Balance your Schedule — Breakout by Resource (or Status)

The latest in-app update to DayBack Calendar introduces “breakout” to Horizon View. This lets you work at longer time scales (up to nine twenty weeks at a time) while focussing on what’s scheduled for each resource.

Resources in DayBack can be your people, rooms, or pieces of equipment, and you balance your workload by dragging events from one resource to another.

Here’s a video of breakout in action:

[ba-youtubeflex videoid=”gz2AbgqygcQ”]

[ba-button link=”https://www.seedcode.com/filemaker-calendar/” color=”Yellow” target=”blank”]Learn more about DayBack Calendar[/ba-button]

[ba-button link=”https://www.seedcode.com/filemaker-calendar/#pricing” color=”Yellow” target=”blank”]DayBack Pricing[/ba-button]

 

New – Breakout by Status & Collapse

The December 20 update to DayBack lets you breakout by Status as well. We hope to allow you to breakout the horizon view by all kinds of things (including by calendar and by project) so stay tuned!

And the January 10 update lets you collapse breakout rows (dimming the rows via CSS is a simple mod you can make following the instructions toward the end of the page here):

Breakout is a Free Update

If you’re already using DayBack, breakout comes as a free in-app update: just click “Admin Settings” on the settings tab then “check for updates”. New in-app updates are installed in one click: there is no need to re-integrate DayBack into your file. Though with this update you will add a couple of new lines to one of the calendar’s scripts so that you can control if breakout is on or off by default.

If you purchased DayBack more than a year ago as an outright purchase (not a subscription) your in-app updates may have expired (they’re included in your purchase for one year). Fortunately, you can extend your in-app updates if they’ve expired.

Featured Posts

Follow Along

Stay up to date with the latest news & examples from SeedCode

3 Comments

  • Trevor Gildersleeve

    Hi guys, love the breakout feature and I have a project that could really take advantage of the ability to breakout by project. I’m just wondering if this feature is in the works and if so if you have a general estimate of when it will released? Thanks!

    • seedcode

      In the works, but I don’t have an ETA we can share. You can filter by projects in the meantime, but I know that breakout means you can see multiple projects at the same time more clearly. This is something I’m looking forward to as well, so it’s coming.

      • Trevor Gildersleeve

        Great! Thanks. 🙂

Leave a Reply

Your email address will not be published. Required fields are marked *

Check out some of our other posts ...

Add Jobs to a Mapped Route in FileMaker

See When Assets are Passing by Unscheduled Jobs Showing unscheduled items on the map lets you see when a route is passing close to jobs you need to schedule. As you click on each truck, you’ll see it’s route for the day and find unscheduled jobs that would be good

Read More »

Scheduling Teams and Equipment

Seeing Availability at a Glance We recently customized DayBack for a customer who wanted to consolidates all the decisions of team assignments into a single screen. When a dispatcher clicks on a job, they can schedule the entire field team (technicians, lead, vehicle, departure plan, and equipment) without leaving the

Read More »
Schedule Crews in FileMaker

Crew Assignment and Scheduling

We often see folks struggling to schedule both crew membership and crew assignment. This is particularly tough if crew membership can change with the different roles required on different jobs. The interface below helps a great deal. You can see the crew leads, with red icons, and the crew members

Read More »

FOLLOW ALONG

Stay up to date with the latest news & examples from SeedCode

© 2026 SeedCode, Inc.