Skip to main content

CX2 Construction Inc.

Construction Projects

Fedex Express
The FedEx Express project included Tilt Wall, Driven Piles, Slab on Grade, Conveyor Platform, Concrete Paving, Loading Docks, Curbs and Sidewalks.
Oakmont
The Oakmont Project included tilt wall, slab on grade, concrete columns, and concrete paving.
Fat Quarter
The Fat Quarter project included tilt wall, slab on grade, slab on metal deck, concrete paving, and site retaining walls.
Del Valle High School CTE
The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.
Del Valle High School Site
The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.
Del Valle High School Gym
The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.
Del Valle High School Fine Arts
The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.
Del Valle High School Data Center
The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.
Del Valle High School Athletics
The Del Valle High School Project included Concrete Hollowcore Foundation Systems, (Concrete Piers with Exposed Concrete Pilasters, Concrete Beams and Concrete Topping Slabs Over Hollowcore Planks) Concrete Piers and Foundation For Athletics Building With In-Door Sports Field, Elevated Slabs on Metal Decks, Sidewalks, Concrete Paving, Decorative (With Recessed School Logo) Cast-In-Place Concrete Site Wall.
Chip Semi Conductor
The Chip Semi Conductor Project included tilt wall, slab on grade, slab on metal deck, concrete paving, pond structures and site retaining walls.
Colinas Crossing
The Colinas Crossing Project included Concrete Slabs on Grade, Board-Formed (Using Natural Wood) Concrete Tilt Panels, Curb and Gutter, Sidewalks, Detention Pond Concrete Walls, Cast-In-Place Board Formed (using Natural Wood) Concrete Planters.