IS JAPAN HIDING NUKE WEAPONS PROGRAM AT UNIT 1 ????

4 06 2011

We ask WHY have no foreign governments been allowed to size up the disaster at Fukushima???

WHY has a plant (unit 1) leaking  4,000 Milli Sieverts PER HOUR been kept hidden from international observers, scientists and press??? 

WHY were 2 fires reported at a basement (control panel area) of Unit 1???

WHAT was the cause??

Was it arson to cover up readings of MORE DISASTER from illegal activities at Unit 1???

WHY is there SILENCE by the international (GE owned) press???

WHEN will TEPCO bow out and allow competent international scientists to stop the runaway radiation from Units 1, 2, 3 & 4 and possibly 5 & 6 ???

WHAT ELSE, BESIDES AN ILLEGAL NUKE WEAPONS PROGRAM, COULD ACCOUNT FOR THIS HORROR AT UNIT 1 OF FUKUSHIMA DAI-ICHI, JAPAN??? 





GE and Nuke Criminals Interfere at Fukushima

15 04 2011

This is CREEPY —

From Scoop:

Political Warfare

In reaction to Prime Minister Naoto Kan’s demand for prompt reporting of problems, the pro-nuclear lobby has closed ranks, fencing off and freezing out the prime minister’s office from vital information. A grand alliance of nuclear proponents now includes TEPCO, plant designer General Electric, METI, the former ruling Liberal Democratic Party and, by all signs, the White House.

Cabinet ministers in charge of communication and national emergencies recently lambasted METI head Banri Kaeda for acting as both nuclear promoter and regulator in charge of the now-muzzled Nuclear and Industrial Safety Commission. TEPCO struck back quickly, blaming the prime minister’s helicopter fly-over for delaying venting of volatile gases and thereby causing a blast at Reactor 2. For “health reasons,” TEPCO ‘s president retreated to a hospital ward, cutting Kan’s line of communication with the company and undermining his site visit to Fukushima 1.

Kan is furthered hampered by his feud with Democratic Party rival Ichiro Ozawa, the only potential ally with the clout to challenge the formidable pro-nuclear coalition

The head of the Liberal Democrats, which sponsored nuclear power under its nearly 54-year tenure, has just held confidential talks with U.S. Ambassador John Roos, while President Barack Obama was making statements in support of new nuclear plants across the U.S.

Cut Off From Communications

The substance of undisclosed talks between Tokyo and Washington can be surmised from disruptions to my recent phone calls to a Japanese journalist colleague. While inside the radioactive hot zone, his roaming number was disconnected, along with the mobiles of nuclear workers at Fukushima 1 who are denied phone access to the outside world. The service suspension is not due to design flaws. When helping to prepare the Tohoku crisis response plan in 1996, my effort was directed at ensuring that mobile base stations have back-up power with fast recharge.

A subsequent phone call when my colleague returned to Tokyo went dead when I mentioned “GE.” That incident occurred on the day that GE’s CEO Jeff Immelt landed in Tokyo with a pledge to rebuild the Fukushima 1 nuclear plant. Such apparent eavesdropping is only possible if national phone carrier NTT is cooperating with the signals-intercepts program of the U.S. National Security Agency (NSA). . . (more)

http://www.scoop.co.nz/stories/HL1104/S00107/us-japan-security-treaty-delayed-fight-against-meltdown.htm