephperrott wants to merge 1 commit intoangular:mainfrom
josephperrott:update-symbol-extractor

Conversation

@josephperrott
Copy link
Copy Markdown
Member

Update to ensure that the symbols in the list of extracted symbols is consistent even when multiple bundle files are extracted from.

…mbols listed

Update to ensure that the symbols in the list of extracted symbols is consistent even when multiple bundle files are extracted from.
@josephperrott josephperrott added area: build & ci Related the build and CI infrastructure of the project target: patch This PR is targeted for the next patch release labels Oct 13, 2025
@ngbot ngbot bot modified the milestone: Backlog Oct 13, 2025
@josephperrott josephperrott added the action: merge The PR is ready for merge by the caretaker label Oct 13, 2025
@AndrewKushnir AndrewKushnir removed the request for review from JeanMeche October 13, 2025 17:28
@AndrewKushnir
Copy link
Copy Markdown
Contributor

This PR was merged into the repository. The changes were merged into the following branches:

AndrewKushnir pushed a commit that referenced this pull request Oct 13, 2025
…mbols listed (#64389)

Update to ensure that the symbols in the list of extracted symbols is consistent even when multiple bundle files are extracted from.

PR Close #64389
@angular-automatic-lock-bot
Copy link
Copy Markdown

This issue has been automatically locked due to inactivity.
Please file a new issue if you are encountering a similar or related problem.

Read more about our automatic conversation locking policy.

This action has been performed automatically by a bot.

@angular-automatic-lock-bot angular-automatic-lock-bot bot locked and limited conversation to collaborators Nov 13, 2025
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Labels

action: merge The PR is ready for merge by the caretaker area: build & ci Related the build and CI infrastructure of the project target: patch This PR is targeted for the next patch release

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants