{"name":"MS Projects","description":"","url":"https:\/\/msprojects.com.sg","home":"https:\/\/msprojects.com.sg","gmt_offset":"0","timezone_string":"","page_for_posts":3685,"page_on_front":2010,"show_on_front":"page","namespaces":["oembed\/1.0","litespeed\/v1","litespeed\/v3","rankmath\/v1","rankmath\/v1\/setupWizard","wordfence\/v1","elementor-one\/v1","elementor\/v1","astra\/v1","rankmath\/v1\/ca","rankmath\/v1\/an","rankmath\/v1\/in","rankmath\/v1\/status","astra_addon\/v1","elementor\/v1\/documents","elementor-ai\/v1","elementor\/v1\/feedback","elementor-pro\/v1","pys-facebook\/v1","bsf-core\/v1","nps-survey\/v1","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1"],"authentication":[],"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/batch\/v1"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"default":"json","required":false},"maxwidth":{"default":600,"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/oembed\/1.0\/embed"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"description":"The oEmbed format to use.","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"The maximum width of the embed frame in pixels.","type":"integer","default":600,"required":false},"maxheight":{"description":"The maximum height of the embed frame in pixels.","type":"integer","required":false},"discover":{"description":"Whether to perform an oEmbed discovery request for unsanctioned providers.","type":"boolean","default":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/oembed\/1.0\/proxy"}]}},"\/litespeed\/v1":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"litespeed\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v1"}]}},"\/litespeed\/v1\/toggle_crawler_state":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v1\/toggle_crawler_state"}]}},"\/litespeed\/v1\/tool\/check_ip":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v1\/tool\/check_ip"}]}},"\/litespeed\/v1\/guest\/sync":{"namespace":"litespeed\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v1\/guest\/sync"}]}},"\/litespeed\/v3":{"namespace":"litespeed\/v3","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"litespeed\/v3","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v3"}]}},"\/litespeed\/v3\/ip_validate":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v3\/ip_validate"}]}},"\/litespeed\/v3\/wp_rest_echo":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v3\/wp_rest_echo"}]}},"\/litespeed\/v3\/ping":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v3\/ping"}]}},"\/litespeed\/v3\/cdn_status":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v3\/cdn_status"}]}},"\/litespeed\/v1\/notify_img":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v1\/notify_img"}]}},"\/litespeed\/v1\/notify_ccss":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v1\/notify_ccss"}]}},"\/litespeed\/v1\/notify_ucss":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v1\/notify_ucss"}]}},"\/litespeed\/v1\/notify_vpi":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v1\/notify_vpi"}]}},"\/litespeed\/v3\/err_domains":{"namespace":"litespeed\/v3","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v3\/err_domains"}]}},"\/litespeed\/v1\/check_img":{"namespace":"litespeed\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/litespeed\/v1\/check_img"}]}},"\/rankmath\/v1":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1"}]}},"\/rankmath\/v1\/saveModule":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"module":{"type":"string","description":"Module slug","required":true},"state":{"type":"string","description":"Module state either on or off","enum":["on","off"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/saveModule"}]}},"\/rankmath\/v1\/toolsAction":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"action":{"type":"string","description":"Action to perform","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/toolsAction"}]}},"\/rankmath\/v1\/updateMode":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"mode":{"type":"string","description":"Mode to set","enum":["easy","advanced","custom"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/updateMode"}]}},"\/rankmath\/v1\/dashboardWidget":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/dashboardWidget"}]}},"\/rankmath\/v1\/updateSeoScore":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"postScores":{"type":"object","description":"Post scores","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/updateSeoScore"}]}},"\/rankmath\/v1\/updateSettings":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/updateSettings"}]}},"\/rankmath\/v1\/searchPage":{"namespace":"rankmath\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/searchPage"}]}},"\/rankmath\/v1\/disconnectSite":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"token":{"type":"string","description":"Site token","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/disconnectSite"}]}},"\/rankmath\/v1\/getFeaturedImageId":{"namespace":"rankmath\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"postId":{"type":"integer","description":"Post ID","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/getFeaturedImageId"}]}},"\/rankmath\/v1\/updateRedirection":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"objectID":{"type":"integer","description":"Object unique id","required":true},"objectType":{"type":"string","default":"post","description":"Object Type i.e. post, term, user","required":true},"hasRedirect":{"type":"boolean","description":"Whether the object has a redirect or not","required":true},"redirectionID":{"type":"string","description":"Redirection ID","required":false},"redirectionUrl":{"type":"string","description":"Redirection URL","required":false},"redirectionType":{"type":"string","default":"301","description":"Redirection Type","enum":["301","302","307","410","451"],"required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/updateRedirection"}]}},"\/rankmath\/v1\/updateMeta":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"objectType":{"type":"string","description":"Object Type i.e. post, term, user","required":true},"objectID":{"type":"integer","description":"Object unique id","required":true},"meta":{"description":"Meta to add or update data.","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/updateMeta"}]}},"\/rankmath\/v1\/updateSchemas":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"objectType":{"type":"string","description":"Object Type i.e. post, term, user","required":true},"objectID":{"type":"integer","description":"Object unique id","required":true},"schemas":{"description":"schemas to add or update data.","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/updateSchemas"}]}},"\/rankmath\/v1\/updateMetaBulk":{"namespace":"rankmath\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"rows":{"description":"Selected posts to update the data for.","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/updateMetaBulk"}]}},"\/rankmath\/v1\/setupWizard":{"namespace":"rankmath\/v1\/setupWizard","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/setupWizard","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/setupWizard"}]}},"\/rankmath\/v1\/setupWizard\/getStepData":{"namespace":"rankmath\/v1\/setupWizard","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"step":{"type":"string","description":"Current Step","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/setupWizard\/getStepData"}]}},"\/rankmath\/v1\/setupWizard\/updateStepData":{"namespace":"rankmath\/v1\/setupWizard","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"step":{"type":"string","description":"Current Step","required":true},"value":{"type":"object","description":"Current Step Data","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/setupWizard\/updateStepData"}]}},"\/rankmath\/v1\/setupWizard\/updateTrackingOptin":{"namespace":"rankmath\/v1\/setupWizard","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"enable_tracking":{"type":"string","description":"Enable Tracking","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/setupWizard\/updateTrackingOptin"}]}},"\/wordfence\/v1":{"namespace":"wordfence\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wordfence\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wordfence\/v1"}]}},"\/wordfence\/v1\/authenticate":{"namespace":"wordfence\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wordfence\/v1\/authenticate"}]}},"\/wordfence\/v1\/authenticate-premium":{"namespace":"wordfence\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wordfence\/v1\/authenticate-premium"}]}},"\/wordfence\/v1\/config":{"namespace":"wordfence\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wordfence\/v1\/config"}]}},"\/wordfence\/v1\/disconnect":{"namespace":"wordfence\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wordfence\/v1\/disconnect"}]}},"\/wordfence\/v1\/premium-connect":{"namespace":"wordfence\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wordfence\/v1\/premium-connect"}]}},"\/wordfence\/v1\/scan\/issues":{"namespace":"wordfence\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wordfence\/v1\/scan\/issues"}]}},"\/wordfence\/v1\/scan":{"namespace":"wordfence\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":[]},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wordfence\/v1\/scan"}]}},"\/wordfence\/v1\/scan\/issue":{"namespace":"wordfence\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wordfence\/v1\/scan\/issue"}]}},"\/elementor-one\/v1":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-one\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-one\/v1"}]}},"\/elementor-one\/v1\/connect\/authorize":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"clearSession":{"type":"boolean","default":false,"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-one\/v1\/connect\/authorize"}]}},"\/elementor-one\/v1\/connect\/disconnect":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-one\/v1\/connect\/disconnect"}]}},"\/elementor-one\/v1\/connect\/switch-domain":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-one\/v1\/connect\/switch-domain"}]}},"\/elementor-one\/v1\/connect\/deactivate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-one\/v1\/connect\/deactivate"}]}},"\/elementor-one\/v1\/top-bar\/notifications":{"namespace":"elementor-one\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"app_name":{"type":"string","required":true},"app_version":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-one\/v1\/top-bar\/notifications"}]}},"\/elementor-one\/v1\/top-bar\/feedback":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"product":{"type":"string","required":true},"subject":{"type":"string","required":true},"title":{"type":"string","required":true},"description":{"type":"string","required":true},"countryCode":{"type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-one\/v1\/top-bar\/feedback"}]}},"\/elementor-one\/v1\/themes":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org theme directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The theme activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-one\/v1\/themes"}]}},"\/elementor-one\/v1\/themes\/(?P<slug>[\\w\\-]+)\/activate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org theme directory slug.","pattern":"[\\w\\-]+","required":true}}}]},"\/elementor-one\/v1\/plugins":{"namespace":"elementor-one\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-one\/v1\/plugins"}]}},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/activate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/deactivate":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/upgrade":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":["angie","manage","elementor","elementor-pro","site-mailer","image-optimization","pojo-accessibility","cookiez"],"required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["active"],"required":false}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/migration\/run":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":{"1":"manage","2":"elementor","3":"elementor-pro","4":"site-mailer","5":"image-optimization","6":"pojo-accessibility","7":"cookiez"},"required":true},"force":{"type":"boolean","default":true,"description":"Force migration even if the plugin is already connected.","required":false}}}]},"\/elementor-one\/v1\/plugins\/(?P<slug>[\\w\\-]+)\/migration\/rollback":{"namespace":"elementor-one\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","enum":{"1":"manage","2":"elementor","3":"elementor-pro","4":"site-mailer","5":"image-optimization","6":"pojo-accessibility","7":"cookiez"},"required":true}}}]},"\/elementor-one\/v1\/settings":{"namespace":"elementor-one\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-one\/v1\/settings"}]}},"\/elementor\/v1":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1"}]}},"\/elementor\/v1\/site-editor":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/site-editor"}]}},"\/elementor\/v1\/site-editor\/templates":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/site-editor\/templates"}]}},"\/elementor\/v1\/site-editor\/templates\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}}]},"\/elementor\/v1\/site-editor\/conditions-config":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/site-editor\/conditions-config"}]}},"\/elementor\/v1\/site-editor\/templates-conditions\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":false}}}]},"\/elementor\/v1\/site-editor\/templates-conditions-conflicts":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/site-editor\/templates-conditions-conflicts"}]}},"\/astra\/v1":{"namespace":"astra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"astra\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/astra\/v1"}]}},"\/astra\/v1\/admin\/settings":{"namespace":"astra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/astra\/v1\/admin\/settings"}]}},"\/astra\/v1\/get-learn-chapters":{"namespace":"astra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/astra\/v1\/get-learn-chapters"}]}},"\/astra\/v1\/update-learn-progress":{"namespace":"astra\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"chapterId":{"type":"string","required":true},"stepId":{"type":"string","required":true},"completed":{"type":"boolean","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/astra\/v1\/update-learn-progress"}]}},"\/rankmath\/v1\/ca":{"namespace":"rankmath\/v1\/ca","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/ca","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca"}]}},"\/rankmath\/v1\/ca\/researchKeyword":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyword":{"description":"The keyword to be researched.","type":"string","required":true},"country":{"description":"The country for which the keyword should be researched.","type":"string","required":true},"objectID":{"description":"The ID of the post initiating the keyword research request.","type":"integer","required":true},"force_update":{"description":"If true, forces a fresh research request.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca\/researchKeyword"}]}},"\/rankmath\/v1\/ca\/getCredits":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca\/getCredits"}]}},"\/rankmath\/v1\/ca\/createPost":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"content":{"description":"The content of the new post.","type":"string","required":true},"title":{"description":"The title of the new post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca\/createPost"}]}},"\/rankmath\/v1\/ca\/saveOutput":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"outputs":{"description":"An array of AI-generated and existing outputs to be saved.","type":"array","required":false},"endpoint":{"description":"The API endpoint for which the output was generated.","type":"string","required":false},"isChat":{"description":"Indicates if the request was for the Chat endpoint.","type":"boolean","required":false},"attributes":{"description":"The parameters used to generate the AI output.","type":"object","required":false},"credits":{"description":"Credit usage details returned by the API.","type":"object","required":false},"usage":{"description":"Per-tool usage data returned by the API.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca\/saveOutput"}]}},"\/rankmath\/v1\/ca\/deleteOutput":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"isChat":{"description":"Indicates if the request to delete the output was for the Chat endpoint.","type":"boolean","required":false},"index":{"description":"The output index to delete, applicable only to the Chat endpoint.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca\/deleteOutput"}]}},"\/rankmath\/v1\/ca\/updateRecentPrompt":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"prompt":{"description":"The selected prompt to be updated in the recent prompts.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca\/updateRecentPrompt"}]}},"\/rankmath\/v1\/ca\/updatePrompt":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"prompt":{"description":"The prompt data to be saved in the database.","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca\/updatePrompt"}]}},"\/rankmath\/v1\/ca\/savePrompts":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"prompts":{"description":"A list of prompts received from the API to be saved in the database.","type":"array","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca\/savePrompts"}]}},"\/rankmath\/v1\/ca\/pingContentAI":{"namespace":"rankmath\/v1\/ca","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"plan":{"description":"Content AI plan to update in the Database.","type":"string","required":true},"refreshDate":{"description":"Content AI reset date to update in the Database","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca\/pingContentAI"}]}},"\/rankmath\/v1\/ca\/generateAlt":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"attachmentIds":{"description":"List of attachment IDs for which to generate alt text.","type":"array","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca\/generateAlt"}]}},"\/rankmath\/v1\/ca\/updateCredits":{"namespace":"rankmath\/v1\/ca","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"credits":{"description":"Credit usage details returned by the API.","type":"integer","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/ca\/updateCredits"}]}},"\/rankmath\/v1\/an":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/an","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/an"}]}},"\/rankmath\/v1\/an\/dashboard":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/an\/dashboard"}]}},"\/rankmath\/v1\/an\/keywordsOverview":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/an\/keywordsOverview"}]}},"\/rankmath\/v1\/an\/postsSummary":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/an\/postsSummary"}]}},"\/rankmath\/v1\/an\/postsRowsByObjects":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/an\/postsRowsByObjects"}]}},"\/rankmath\/v1\/an\/post\/(?P<id>\\d+)":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Post ID.","type":"integer","required":true}}}]},"\/rankmath\/v1\/an\/keywordsSummary":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/an\/keywordsSummary"}]}},"\/rankmath\/v1\/an\/analyticsSummary":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"postType":{"description":"Post Type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/an\/analyticsSummary"}]}},"\/rankmath\/v1\/an\/keywordsRows":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","required":false},"perPage":{"description":"Results per page.","type":"integer","required":false},"orderBy":{"description":"Order by.","type":"string","required":false},"order":{"description":"Order.","type":"string","required":false},"search":{"description":"Search.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/an\/keywordsRows"}]}},"\/rankmath\/v1\/an\/userPreferences":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"preferences":{"description":"User preferences.","type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/an\/userPreferences"}]}},"\/rankmath\/v1\/an\/inspectionResults":{"namespace":"rankmath\/v1\/an","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","required":false},"perPage":{"description":"Results per page.","type":"integer","required":false},"orderBy":{"description":"Order by.","type":"string","required":false},"order":{"description":"Order.","type":"string","required":false},"search":{"description":"Search.","type":"string","required":false},"filter":{"description":"Filter.","type":"string","required":false},"filterType":{"description":"Filter type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/an\/inspectionResults"}]}},"\/rankmath\/v1\/an\/removeFrontendStats":{"namespace":"rankmath\/v1\/an","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"toggleBar":{"description":"Toggle bar.","type":"boolean","required":false},"hide":{"description":"Hide.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/an\/removeFrontendStats"}]}},"\/rankmath\/v1\/in":{"namespace":"rankmath\/v1\/in","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/in","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/in"}]}},"\/rankmath\/v1\/in\/submitUrls":{"namespace":"rankmath\/v1\/in","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"urls":{"description":"The list of urls to submit to the Instant Indexing API.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/in\/submitUrls"}]}},"\/rankmath\/v1\/in\/getLog":{"namespace":"rankmath\/v1\/in","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"filter":{"description":"Filter log by type.","type":"string","enum":["all","manual","auto"],"default":"all","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/in\/getLog"}]}},"\/rankmath\/v1\/in\/clearLog":{"namespace":"rankmath\/v1\/in","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"filter":{"description":"Clear log by type.","type":"string","enum":["all","manual","auto"],"default":"all","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/in\/clearLog"}]}},"\/rankmath\/v1\/in\/resetKey":{"namespace":"rankmath\/v1\/in","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/in\/resetKey"}]}},"\/rankmath\/v1\/links\/posts":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","default":1,"required":false},"per_page":{"description":"Items per page.","type":"integer","default":50,"maximum":100,"required":false},"search":{"description":"Search in post title.","type":"string","default":"","required":false},"post_type":{"description":"Filter by post type. Supports multiple values.","type":"array","items":{"type":"string"},"default":[],"required":false},"is_orphan":{"description":"Filter by orphan status (orphan, linked).","type":"string","default":"","required":false},"seo_score_range":{"description":"Filter by SEO score range (great, good, bad, no-score).","type":"string","default":"","required":false},"orderby":{"description":"Order by field.","type":"string","default":"post_title","required":false},"order":{"description":"Order direction (ASC, DESC).","type":"string","default":"ASC","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/links\/posts"}]}},"\/rankmath\/v1\/links\/posts-stats":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/links\/posts-stats"}]}},"\/rankmath\/v1\/links\/links":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"page":{"description":"Page number.","type":"integer","default":1,"required":false},"per_page":{"description":"Items per page.","type":"integer","default":50,"maximum":100,"required":false},"search":{"description":"Search in URL.","type":"string","default":"","required":false},"source_id":{"description":"Filter by source post ID.","type":"integer","default":0,"required":false},"target_post_id":{"description":"Filter by target post ID.","type":"integer","default":0,"required":false},"is_internal":{"description":"Filter by link type (1 = internal, 0 = external).","type":"string","default":"","required":false},"orderby":{"description":"Order by field.","type":"string","default":"id","required":false},"order":{"description":"Order direction (ASC, DESC).","type":"string","default":"DESC","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/links\/links"}]}},"\/rankmath\/v1\/links\/links-stats":{"namespace":"rankmath\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/links\/links-stats"}]}},"\/rankmath\/v1\/status":{"namespace":"rankmath\/v1\/status","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"rankmath\/v1\/status","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/status"}]}},"\/rankmath\/v1\/status\/getViewData":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/status\/getViewData"}]}},"\/rankmath\/v1\/status\/updateViewData":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/status\/updateViewData"}]}},"\/rankmath\/v1\/status\/importSettings":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/status\/importSettings"}]}},"\/rankmath\/v1\/status\/exportSettings":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/status\/exportSettings"}]}},"\/rankmath\/v1\/status\/runBackup":{"namespace":"rankmath\/v1\/status","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/rankmath\/v1\/status\/runBackup"}]}},"\/astra_addon\/v1":{"namespace":"astra_addon\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"astra_addon\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/astra_addon\/v1"}]}},"\/astra_addon\/v1\/mega_menu\/(?P<id>\\d+)":{"namespace":"astra_addon\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}]},"\/astra_addon\/v1\/mega_menu":{"namespace":"astra_addon\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/astra_addon\/v1\/mega_menu"}]}},"\/elementor\/v1\/documents":{"namespace":"elementor\/v1\/documents","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1\/documents","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/documents"}]}},"\/elementor\/v1\/documents\/(?P<id>\\d+)\/media\/import":{"namespace":"elementor\/v1\/documents","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"required":true}}}]},"\/elementor\/v1\/cache":{"namespace":"elementor\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/cache"}]}},"\/elementor\/v1\/globals":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/globals"}]}},"\/elementor\/v1\/globals\/colors":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/globals\/colors"}]}},"\/elementor\/v1\/globals\/colors\/(?P<id>[\\w-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/globals\/typography":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/globals\/typography"}]}},"\/elementor\/v1\/globals\/typography\/(?P<id>[\\w-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/settings\/(?P<key>[\\w_-]+)":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}]},"\/elementor\/v1\/post":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"included_types":{"description":"Included post types","type":"array","default":null,"required":false},"excluded_types":{"description":"Post type to exclude","type":"array","default":["e-floating-buttons","e-landing-page","elementor_library","attachment","revision","nav_menu_item","custom_css","customize_changeset"],"required":false},"term":{"description":"Posts to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":"array","default":{"ID":"id","post_title":"label","post_type":"groupLabel"},"required":false},"items_count":{"description":"Posts per page","type":"integer","default":100,"required":false},"is_public":{"description":"Whether to include only public post types","type":"boolean","default":true,"required":false},"meta_query":{"description":"WP_Query meta_query array","type":"array","default":null,"required":false},"tax_query":{"description":"WP_Query tax_query array","type":"array","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/post"}]}},"\/elementor\/v1\/term":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"included_types":{"description":"Included taxonomy containing terms (categories, tags, etc...)","type":"array","default":null,"required":false},"excluded_types":{"description":"Excluded taxonomy containing terms (categories, tags, etc...)","type":"array","default":null,"required":false},"term":{"description":"Terms to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":"array","default":{"term_id":"id","name":"label","taxonomy":"groupLabel"},"required":false},"items_count":{"description":"Terms per request","type":"integer","default":100,"required":false},"hide_empty":{"description":"Whether to include only public terms","type":"boolean","default":false,"required":false},"meta_query":{"description":"WP_Query meta_query array","type":"array","default":null,"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/term"}]}},"\/elementor\/v1\/user":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"term":{"description":"Users to search","type":"string","default":"","required":false},"keys_conversion_map":{"description":"Specify keys to extract and convert, i.e. [\"key_1\" => \"new_key_1\"].","type":["array","string"],"default":{"ID":"id","display_name":"label","role":"groupLabel"},"required":false},"items_count":{"description":"Number of users to return","type":"integer","default":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/user"}]}},"\/elementor-ai\/v1":{"namespace":"elementor-ai\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-ai\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-ai\/v1"}]}},"\/elementor-ai\/v1\/permissions":{"namespace":"elementor-ai\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-ai\/v1\/permissions"}]}},"\/elementor\/v1\/favorites":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/favorites"}]}},"\/elementor\/v1\/favorites\/(?P<id>[\\w]+)":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Type of favorites.","type":"string","required":true},"favorite":{"description":"The favorite slug to create.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Type of favorites.","type":"string","required":true},"favorite":{"description":"The favorite slug to delete.","type":"string","required":true}}}]},"\/elementor\/v1\/kit-elements-defaults":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/kit-elements-defaults"}]}},"\/elementor\/v1\/kit-elements-defaults\/(?P<type>[\\w\\-\\_]+)":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"type":{"type":"string","description":"The type of the element.","required":true},"settings":{"description":"All the default values for the requested type","type":"object","required":true}}},{"methods":["DELETE"],"args":{"type":{"type":"string","description":"The type of the element.","required":true}}}]},"\/elementor\/v1\/site-navigation\/recent-posts":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"posts_per_page":{"description":"Number of posts to return","type":"integer","required":true},"post_type":{"description":"Post types to retrieve","type":"array","default":["page","post","elementor_library"],"required":false},"post__not_in":{"description":"Post id`s to exclude","type":"array","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/site-navigation\/recent-posts"}]}},"\/elementor\/v1\/site-navigation\/add-new-post":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_type":{"description":"Post type to create","type":"string","default":"post","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/site-navigation\/add-new-post"}]}},"\/elementor\/v1\/design-system-sync\/stylesheet":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/design-system-sync\/stylesheet"}]}},"\/elementor\/v1\/checklist":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/checklist"}]}},"\/elementor\/v1\/checklist\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/checklist\/steps":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/checklist\/steps"}]}},"\/elementor\/v1\/checklist\/steps\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/checklist\/steps\/(?P<id>[\\w\\-\\_]+)":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"type":"string","description":"The step id.","required":true}}}]},"\/elementor\/v1\/checklist\/user-progress":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/checklist\/user-progress"}]}},"\/elementor\/v1\/operations\/opt-in-v4":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/operations\/opt-in-v4"}]}},"\/elementor\/v1\/feedback":{"namespace":"elementor\/v1\/feedback","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor\/v1\/feedback","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/feedback"}]}},"\/elementor\/v1\/feedback\/submit":{"namespace":"elementor\/v1\/feedback","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/feedback\/submit"}]}},"\/elementor\/v1\/angie\/consent":{"namespace":"elementor\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/angie\/consent"}]}},"\/elementor\/v1\/template-library\/templates":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":{"title":{"type":"string","description":"The title of the document","required":false},"type":{"description":"The document type.","type":"string","enum":["page","section","container","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item"],"required":true},"content":{"description":"Elementor data object","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/template-library\/templates"}]}},"\/elementor\/v1\/user-data\/current-user":{"namespace":"elementor\/v1","methods":["GET","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["PATCH"],"args":{"suppressedMessages":{"type":"array","description":"Array of suppressed message keys","items":{"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/user-data\/current-user"}]}},"\/elementor\/v1\/onboarding":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/onboarding"}]}},"\/elementor\/v1\/onboarding\/user-progress":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/onboarding\/user-progress"}]}},"\/elementor\/v1\/onboarding\/user-choices":{"namespace":"elementor\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/onboarding\/user-choices"}]}},"\/elementor\/v1\/onboarding\/pro-install-screen":{"namespace":"elementor\/v1","methods":["GET","GET"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/onboarding\/pro-install-screen"}]}},"\/elementor\/v1\/onboarding\/install-pro":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/onboarding\/install-pro"}]}},"\/elementor\/v1\/onboarding\/install-theme":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/onboarding\/install-theme"}]}},"\/elementor\/v1\/global-widget\/templates":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/global-widget\/templates"}]}},"\/elementor-pro\/v1":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"elementor-pro\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-pro\/v1"}]}},"\/elementor-pro\/v1\/posts-widget":{"namespace":"elementor-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-pro\/v1\/posts-widget"}]}},"\/elementor\/v1\/form-submissions":{"namespace":"elementor\/v1","methods":["GET","DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"order_by":{"description":"Sort collection by object attribute.","type":"string","default":"created_at","enum":["created_at","id","main_meta_id"],"required":false},"status":{"description":"Limit result set to submissions assigned one or more statuses.","type":"string","default":"all","enum":["all","unread","read","trash"],"additionalProperties":{"context":"filter"},"required":false},"form":{"description":"Limit result set to submissions assigned to specific forms. The form id should follow this pattern {post_id}_{element_id} e.g: 10_476d0ce","type":"string","additionalProperties":{"context":"filter"},"required":false},"referer":{"description":"Limit result set to submissions assigned to specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false},"after":{"description":"Limit response to submissions sent after a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"before":{"description":"Limit response to submissions sent before a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false}}},{"methods":["DELETE"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true},"force":{"description":"Delete the object permanently.","type":"boolean","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true},"is_read":{"description":"mark whether the submission was read or not","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/form-submissions"}]}},"\/elementor\/v1\/form-submissions\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["GET","DELETE","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true},"force":{"description":"Delete the object permanently.","type":"boolean","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true},"is_read":{"description":"mark whether the submission was read or not","type":"boolean","required":false},"values":{"description":"Form field values, receive an array, the key should be the form field id and the value should be the value.","type":"object","required":false}}}]},"\/elementor\/v1\/form-submissions\/restore\/(?P<id>[\\d]+)":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"string","required":true}}}]},"\/elementor\/v1\/form-submissions\/restore":{"namespace":"elementor\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/form-submissions\/restore"}]}},"\/elementor\/v1\/form-submissions\/export":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":10000,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"order_by":{"description":"Sort collection by object attribute.","type":"string","default":"created_at","enum":["created_at","id","main_meta_id"],"required":false},"status":{"description":"Limit result set to submissions assigned one or more statuses.","type":"string","default":"all","enum":["all","unread","read","trash"],"additionalProperties":{"context":"filter"},"required":false},"form":{"description":"Limit result set to submissions assigned to specific forms. The form id should follow this pattern {post_id}_{element_id} e.g: 10_476d0ce","type":"string","additionalProperties":{"context":"filter"},"required":false},"referer":{"description":"Limit result set to submissions assigned to specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false},"after":{"description":"Limit response to submissions sent after a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"before":{"description":"Limit response to submissions sent before a given ISO8601 compliant date.","type":"string","format":"date","additionalProperties":{"context":"filter"},"required":false},"ids":{"description":"Unique identifiers for the objects.","type":"array","items":{"type":"integer"},"additionalProperties":{"context":"filter"},"required":false},"format":{"description":"The format of the export (for now only csv).","enum":["csv"],"default":"csv","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/form-submissions\/export"}]}},"\/elementor\/v1\/form-submissions\/referer":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made, determines fields present in response. (only \"options\" available for now)","type":"string","enum":["options"],"default":"options","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","additionalProperties":{"context":"filter"},"required":false},"value":{"description":"Limit results specific referer.","type":"string","additionalProperties":{"context":"filter"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/form-submissions\/referer"}]}},"\/elementor\/v1\/forms":{"namespace":"elementor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made, determines fields present in response. (only \"options\" available for now)","type":"string","enum":["options"],"default":"options","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/forms"}]}},"\/elementor-pro\/v1\/get-post-type-taxonomies":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_type":{"description":"The post type for which to fetch the list of taxonomies.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-pro\/v1\/get-post-type-taxonomies"}]}},"\/elementor-pro\/v1\/refresh-loop":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"The post ID of the page containing the loop.","type":"integer","required":true},"widget_id":{"description":"The ID of the loop widget.","type":"string","required":true},"widget_filters":{"description":"The filters for the loop widget.","type":"object","required":true},"widget_model":{"description":"The model of the loop widget. In Editor mode only.","type":"object","required":false},"pagination_base_url":{"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-pro\/v1\/refresh-loop"}]}},"\/elementor-pro\/v1\/refresh-search":{"namespace":"elementor-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"post_id":{"description":"The post ID of the page containing the loop.","type":"integer","required":true},"widget_id":{"description":"The ID of the loop widget.","type":"string","required":true},"widget_model":{"description":"The model of the loop widget. In Editor mode only.","type":"object","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor-pro\/v1\/refresh-search"}]}},"\/pys-facebook\/v1":{"namespace":"pys-facebook\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"pys-facebook\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/pys-facebook\/v1"}]}},"\/pys-facebook\/v1\/event":{"namespace":"pys-facebook\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"event":{"type":"string","required":true},"data":{"type":"string","default":"{}","required":false},"ids":{"type":"string","default":"[]","required":false},"eventID":{"type":"string","default":"","required":false},"woo_order":{"type":"string","default":"0","required":false},"edd_order":{"type":"string","default":"0","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/pys-facebook\/v1\/event"}]}},"\/bsf-core\/v1":{"namespace":"bsf-core\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"bsf-core\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/bsf-core\/v1"}]}},"\/bsf-core\/v1\/license\/activate":{"namespace":"bsf-core\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"product-id":{"type":"string","required":true},"license-key":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/bsf-core\/v1\/license\/activate"}]}},"\/nps-survey\/v1":{"namespace":"nps-survey\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"nps-survey\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/nps-survey\/v1"}]}},"\/nps-survey\/v1\/rating":{"namespace":"nps-survey\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"nps_id":{"type":"string","required":true},"rating":{"type":"integer","required":true},"comment":{"type":"string","default":"","required":false},"plugin_slug":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/nps-survey\/v1\/rating"}]}},"\/nps-survey\/v1\/dismiss-nps-survey":{"namespace":"nps-survey\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"nps_id":{"type":"string","required":true},"plugin_slug":{"type":"string","required":true},"dismiss_timespan":{"type":"integer","required":true},"current_step":{"type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/nps-survey\/v1\/dismiss-nps-survey"}]}},"\/elementor\/v1\/library\/connect":{"namespace":"elementor\/v1","methods":["POST","DELETE"],"endpoints":[{"methods":["POST"],"args":{"token":{"type":"string","description":"Connect CLI token","required":true}}},{"methods":["DELETE"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/library\/connect"}]}},"\/elementor\/v1\/send-event":{"namespace":"elementor\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false}}},{"methods":["POST"],"args":{"event_data":{"description":"All the recorded event data in JSON format","type":"object","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/elementor\/v1\/send-event"}]}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limit result set to items that are sticky.","type":"boolean","required":false},"ignore_sticky":{"description":"Whether to ignore sticky posts or not.","type":"boolean","default":true,"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"media_type":{"default":null,"description":"Limit result set to attachments of a particular media type.","type":"string","enum":["image","video","text","application","audio"],"required":false},"mime_type":{"default":null,"description":"Limit result set to attachments of a particular MIME type.","type":"string","required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL to the edited image file.","type":"string","format":"uri","required":true},"modifiers":{"description":"Array of image edits.","type":"array","minItems":1,"items":{"description":"Image edit.","type":"object","required":["type","args"],"oneOf":[{"title":"Rotation","properties":{"type":{"description":"Rotation type.","type":"string","enum":["rotate"]},"args":{"description":"Rotation arguments.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle to rotate clockwise in degrees.","type":"number"}}}}},{"title":"Crop","properties":{"type":{"description":"Crop type.","type":"string","enum":["crop"]},"args":{"description":"Crop arguments.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Horizontal position from the left to begin the crop as a percentage of the image width.","type":"number"},"top":{"description":"Vertical position from the top to begin the crop as a percentage of the image height.","type":"number"},"width":{"description":"Width of the crop as a percentage of the image width.","type":"number"},"height":{"description":"Height of the crop as a percentage of the image height.","type":"number"}}}}}]},"required":false},"rotation":{"description":"The amount to rotate the image clockwise in degrees. DEPRECATED: Use `modifiers` instead.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"As a percentage of the image, the x position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"As a percentage of the image, the y position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"As a percentage of the image, the width to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"As a percentage of the image, the height to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limit result set to items with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limit result set to items except those with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"parent":{"default":0,"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"default":1,"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"default":0,"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false}},"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false}},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false}},"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limit result set to items with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the global styles revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the global styles revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"The id of a template","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"Global styles.","type":["object"],"required":false},"settings":{"description":"Global settings.","type":["object"],"required":false},"title":{"description":"Title of the global styles variation.","type":["object","string"],"properties":{"raw":{"description":"Title for the global styles variation, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"font-face declaration in theme.json format, encoded as a string.","type":"string","required":true}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/e-floating-buttons":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/e-floating-buttons"}]}},"\/wp\/v2\/e-floating-buttons\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"footnotes":{"type":"string","title":"","description":"","default":""},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/e-floating-buttons\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/elementor_library":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/elementor_library"}]}},"\/wp\/v2\/elementor_library\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/elementor_library\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/elementor_library\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/rm_content_editor":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/rm_content_editor"}]}},"\/wp\/v2\/rm_content_editor\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/rm_content_editor\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/rm_content_editor\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/astra-advanced-hook":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","any"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-advanced-hook-layout":{"type":"string","title":"","description":"","default":""},"ast-advanced-hook-header":{"type":"object","title":"","description":"","default":{"sticky-header-on-devices":"desktop"},"properties":{"sticky":{"type":"string"},"shrink":{"type":"string"},"sticky-header-on-devices":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-footer":{"type":"object","title":"","description":"","default":{"sticky-footer-on-devices":"desktop"},"properties":{"sticky":{"type":"string"},"sticky-footer-on-devices":{"type":"string"}},"additionalProperties":false},"ast-404-page":{"type":"object","title":"","description":"","default":[],"properties":{"disable_header":{"type":"string"},"disable_footer":{"type":"string"}},"additionalProperties":false},"ast-advanced-time-duration":{"type":"object","title":"","description":"","default":[],"properties":{"enabled":{"type":"string"},"start-dt":{"type":"string"},"end-dt":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-content":{"type":"object","title":"","description":"","default":{"location":"after_blocks"},"properties":{"location":{"type":"string"},"after_block_number":{"type":"string"},"before_heading_number":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-action":{"type":"string","title":"","description":"","default":""},"ast-advanced-hook-priority":{"type":"string","title":"","description":"","default":""},"ast-custom-hook":{"type":"string","title":"","description":"","default":""},"ast-advanced-hook-padding":{"type":"object","title":"","description":"","default":[],"properties":{"top":{"type":"string"},"bottom":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-location":{"type":"object","title":"","description":"","default":{"rule":[],"specific":[],"specificText":[]},"properties":{"rule":{"type":"array"},"specific":{"type":"array"},"specificText":{"type":"array"}},"additionalProperties":false},"ast-advanced-hook-exclusion":{"type":"object","title":"","description":"","default":{"rule":[],"specific":[],"specificText":[]},"properties":{"rule":{"type":"array"},"specific":{"type":"array"},"specificText":{"type":"array"}},"additionalProperties":false},"ast-advanced-hook-users":{"type":"array","title":"","description":"","default":[],"items":{"type":"string"}},"ast-advanced-display-device":{"type":"array","title":"","description":"","default":["desktop","mobile","tablet"],"items":{"type":"string"}},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/astra-advanced-hook"}]}},"\/wp\/v2\/astra-advanced-hook\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-advanced-hook-layout":{"type":"string","title":"","description":"","default":""},"ast-advanced-hook-header":{"type":"object","title":"","description":"","default":{"sticky-header-on-devices":"desktop"},"properties":{"sticky":{"type":"string"},"shrink":{"type":"string"},"sticky-header-on-devices":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-footer":{"type":"object","title":"","description":"","default":{"sticky-footer-on-devices":"desktop"},"properties":{"sticky":{"type":"string"},"sticky-footer-on-devices":{"type":"string"}},"additionalProperties":false},"ast-404-page":{"type":"object","title":"","description":"","default":[],"properties":{"disable_header":{"type":"string"},"disable_footer":{"type":"string"}},"additionalProperties":false},"ast-advanced-time-duration":{"type":"object","title":"","description":"","default":[],"properties":{"enabled":{"type":"string"},"start-dt":{"type":"string"},"end-dt":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-content":{"type":"object","title":"","description":"","default":{"location":"after_blocks"},"properties":{"location":{"type":"string"},"after_block_number":{"type":"string"},"before_heading_number":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-action":{"type":"string","title":"","description":"","default":""},"ast-advanced-hook-priority":{"type":"string","title":"","description":"","default":""},"ast-custom-hook":{"type":"string","title":"","description":"","default":""},"ast-advanced-hook-padding":{"type":"object","title":"","description":"","default":[],"properties":{"top":{"type":"string"},"bottom":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-location":{"type":"object","title":"","description":"","default":{"rule":[],"specific":[],"specificText":[]},"properties":{"rule":{"type":"array"},"specific":{"type":"array"},"specificText":{"type":"array"}},"additionalProperties":false},"ast-advanced-hook-exclusion":{"type":"object","title":"","description":"","default":{"rule":[],"specific":[],"specificText":[]},"properties":{"rule":{"type":"array"},"specific":{"type":"array"},"specificText":{"type":"array"}},"additionalProperties":false},"ast-advanced-hook-users":{"type":"array","title":"","description":"","default":[],"items":{"type":"string"}},"ast-advanced-display-device":{"type":"array","title":"","description":"","default":["desktop","mobile","tablet"],"items":{"type":"string"}},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false}}}]},"\/wp\/v2\/astra-advanced-hook\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false}}}]},"\/wp\/v2\/astra-advanced-hook\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false}}}]},"\/wp\/v2\/astra-advanced-hook\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"site-sidebar-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-layout":{"type":"string","title":"","description":"","default":""},"ast-site-content-layout":{"type":"string","title":"","description":"","default":"default"},"site-content-style":{"type":"string","title":"","description":"","default":"default"},"site-sidebar-style":{"type":"string","title":"","description":"","default":"default"},"ast-global-header-display":{"type":"string","title":"","description":"","default":""},"ast-banner-title-visibility":{"type":"string","title":"","description":"","default":""},"ast-main-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-above-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-below-header-display":{"type":"string","title":"","description":"","default":""},"ast-hfb-mobile-header-display":{"type":"string","title":"","description":"","default":""},"site-post-title":{"type":"string","title":"","description":"","default":""},"ast-breadcrumbs-content":{"type":"string","title":"","description":"","default":""},"ast-featured-img":{"type":"string","title":"","description":"","default":""},"footer-sml-layout":{"type":"string","title":"","description":"","default":""},"ast-disable-related-posts":{"type":"string","title":"","description":"","default":""},"theme-transparent-header-meta":{"type":"string","title":"","description":"","default":""},"adv-header-id-meta":{"type":"string","title":"","description":"","default":""},"stick-header-meta":{"type":"string","title":"","description":"","default":""},"header-above-stick-meta":{"type":"string","title":"","description":"","default":""},"header-main-stick-meta":{"type":"string","title":"","description":"","default":""},"header-below-stick-meta":{"type":"string","title":"","description":"","default":""},"astra-migrate-meta-layouts":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-enabled":{"type":"string","title":"","description":"","default":"default"},"ast-page-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-content-background-meta":{"type":"object","title":"","description":"","default":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"properties":{"desktop":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"tablet":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false},"mobile":{"type":"object","properties":{"background-color":{"type":"string"},"background-image":{"type":"string"},"background-repeat":{"type":"string"},"background-position":{"type":"string"},"background-size":{"type":"string"},"background-attachment":{"type":"string"},"background-type":{"type":"string"},"background-media":{"type":"string"},"overlay-type":{"type":"string"},"overlay-color":{"type":"string"},"overlay-opacity":{"type":"string"},"overlay-gradient":{"type":"string"}},"additionalProperties":false}},"additionalProperties":false},"ast-advanced-hook-layout":{"type":"string","title":"","description":"","default":""},"ast-advanced-hook-header":{"type":"object","title":"","description":"","default":{"sticky-header-on-devices":"desktop"},"properties":{"sticky":{"type":"string"},"shrink":{"type":"string"},"sticky-header-on-devices":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-footer":{"type":"object","title":"","description":"","default":{"sticky-footer-on-devices":"desktop"},"properties":{"sticky":{"type":"string"},"sticky-footer-on-devices":{"type":"string"}},"additionalProperties":false},"ast-404-page":{"type":"object","title":"","description":"","default":[],"properties":{"disable_header":{"type":"string"},"disable_footer":{"type":"string"}},"additionalProperties":false},"ast-advanced-time-duration":{"type":"object","title":"","description":"","default":[],"properties":{"enabled":{"type":"string"},"start-dt":{"type":"string"},"end-dt":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-content":{"type":"object","title":"","description":"","default":{"location":"after_blocks"},"properties":{"location":{"type":"string"},"after_block_number":{"type":"string"},"before_heading_number":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-action":{"type":"string","title":"","description":"","default":""},"ast-advanced-hook-priority":{"type":"string","title":"","description":"","default":""},"ast-custom-hook":{"type":"string","title":"","description":"","default":""},"ast-advanced-hook-padding":{"type":"object","title":"","description":"","default":[],"properties":{"top":{"type":"string"},"bottom":{"type":"string"}},"additionalProperties":false},"ast-advanced-hook-location":{"type":"object","title":"","description":"","default":{"rule":[],"specific":[],"specificText":[]},"properties":{"rule":{"type":"array"},"specific":{"type":"array"},"specificText":{"type":"array"}},"additionalProperties":false},"ast-advanced-hook-exclusion":{"type":"object","title":"","description":"","default":{"rule":[],"specific":[],"specificText":[]},"properties":{"rule":{"type":"array"},"specific":{"type":"array"},"specificText":{"type":"array"}},"additionalProperties":false},"ast-advanced-hook-users":{"type":"array","title":"","description":"","default":[],"items":{"type":"string"}},"ast-advanced-display-device":{"type":"array","title":"","description":"","default":["desktop","mobile","tablet"],"items":{"type":"string"}},"_elementor_edit_mode":{"type":"string","title":"Elementor edit mode","description":"Elementor edit mode, `builder` is required for Elementor editing","default":"","enum":["","builder"],"context":["edit"]},"_elementor_template_type":{"type":"string","title":"Elementor template type","description":"Elementor document type","default":"","enum":["post","wp-post","wp-page","kit","not-supported","page","section","container","floating-buttons","cloud-template-preview","widget","header","footer","single","single-post","single-page","archive","search-results","error-404","loop-item",""],"context":["edit"]},"_elementor_data":{"type":"string","title":"Elementor data","description":"Elementor JSON as a string","default":"","context":["edit"]},"_elementor_page_settings":{"type":"object","title":"Elementor page settings","description":"Elementor page level settings","default":"{}","properties":{"hide_title":{"type":"string","enum":["yes","no"],"default":""}},"additionalProperties":true,"context":["edit"]},"_elementor_conditions":{"type":"array","title":"","description":"Elementor conditions","default":[],"additionalProperties":true,"context":["edit"]}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false}}}]},"\/wp\/v2\/astra-advanced-hook\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"An alphanumeric identifier for the post type.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"An alphanumeric identifier for the status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limit results to taxonomies associated with a specific post type.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"An alphanumeric identifier for the taxonomy.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false}}}]},"\/wp\/v2\/users":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face","e-floating-buttons":"e-floating-buttons","elementor_library":"elementor_library","rm_content_editor":"rm_content_editor","astra-advanced-hook":"astra-advanced-hook"}},"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"username":{"description":"Login name for the user.","type":"string","required":true},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":true},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":true},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/users"}]}},"\/wp\/v2\/users\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the user.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true}},"required":false},"elementor_introduction":{"description":"Elementor user meta data","type":"object","properties":{"ai_get_started":{"type":"boolean"}},"additionalProperties":true,"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","format":"uuid","required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":true}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","format":"uuid","required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":false}}},{"methods":["DELETE"],"args":[]}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limit result set to that from a specific author email. Requires authorization.","format":"email","type":"string","required":false},"before":{"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by comment attribute.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorization.","type":"string","required":false},"type":{"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorization.","type":"string","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false}}},{"methods":["POST"],"args":{"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"default":0,"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"type":{"default":"post","description":"Limit results to items of an object type.","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"Limit results to items of one or more object subtypes.","type":"array","items":{"enum":["post","page","e-floating-buttons","elementor_library","astra-advanced-hook","category","post_tag","any"],"type":"string"},"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Unique registered name for the block.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributes for the block.","type":"object","default":[],"required":false},"post_id":{"description":"ID of the post context.","type":"integer","required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Block name.","type":"string","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":[]},{"methods":["POST","PUT","PATCH"],"args":{"title":{"title":"Title","description":"Site title.","type":"string","required":false},"description":{"title":"Tagline","description":"Site tagline.","type":"string","required":false},"url":{"title":"","description":"Site URL.","type":"string","format":"uri","required":false},"email":{"title":"","description":"This address is used for admin purposes, like new user notification.","type":"string","format":"email","required":false},"timezone":{"title":"","description":"A city in the same timezone as you.","type":"string","required":false},"date_format":{"title":"","description":"A date format for all date strings.","type":"string","required":false},"time_format":{"title":"","description":"A time format for all time strings.","type":"string","required":false},"start_of_week":{"title":"","description":"A day number of the week that the week should start on.","type":"integer","required":false},"language":{"title":"","description":"WordPress locale code.","type":"string","required":false},"use_smilies":{"title":"","description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean","required":false},"default_category":{"title":"","description":"Default post category.","type":"integer","required":false},"default_post_format":{"title":"","description":"Default post format.","type":"string","required":false},"posts_per_page":{"title":"Maximum posts per page","description":"Blog pages show at most.","type":"integer","required":false},"show_on_front":{"title":"Show on front","description":"What to show on the front page","type":"string","required":false},"page_on_front":{"title":"Page on front","description":"The ID of the page that should be displayed on the front page","type":"integer","required":false},"page_for_posts":{"title":"","description":"The ID of the page that should display the latest posts","type":"integer","required":false},"default_ping_status":{"title":"","description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"Allow comments on new posts","description":"Allow people to submit comments on new posts.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"Site logo.","type":"integer","required":false},"site_icon":{"title":"Icon","description":"Site icon.","type":"integer","required":false},"elementor_one_welcome_screen_completed":{"title":"","description":"Elementor One Welcome Screen Completed","type":"boolean","required":false},"elementor_one_dismiss_connect_alert":{"title":"","description":"Elementor One Dismiss Connect Alert","type":"boolean","required":false},"elementor_one_editor_update_notification_dismissed":{"title":"","description":"Elementor One Dismiss Editor Update Notification","type":"boolean","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme's stylesheet. This uniquely identifies the theme.","type":"string","required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a registered sidebar","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Nested widgets.","type":"array","items":{"type":["object","string"]},"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The widget type id.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"form_data":{"description":"Serialized widget form data to encode into instance settings.","type":"string","required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"The sidebar to return widgets for.","type":"string","required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"The sidebar the widget belongs to.","type":"string","required":true},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"description":"The sidebar the widget belongs to.","type":"string","required":false},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Whether to force removal of the widget, or move it to the inactive sidebar.","type":"boolean","required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limit result set to blocks matching the search term.","type":"string","minLength":1,"required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","minLength":1,"required":false},"category":{"description":"Limit results to those matching a category ID.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limit results to those matching a keyword ID.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limit results to those matching a pattern (slug).","type":"array","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to process.","type":"string","format":"uri","required":true}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"An alphanumeric identifier for the menu location.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":[]}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false}}}],"_links":{"self":[{"href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false}}}]}},"site_logo":12,"site_icon":3530,"site_icon_url":"https:\/\/msprojects.com.sg\/wp-content\/uploads\/2025\/02\/cropped-Project-Logo-msprojects.com_.sg-1.png","_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}],"wp:featuredmedia":[{"embeddable":true,"type":"site_logo","href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/media\/12"},{"embeddable":true,"type":"site_icon","href":"https:\/\/msprojects.com.sg\/wp-json\/wp\/v2\/media\/3530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}