Project Gallery
A hospital in Tennessee required a reliable steam system to support critical operations. Boiler Supply was engaged to provide both an immediate emergency steam solution and a long-term equipment replacement plan.
Replaced a Bryan boiler with (3) modular Camus units used for building heat and the steam from this boiler was used to heat shell and tube heat exchangers.
Replacement of Raypak boilers with ClearFire CFC-E Hydronic Condensing Boilers.
Replacement of Johnston Boilers with the Cleaver-Brooks CBEX 800 HP Firetube Boiler with Economizer and Deaerator.
New 600 hp CBEX Cleaver-Brooks firetube boiler
ClearFire-CE high-efficiency hydronic boilers
Careful project planning before the installation.
Deaerator and Firetube Boiler
CBEX Firetube. Get the full story on how we reduced fuel costs for a Medical Facility by 25% in its boiler plant ——>> https://boisco.com/cbex-reduces-fuel-usage-by-25-percent/
Deaerator Controls Upgrade
ClearFire CE High Efficiency Hydronic Boilers
CBEX Ricoh Replacement
Hurst Firetube With Cleaver-Brooks Firetube Replacement
ClearFire-CE
Cleaver-Brooks and Deaerator and (2) Firetube Boilers
Flexible Watertube
Clearfire-LC Large Capacity Hydronic Boilers
Clearfire-LC Large Capacity Hydronic Boilers
New firetube and feedwater system
Deaerator Rental for Steam
Hydronic Unit
Rental to Texas
Waterside maintenance