A better energy future starts today

Optimal energy efficiency. In each and every project. We do.

Harnessing the potential of innovative technologies to unlock higher levels of efficiency, we are committed to delivering sustainable solutions.

Learn more

Our exceptional skills and expertise in complementary sectors of the energy ecosystem allow us to develop and implement custom solutions for our clients, providing them with the competitive edge they need to succeed.

Chisineu-Cris, Full EPC, 54 MWp project for NEPI Rockcastle.

The Chişineu-Criş Photovoltaic Power Plant (54.11 MWp) has been successfully completed including energization, after 8 months of construction. As EPC contractor, ENEVO Group delivered LSTK (Lump sum turnkey) project full engineering, procurement, and construction works for the solar plant, transforming design into real performance.

Developed for NEPI Rockcastle in collaboration with LONGi Solar Europe, is the first project that integrates LONGi’s Hi-MO9 modules with new back-contact technology, ensuring higher efficiency and long-term reliability. Spanning over 200,000 m² and equipped with advanced Sungrow inverter systems, the Chişineu-Criş PV Plant stands among the most innovative renewable energy projects in the region.

Full EPC, 70 MWp project for Eurowind Teius.

With an installed capacity of 68.99 MW the Teius park is equipped with tracking systems that follow the sun throughout the day, ensuring maximum energy efficiency. With an annual output of over 103 GWh, CEF Teius will generate enough clean energy to power more than 25,000 households.

ENEVO Group led the project’s EPC execution. The scope included design, procurement, installation, and commissioning of the PV plant, a 110/20kV substation, and an 80 MVA transformer station—built to the highest standards of quality and in full compliance with Romanian grid connection regulations.

132kV Substation for Khafji Joint Operations

Khafji Joint Operation is a joint venture between Kuwait Gulf Oil Company and Aramco Gulf Operations Company for onshore and offshore oil & gas production.

ENEVO Group, through its Saudi Arabia licensed subsidiary was awarded the EPC contract for the construction of a new HV substation for the supply of the KJO facilities.

DCS System for Stejaru Hydro Power Plant (210 MW)

The Stejaru Hydro Power Plant is a hydropower development on the Bistrița River, near Bicaz, Romania. The plant has been operational for over 50 years and has a total installed capacity of 210 MW.

The plant has six turbines (four-27.5 MW and two-50 MW turbines) and generates an average of 500 GWh. ENEVO Group was main automation contractor during the plant refurbishment project.

SentryOT – Cyber Situational Awareness for OT Energy Infrastructures

SentryOT collects all the information needed by an Incident Response team to investigate or perform threat hunting activities.

This includes full network visibility, device and application logs, up-to-date asset inventory and an accurate OT network topology. In a clear, visual, and easy-to-interpret way.

Implementing the SentryOT Cyber Resilience Platform on any OT Power & Automation system will lay a robust foundation for a secure and resilient infrastructure.