Description

Please provide a detailed description of what was done in this PR

Changes

  • Bugfix (non-breaking change that solves an issue)
  • Hotfix (change that solves an urgent issue, and requires immediate attention)
  • New feature (non-breaking change that adds functionality)
  • Breaking change (change that is not backwards-compatible and/or changes current functionality)
  • Changes only for a subset of nodes

Breaking changes

Please complete this section if any breaking changes have been made, otherwise delete it

Nodes audience

In case this PR includes changes that must be applied only to a subset of nodes, please specify how you handled it (e.g. by adding a flag with a default value...)

Checklist

  • I have added at least 2 reviewer or the whole pos-v1 team
  • I have added sufficient documentation in code
  • I will be resolving comments - if any - by pushing each fix in a separate commit and linking the commit hash in the comment reply
  • Created a task in Jira and informed the team for implementation in Erigon client (if applicable)
  • Includes RPC methods changes, and the Notion documentation has been updated

Cross repository changes

  • This PR requires changes to heimdall
    • In case link the PR here:
  • This PR requires changes to matic-cli
    • In case link the PR here:

Testing

  • I have added unit tests
  • I have added tests to CI
  • I have tested this code manually on local environment
  • I have tested this code manually on remote devnet using express-cli
  • I have tested this code manually on amoy
  • I have created new e2e tests into express-cli

Manual tests

Please complete this section with the steps you performed if you ran manual tests for this functionality, otherwise delete it

Additional comments

Please post additional comments in this section if you have them, otherwise delete it

protolambda and others added 30 commits March 26, 2025 16:14
Simple bugfix to include the access-list in the gas-estimation step of
the ABI bindings code.
Add support for state overrides in eth_createAccessList. This will make the method consistent
with other execution methods.

---------

Co-authored-by: Sina Mahmoodi <itz.s1na@gmail.com>
eth/catalyst: force sync of txpool before clearing subpools in Rollback
fix nil pointer dereference on DoCall
…#31500)

This PR changes log indexer error handling so that if an indexing error
happens then it disables the indexer and reverts to unindexed more
without resetting the database (except in case of a failed database
init).
Resetting the database on the first error would probably be overkill as
a client update might fix this without having to reindex the entire
history. It would also make debugging very hard. On the other hand,
these errors do not resolve themselves automatically so constantly
retrying makes no sense either. With these changes a new attempt to
resume indexing is made every time the client is restarted.
The PR also fixes ethereum/go-ethereum#31491
which originated from the tail indexer trying to resume processing a
failed map renderer.

---------

Co-authored-by: Felix Lange <fjl@twurst.com>
Ignores all hand-built binaries (built with go build, everything built
with make is already ignored)
This PR adds `rawdb.SafeDeleteRange` and uses it for range deletion in
`core/filtermaps`. This includes deleting the old bloombits database,
resetting the log index database and removing index data for unindexed
tail epochs (which previously weren't properly implemented for the
fallback case).
`SafeDeleteRange` either calls `ethdb.DeleteRange` if the node uses the
new path based state scheme or uses an iterator based fallback method
that safely skips trie nodes in the range if the old hash based state
scheme is used. Note that `ethdb.DeleteRange` also has its own iterator
based fallback implementation in `ethdb/leveldb`. If a path based state
scheme is used and the backing db is pebble (as it is on the majority of
new nodes) then `rawdb.SafeDeleteRange` uses the fast native range
delete.
Also note that `rawdb.SafeDeleteRange` has different semantics from
`ethdb.DeleteRange`, it does not automatically return if the operation
takes a long time. Instead it receives a `stopCallback` that can
interrupt the process if necessary. This is because in the safe mode
potentially a lot of entries are iterated without being deleted (this is
definitely the case when deleting the old bloombits database which has a
single byte prefix) and therefore restarting the process every time a
fixed number of entries have been iterated would result in a quadratic
run time in the number of skipped entries.

When running in safe mode, unindexing an epoch takes about a second,
removing bloombits takes around 10s while resetting a full log index
might take a few minutes. If a range delete operation takes a
significant amount of time then log messages are printed. Also, any
range delete operation can be interrupted by shutdown (tail uinindexing
can also be interrupted by head indexing, similarly to how tail indexing
works). If the last unindexed epoch might have "dirty" index data left
then the indexed map range points to the first valid epoch and
`cleanedEpochsBefore` points to the previous, potentially dirty one. At
startup it is always assumed that the epoch before the first fully
indexed one might be dirty. New tail maps are never rendered and also no
further maps are unindexed before the previous unindexing is properly
cleaned up.

---------

Co-authored-by: Gary Rong <garyrong0905@gmail.com>
Co-authored-by: Felix Lange <fjl@twurst.com>
pratikspatil024 and others added 18 commits June 2, 2025 21:51
fix(consensus, span): avoid duplicate span commit for spanId 1
@pratikspatil024 pratikspatil024 changed the title [DRAFT] v2.1.0 v2.1.0 Jun 11, 2025
@pratikspatil024 pratikspatil024 requested a review from a team June 12, 2025 04:05
@pratikspatil024 pratikspatil024 merged commit 97c0728 into master Jun 12, 2025
7 of 12 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.