Skip to content

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.8.5#75

Merged
msclock merged 1 commit intomasterfrom
renovate-github/astral-sh-ruff-pre-commit-0.x
Jan 3, 2025
Merged

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.8.5#75
msclock merged 1 commit intomasterfrom
renovate-github/astral-sh-ruff-pre-commit-0.x

Conversation

@serious-scaffold
Copy link
Copy Markdown
Contributor

@serious-scaffold serious-scaffold bot commented Dec 16, 2024

This PR contains the following updates:

Package Type Update Change
astral-sh/ruff-pre-commit repository patch v0.8.2 -> v0.8.5

Note: The pre-commit manager in Renovate is not supported by the pre-commit maintainers or community. Please do not report any problems there, instead create a Discussion in the Renovate repository if you have any questions.


Release Notes

astral-sh/ruff-pre-commit (astral-sh/ruff-pre-commit)

v0.8.5

Compare Source

See: https://github.com/astral-sh/ruff/releases/tag/0.8.5

v0.8.4

Compare Source

See: https://github.com/astral-sh/ruff/releases/tag/0.8.4

v0.8.3

Compare Source

See: https://github.com/astral-sh/ruff/releases/tag/0.8.3


Configuration

📅 Schedule: Branch creation - "* 0-3 * * 1" (UTC), Automerge - "* 0-3 1 * *" (UTC).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

@serious-scaffold serious-scaffold bot force-pushed the renovate-github/astral-sh-ruff-pre-commit-0.x branch 2 times, most recently from 925e2b9 to 3ad3130 Compare December 17, 2024 02:16
@serious-scaffold serious-scaffold bot changed the title chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.8.3 chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.8.4 Dec 20, 2024
@serious-scaffold serious-scaffold bot force-pushed the renovate-github/astral-sh-ruff-pre-commit-0.x branch 3 times, most recently from 0f22b8e to 6468e08 Compare December 24, 2024 02:56
@serious-scaffold serious-scaffold bot force-pushed the renovate-github/astral-sh-ruff-pre-commit-0.x branch 6 times, most recently from e96d00e to 2f1d79b Compare January 2, 2025 00:35
@serious-scaffold serious-scaffold bot force-pushed the renovate-github/astral-sh-ruff-pre-commit-0.x branch from 2f1d79b to 1336b29 Compare January 3, 2025 00:36
@serious-scaffold serious-scaffold bot changed the title chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.8.4 chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.8.5 Jan 3, 2025
@codecov
Copy link
Copy Markdown

codecov bot commented Jan 3, 2025

Codecov Report

All modified and coverable lines are covered by tests ✅

Project coverage is 100.00%. Comparing base (300102b) to head (1336b29).
Report is 5 commits behind head on master.

Additional details and impacted files
@@            Coverage Diff            @@
##            master       #75   +/-   ##
=========================================
  Coverage   100.00%   100.00%           
=========================================
  Files            1         1           
  Lines            3         3           
=========================================
  Hits             3         3           

☔ View full report in Codecov by Sentry.
📢 Have feedback on the report? Share it here.

@msclock msclock merged commit 2645728 into master Jan 3, 2025
@msclock msclock deleted the renovate-github/astral-sh-ruff-pre-commit-0.x branch January 3, 2025 01:49
@serious-scaffold
Copy link
Copy Markdown
Contributor Author

🎉 This PR is included in version 0.8.29 🎉

The release is available on GitHub release

Your semantic-release bot 📦🚀

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant