Hi! Thank you for the great project!
We use VRoom to plan fitters. It would be perfect if we could also specify a level of performance for the vehicle.
Example: The service job has a duration of 15 minutes, for example. The driver of Vehicle 1 needs 100% = 15 min because he works normally. However, the driver of Vehicle 2 takes longer and only has an efficiency level of 70% = 19.5 min. He is new at his Job and not so well incorporated.
Of course, someone can also work faster than the average (15min) and would then have, for example, 120%.
Not everyone works as fast as the other and so it can be planned optimally.
Can this feature be integrated?
Hi! Thank you for the great project!
We use VRoom to plan fitters. It would be perfect if we could also specify a level of performance for the vehicle.
Example: The service job has a duration of 15 minutes, for example. The driver of Vehicle 1 needs 100% = 15 min because he works normally. However, the driver of Vehicle 2 takes longer and only has an efficiency level of 70% = 19.5 min. He is new at his Job and not so well incorporated.
Of course, someone can also work faster than the average (15min) and would then have, for example, 120%.
Not everyone works as fast as the other and so it can be planned optimally.
Can this feature be integrated?