Skip to content

"panels off" and "toggle panels" result in continuous log spam #2488

@plonk75

Description

@plonk75

KSP 1.6.1
kOS 1.1.6.3

When executing panels off or toggle panels on a vessel equiped with an OX-STAT or an OX-STAT-XL solar panel, heavy log spam starts until the flight is reverted, or left otherwise.
This doesn't happen if vessel has only retractable and/or deploy-once solar panels attached.
If moveable solar panels and non-movable panels are combined on a vessel, the spam starts as well.
How to reproduce:

  • Take a CX-4181 part,attach a probe core and an OX-STAT or OX-STAT-XL to it.
  • Launch
  • Mod-F12 to open KSP console
  • open terminal and try toggle panels.

expected result: nothing related
actual result: logspam starts

  • revert to launch
  • open terminal and try panels off.

expected result: nothing related
actual result: logspam starts

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions