FeedIndex
Filter: duration  view all
The screenshot shows a digital project management interface organized under the section “My Tasks.” On the left panel, a vertical list of tasks is displayed, each marked with a thumbnail image, task title, and green status indicators. The tasks appear sequentially labeled with variations of “BWW_050_010,” “BWW_050_020,” etc., suggesting a structured naming convention related to a project pipeline, likely animation or visual production.

The main panel on the right presents detailed information for a selected task labeled “BWW_050_030.” At the top, a preview thumbnail image of storyboard artwork or rendered frame is visible. Metadata includes:

Description: “BWW_050_030”

Bid Duration: 5.0d

Bid Completion: 50%

Task Status: Active

Below, the “Tasks” tab is open, showing a table with pipeline step allocation. Columns display the step category (“Animation”), task owner, assigned artist, start and due dates, and completion progress. The selected task shows 2 individuals assigned, identified as A. Nikolov and T. Nikolov, with specific schedule dates and progress bars.

Navigation options include tabs for Activity, Shot Info, Versions, Notes, and other categories, indicating full production tracking capabilities.

This layout is typical of industry-standard production management software used in animation, film, or VFX pipelines, where tasks are segmented by shot or sequence, and tracked for scheduling, responsibility, and progress.
 
  Getting more posts...