Skip to content

MSLF IPH Installed cost per capacity calculation error #1081

@taylorbrown75

Description

@taylorbrown75

Describe the bug
The molten salt linear fresnel IPH miscalculates the "Estimated total installed cost per net capacity" value.

To Reproduce
Steps to reproduce the behavior:

  1. Create Industrial Process Heat Linear Molten Salt model in SAM
  2. Go to Installation costs page
  3. See calculated Estimated total installed cost per net capacity

Expected behavior
Value should be Total Installed Cost / Nameplate capacity. Issue is due to a unit conversion.

Desktop (please complete the following information):

  • OS: [Windows]
  • Version [2023.9.19]

Metadata

Metadata

Assignees

Labels

cspconcentrating solar power

Type

No type
No fields configured for issues without a type.

Projects

No projects

Relationships

None yet

Development

No branches or pull requests

Issue actions