Jubilant

This monumental nuclear pharmacy project had 2 unique specifications – it needed to be completed within 4 months and adhere to the strictest in regulations. At the heart of the pharmacy, we created a highly-regulated clean room with a generator to ensure that operations would continue despite any outages. With various meticulously designed zones throughout the building, each was equipped to enable the compounding and dispensing of sensitive radioactive materials for use in nuclear medicine procedures. We completed the property transformation in a remarkable 3.5 months. This swift execution showcases our expertise and adaptability in navigating the complex world of nuclear medicine construction.

Let’s build something solid

Whether you’ve got drawings in hand or a deal on the table
— we’re ready to roll up our sleeves, whenever you are.