The Longtail FPSO uses standardised modules and a spread-mooring system to process 250,000 barrels of condensate and 1,200 million cubic feet of gas daily.
ABB extends scope at Rio Grande LNG to deliver integrated automation and electrical systems for additional liquefaction trains, supporting lifecycle efficiency and plant reliability.
Exporting 16 million m3/day, this project meets 15% of Brazil’s gas demand, boosting energy security, Equinor’s equity production, and long-term cash flow.
The company will supply critical gas compression and power generation equipment for ST LNG’s 8.4 MTPA export terminal located in U.S. federal waters near Texas.
UMOE Advanced Composites begins large-scale manufacturing in Jiaxing to supply hydrogen storage modules for Hiringa Sundown JV and global clean gas logistics projects.
The Malaysian energy giant has confirmed its first hydrocarbon discovery at the Barokah-1 well, reinforcing exploration potential and long-term energy growth within Indonesia’s North Ketapang.
In collaboration with Ecopetrol, the company identified significant gas-bearing intervals at the Copoazu-1 well, strengthening regional energy security and expanding South American deepwater reserves.