- Installed a StormTrap underground detention system – first one in the region, under the parking lot to maximize parking area. 30,400 CF was volume of the system.
- Installed 850 LF of RCP various sizes
- Relocated existing water utilities to accommodate design.
- Installed1,000 LF of up to 12’ high block retaining walls.
- Installed over 1000 LF of 10’ tall chain-link fencing along with 650 LF of ornamental aluminum fence.