Skip to content

[Backport release-23.05] djvulibre: patch multiple CVEs#252323

Merged
vcunat merged 1 commit intostaging-23.05from
backport-246773-to-release-23.05
Sep 3, 2023
Merged

[Backport release-23.05] djvulibre: patch multiple CVEs#252323
vcunat merged 1 commit intostaging-23.05from
backport-246773-to-release-23.05

Conversation

@github-actions
Copy link
Copy Markdown
Contributor

@github-actions github-actions bot commented Aug 30, 2023

Bot-based backport to release-23.05, triggered by a label in #246773.

  • Before merging, ensure that this backport complies with the Criteria for Backporting.
    • Even as a non-commiter, if you find that it does not comply, leave a comment.

Signed-off-by: Henri Rosten <henri.rosten@unikie.com>
(cherry picked from commit eeb19e9)
@github-actions github-actions bot added the 1.severity: security Issues which raise a security issue, or PRs that fix one label Aug 30, 2023
@github-actions github-actions bot mentioned this pull request Aug 30, 2023
12 tasks
@ofborg ofborg bot requested a review from Anton-Latukha August 30, 2023 11:18
@ofborg ofborg bot added 10.rebuild-darwin: 501+ This PR causes many rebuilds on Darwin and should normally target the staging branches. 10.rebuild-darwin: 501-1000 This PR causes many rebuilds on Darwin and should normally target the staging branches. 10.rebuild-linux: 101-500 This PR causes between 101 and 500 packages to rebuild on Linux. labels Aug 30, 2023
@vcunat vcunat changed the base branch from release-23.05 to staging-23.05 September 3, 2023 06:08
@vcunat vcunat merged commit 58abb49 into staging-23.05 Sep 3, 2023
@vcunat vcunat deleted the backport-246773-to-release-23.05 branch September 3, 2023 06:10
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

1.severity: security Issues which raise a security issue, or PRs that fix one 10.rebuild-darwin: 501-1000 This PR causes many rebuilds on Darwin and should normally target the staging branches. 10.rebuild-darwin: 501+ This PR causes many rebuilds on Darwin and should normally target the staging branches. 10.rebuild-linux: 101-500 This PR causes between 101 and 500 packages to rebuild on Linux.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants