Implementation of the project for replacement of the supervisory control system based on a Schneider Electric M221 PLC, including:
- Preparation of technical documentation, delivery and installation of the control cabinet.
- Dismantling of existing equipment, installation of the new cabinet, cable laying and wiring.
- Technical support during testing and commissioning of the system.