Since its inception in 2004 ABL has successfully completed commissioning services for more than 200 major projects including the most iconic and prestigious development in the region
MEP Testing and Validation Services
covers the validation of
all mechanical, electrical and
plumbing services within the
building This includes setting to
work and regulation of
the systems to design
requirements. Drawings will be
studied for commissionability and Initial site
visits will be
carried out. Any snags found will
be recorded and
project team will be informed
for rectification works.
A detail project specific method statement with ITP
will be prepared
and test sheets
will be put in place.
A.B.L In-house commissioning and tracking program will be prepared in coordination with
construction program. The commissioning process incorporates static pre
commissioning, which is carried
out prior to setting
to work, upon
pre commissioning initial
tests will be
carried out to
ensure that all the systems
are performing as per
the design, the complete system will
be reviewed for
performance and suggestion/ recommendation made
to client.
A typical sequence of works as
follows:
§
Method statement with ITP
for Commissioning.
§
Production of
commissioning program.
§
Pre-Commissioning for all
the systems.
§
Commissioning for all the
systems.
§
Preparation of Detailed
Reports.
§
Demonstration to the
Accepting Authority.
§
Performance Testing of
all equipment’s
§
Preparation of Detailed
Reports.
§
•Demonstration to the
Accepting Authority.
All commissioning works are
carried out in
accordance with the CIBSE and
BSRIA Com missioning Codes
together with the ASHRAE, NEBB codes
of practice as applicable and all instrumentation is
regularly tested and calibrated
to national standards.
A.B.L has extensive experience
in Electrical testing
and commissioning, Our test
and commissioning engineers
have the specialist skills and qualifications to carry
out the re quired testing and
inspection requirements as detailed
in IEE 17th Edition &
BS: 7671 as applicable using up
to date calibrated test equipment's.
The tests
includes but not limited to
following:
§
MV Switchgear
§
MV Cables.
§
LV Switchgear.
§
LV Cables
§
Bus Bar
Riser System.
§
MCC Panels
§
ATS
§
Earthing System.
§
MDB/SMDB.
§
Distribution Boards
§
ATS
§
Earthing System.
§
Lightning Protection System
Copyright © 2026 A.B.L. All Rights Reserved. Designed By HUBSOL