Videos
PRODUCT OVERVIEW: PURE Control – Alarm History
This video provides an overview of the PURE Control Alarm History feature and demonstrates how to view and navigate alarm history records for your boiler system. Learn how to access historical alarm data, review past events, and use alarm history information to support troubleshooting, diagnostics, and system maintenance.
Software Update: PURE Control – Version 5.3.0
This video highlights the new features introduced in software version 5.3.0 for the Endura XE 1000–3000, including new dual-fuel capabilities.
How To: Software Update on PURE Control
This video demonstrates how to perform a software update on Fulton’s PURE Control. It covers accessing the system interface, locating the update section, and initiating the update process.
How To: General Navigation of LMV Control with AZL Display
In this video, we walk through the step-by-step process of navigating the LMV control system using the AZL interface. Whether you're new to LMV systems or just need a quick refresher, this guide will help you understand the key functions and menu structure.
How To: Commission ENDURA XE (399k – 750k BTU/hr)
Overview of the commissioning steps for Fulton's ENDURA XE boilers. This video applies to ENDURA XE boilers with the PURE Control (boiler sizes 399k - 750k BTU/hr).