Skip to content

refactor(material/input): switch tests away from fakeAsync#32938

Merged
crisbeto merged 1 commit into
angular:mainfrom
crisbeto:input-fake-async
Mar 15, 2026
Merged

refactor(material/input): switch tests away from fakeAsync#32938
crisbeto merged 1 commit into
angular:mainfrom
crisbeto:input-fake-async

Conversation

@crisbeto

Copy link
Copy Markdown
Member

Reworks the input tests not to depend on fakeAsync anymore.

Reworks the input tests not to depend on `fakeAsync` anymore.
@crisbeto crisbeto added the target: patch This PR is targeted for the next patch release label Mar 15, 2026
@pullapprove pullapprove Bot requested review from ok7sai and wagnermaciel March 15, 2026 08:41
@crisbeto crisbeto added the action: merge The PR is ready for merge by the caretaker label Mar 15, 2026
@crisbeto crisbeto merged commit 2ad4274 into angular:main Mar 15, 2026
30 of 32 checks passed
@crisbeto

Copy link
Copy Markdown
Member Author

This PR was merged into the repository. The changes were merged into the following branches:

crisbeto added a commit that referenced this pull request Mar 15, 2026
Reworks the input tests not to depend on `fakeAsync` anymore.

(cherry picked from commit 2ad4274)
@angular-automatic-lock-bot

Copy link
Copy Markdown

This issue has been automatically locked due to inactivity.
Please file a new issue if you are encountering a similar or related problem.

Read more about our automatic conversation locking policy.

This action has been performed automatically by a bot.

@angular-automatic-lock-bot angular-automatic-lock-bot Bot locked and limited conversation to collaborators Apr 15, 2026
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Labels

action: merge The PR is ready for merge by the caretaker area: material/input target: patch This PR is targeted for the next patch release

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants