<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Crestchic leading manufacturer of load banks</title>
	<atom:link href="https://loadbanks.com/feed/" rel="self" type="application/rss+xml" />
	<link>https://loadbanks.com/</link>
	<description></description>
	<lastBuildDate>Wed, 10 Jun 2026 15:43:28 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://i0.wp.com/loadbanks.com/wp-content/uploads/2022/06/cropped-crestchic_favicon-1.gif?fit=32%2C32&#038;ssl=1</url>
	<title>Crestchic leading manufacturer of load banks</title>
	<link>https://loadbanks.com/</link>
	<width>32</width>
	<height>32</height>
</image> 
<site xmlns="com-wordpress:feed-additions:1">204553752</site>	<item>
		<title>Crestchic Loadbanks expands into Australia</title>
		<link>https://loadbanks.com/crestchic-loadbanks-expands-into-australia/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Wed, 10 Jun 2026 14:14:05 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=72021</guid>

					<description><![CDATA[<p>Crestchic Loadbanks, leading manufacturer and global supplier of load testing equipment, has announced the opening of new premises in Australia. The news comes just one month after the opening of a Swedish depot, marking yet another step in the company’s global expansion.   Crestchic’s Australian depot will be based in Melbourne. As the second largest data centre market in Australia and [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/crestchic-loadbanks-expands-into-australia/">Crestchic Loadbanks expands into Australia</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span data-contrast="auto">Crestchic Loadbanks, leading manufacturer and global supplier of load testing equipment, has announced the opening of new premises in Australia. The news comes just one month after the opening of a Swedish depot, marking yet another step in the company’s global expansion. </span><span data-ccp-props="{}"> </span></p>
<p><span data-contrast="auto">Crestchic’s Australian depot will be based in Melbourne</span><span data-contrast="auto">. As the second largest data centre market in Australia and eighth in Asia-Pacific, the city is increasingly the preferred location for AI-focused hyperscale development, with strong government backing through the Sustainable Data Centre Action Plan. The business will be </span><span data-contrast="auto">ideally positioned</span><span data-contrast="auto"> to serve a dense and rapidly growing cluster of major operators and global hyperscalers. </span><span data-ccp-props="{}"> </span></p>
<p><span data-contrast="none">The expansion is underpinned by significant investment at Crestchic’s UK headquarters. The company is set to double manufacturing footprint and increase production output by a further 75% in the coming years, in a direct response to growing demand from global markets.</span><span data-ccp-props="{}"> </span></p>
<p><span data-contrast="auto">Speaking about the expansion, Chris Caldwell, Managing Director, commented: </span><span data-ccp-props="{}"> </span></p>
<p><i><span data-contrast="auto">“Melbourne is rapidly establishing itself as a powerhouse for AI-driven hyperscale development, and, as facilities grow, the appetite for high-capacity, reliable load testing in that market is proving to be enormous. Having a local presence means we can support operators with the speed and responsiveness they need. It is a hugely exciting market to be entering.&#8221;</span></i><span data-ccp-props="{}"> </span></p>
<p><span data-contrast="auto">Iain Hannaway, newly appointed General Manager of Crestchic Australia, is no stranger to Crestchic equipment. An experienced electrical engineer, Iain has a wealth of experience in the power generation industry, holding senior roles at leading businesses in the energy and data centre sectors. Iain will be supported by Senior Engineer, Wayne Larkham and Field Engineer, Anthony Carlin-Smith, ensuring customers in the region have access to local, hands-on expertise. </span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559685&quot;:0,&quot;335559737&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">Iain adds, </span><i><span data-contrast="none">“</span></i><i><span data-contrast="auto">What sets Crestchic apart is the combination of world-class manufacturing, a vast rental fleet and deep sector expertise. The operators we will be working with here are running some of the most complex, high-value infrastructure in the Asia-Pacific region, and they need a load testing partner they can trust completely. We have the people, the products, and the local knowledge to deliver that, and I am looking forward to getting started.</span></i><i><span data-contrast="none">”</span></i><span data-ccp-props="{&quot;335559738&quot;:280,&quot;335559739&quot;:280}"> </span></p>
<p><span data-contrast="none">Crestchic operates in the UK, Ireland, France, Belgium, Sweden, Germany, the Middle East, and Asia-Pacific, supporting critical applications in standby power generation, marine engineering, utilities, and the military sector. The company has a unique dual capability as both a leading equipment manufacturer and an established rental operator; ensuring it can supply equipment to meet exacting specifications, or flexible rental solutions to support commissioning and ongoing maintenance programmes. Crestchic is part of the Aggreko group, a collection of specialist companies covering temporary power, temperature control, decarbonisation, renewables and rooftop solar, giving the team access to global knowledge-sharing and continued investment in new technologies.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559685&quot;:0,&quot;335559737&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">As part of the expansion, Crestchic’s Australian depot will offer a comprehensive range of load banks, with capacities from 10kW to 100MW and voltages from 110V to 36,000V, ensuring a solution for every project scale and specification.</span><span data-ccp-props="{}"> </span></p>
<p><span data-contrast="auto">For more information, </span><a href="https://www.crestchicloadbanks.com.au/"><span data-contrast="none">www.crestchicloadbanks.com.au</span></a><span data-contrast="auto"> </span><span data-ccp-props="{}"> </span></p>
<p><b><span data-contrast="auto">&#8211; ENDS &#8211;</span></b><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:280,&quot;335559740&quot;:240}"> </span></p>
<p aria-level="2"><b><span data-contrast="auto">Notes to Editors</span></b><span data-ccp-props="{&quot;134245418&quot;:false,&quot;134245529&quot;:false,&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:100,&quot;335559740&quot;:240}"> </span></p>
<p><span data-contrast="auto">Crestchic Loadbanks is the UK’s leading manufacturer of load banks and a global supplier of load testing equipment and services. With over 40 years of experience and operations spanning Europe, the Middle East, and Asia-Pacific, Crestchic supports critical applications in data centres, power generation, marine engineering, utilities, and defence. The company is headquartered in Burton-on-Trent, UK, with international depots providing local hire, sales, and service capabilities. As a member of the Aggreko group, Crestchic and our customers have access to global best practice, investment in new technologies and big thinking on the big issues like the energy transition.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:240,&quot;335559740&quot;:360}"> </span></p>
<p><b><span data-contrast="auto">Media Contact</span></b><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:100,&quot;335559740&quot;:240}"> </span></p>
<p><span data-contrast="auto">Laura Wilks, T: 07828 953 758, E: </span><a href="mailto:l.wilks@crestchic.com"><span data-contrast="none">l.wilks@crestchic.com</span></a><span data-contrast="auto"> </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:240}"> </span></p>
<p>The post <a href="https://loadbanks.com/crestchic-loadbanks-expands-into-australia/">Crestchic Loadbanks expands into Australia</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">72021</post-id>	</item>
		<item>
		<title>DataCloud Cannes: Three key takeaways from the Crestchic team</title>
		<link>https://loadbanks.com/datacloud-cannes-three-key-takeaways-from-the-crestchic-team/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Fri, 05 Jun 2026 15:06:30 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=72018</guid>

					<description><![CDATA[<p>The Crestchic team had a busy few days at Datacloud Global Congress 2026, and the packed venue seems to confirm what the organisers were aiming for – the biggest edition in the event&#8217;s history. DataCloud brought together more than 6,000 digital infrastructure leaders, from hyperscalers and operators to suppliers, for a packed week of conversations about where the industry goes next.  For us, three themes dominated the conversations at our stand from the moment the exhibition [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/datacloud-cannes-three-key-takeaways-from-the-crestchic-team/">DataCloud Cannes: Three key takeaways from the Crestchic team</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p style="text-align: left;"><span data-contrast="auto">The Crestchic team had a busy few days at Datacloud Global Congress 2026, and the packed venue seems to confirm what the organisers were aiming for – the biggest edition in the event&#8217;s history. DataCloud brought together more than 6,000 digital infrastructure leaders, from hyperscalers and operators to suppliers, for a packed week of conversations about where the industry goes next.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><span data-contrast="auto">For us, three themes dominated the conversations at our stand from the moment the exhibition opened: </span><span data-contrast="auto">liquid cooling, power resilience and data centre growth in the Nordics region. </span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><b><span data-contrast="auto">Data Centre cooling; liquid, air and hybrid solutions </span></b><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559685&quot;:0,&quot;335559737&quot;:0,&quot;335559738&quot;:270,&quot;335559739&quot;:270,&quot;335559740&quot;:279}"> </span></p>
<p><span data-contrast="auto">While air cooling is still commonplace, Direct Liquid Cooling (DLC) is moving from being a nice-to-have into a genuine enabler of next-generation data centre operations. AI workloads are pushing densities higher, and maintaining thermal stability at that scale is critical to uptime. </span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><span data-contrast="auto">If the cooling architecture is changing, the way you test and commission it must change with it. It is no surprise that our 600kW liquid cooled loadbank &#8211; built for exactly this kind of environment &#8211; drew lots of attention at this year&#8217;s event. </span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><span data-contrast="auto">While there’s definite interest in liquid cooling, we also had some great conversations focused on the fact that the future isn’t a clean switch from air to liquid overnight. Rising AI rack densities are driving the adoption of combined air-and-liquid cooling- suggesting </span><span data-contrast="auto">that the near-term reality is hybrid. </span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><span data-contrast="auto">Alongside the new liquid-cooled loadbank, and our 200kW data centre loadbank, our loadbank controller and software have been a real talking point on the stand. The system can manage up to 240 units and, crucially, can create hybrid clusters of air- and liquid-cooled loadbanks running together.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><b><span data-contrast="auto">Power resilience: does evolution increase risk? </span></b><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><span data-contrast="auto">Inevitably, the question of power resilience continued to sit as the heart of any data centre conversation this year. As data centres consume increasing amounts of power, operators are exploring alternative power sources, on-site generation and hybrid energy setups. Alongside this rising complexity, the cost of downtime is climbing, and the margin for error shrinking. Power testing is even more important than ever. Resilience isn&#8217;t something that can be assumed; systems must be tested under realistic load if downtime is to be avoided.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><b><span data-contrast="auto">Nordics confirmed as a growth region for Data Centres </span></b><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><span data-contrast="auto">Last but not least, a standout topic at this year’s event was the growth of the data centre market in the Nordics region. Only a month ago, we announced the opening of Crestchic Nordics, based in Sweden, so this is a topic very close to our hearts. Demand in the region is undoubtedly growing, with SweDCI’s recent Impact Report suggesting that installed capacity has roughly doubled In Sweden alone since 2020 to around 800 MW, with hyperscale builds driving it well beyond that by 2030.  We’re looking forward to building on our relationships with key players in Sweden and throughout the wider Nordics over the coming months, and it was great to hear growing excitement about the sector throughout the event. </span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559685&quot;:0,&quot;335559737&quot;:0,&quot;335559738&quot;:270,&quot;335559739&quot;:270,&quot;335559740&quot;:279}"> </span></p>
<p><span data-contrast="auto">A huge thank you to everyone who stopped by, shared their challenges, and talked through what&#8217;s coming next. Things are moving fast, and the way we test and commission data centre infrastructure must keep pace. </span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><span data-contrast="auto">We left Cannes more excited than ever about what&#8217;s ahead. See you at the next one.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:270,&quot;335559739&quot;:270}"> </span></p>
<p>The post <a href="https://loadbanks.com/datacloud-cannes-three-key-takeaways-from-the-crestchic-team/">DataCloud Cannes: Three key takeaways from the Crestchic team</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">72018</post-id>	</item>
		<item>
		<title>Crestchic to exhibit at Data Cloud World Congress in Cannes</title>
		<link>https://loadbanks.com/crestchic-to-exhibit-at-data-cloud-world-congress-in-cannes/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Tue, 19 May 2026 18:01:18 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=71989</guid>

					<description><![CDATA[<p>Crestchic will be attending Data Cloud World Congress in Cannes this June, and we&#8217;re looking forward to connecting with colleagues and customers from across the data centre industry. Our team will be on hand to discuss all aspects of load bank testing, from commissioning and compliance through to full integrated systems testing.  Crestchic offers a comprehensive range of load [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/crestchic-to-exhibit-at-data-cloud-world-congress-in-cannes/">Crestchic to exhibit at Data Cloud World Congress in Cannes</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span data-contrast="auto">Crestchic will be attending Data Cloud World Congress in Cannes this June, and we&#8217;re looking forward to connecting with colleagues and customers from across the data centre industry. Our team will be on hand to discuss all aspects of load bank testing, from commissioning and compliance through to full integrated systems testing.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:297}"> </span></p>
<p><span data-contrast="auto">Crestchic offers a comprehensive range of load banks, with capacities from 10kW to 100MW and voltages from 110V to 36,000V, ensuring a solution for every project scale and specification. At this year’s event, the company will be showcasing two data-centre specific products at the show, alongside our load bank controller which allows a single operator to manage up to 240 units from one control point.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:297}"> </span></p>
<p><span data-contrast="auto">The team will be happy to talk about our newly launched 600 kW liquid-cooled load bank which has been purpose-built for high-density data centre commissioning. Designed to deliver accurate thermal validation and precision electrical testing of liquid-cooled infrastructure, it maintains ΔT stability to ±0.5°C regardless of flow variation, ensuring repeatable, reliable results during critical commissioning activities.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:297}"> </span></p>
<p><span data-contrast="auto">We&#8217;ll also be bringing our popular 200 kW stackable load bank, a proven choice for data centre heat load and infrastructure testing. Up to 240 units can be linked and positioned strategically around a server hall to closely replicate server heat output, airflow patterns, and hot and cold aisle configurations — verifying that cooling systems are operating to specification and identifying any hot spots before the facility goes live.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:297}"> </span></p>
<p><span data-contrast="auto">Speaking about the event, Paul Brickman, Commercial Director, commented: “Load testing is a critical step in bringing any facility online safely. Using load banks to simulate server power consumption and heat load, operators can verify that electrical infrastructure — generators, UPS systems, and PDUs — and cooling systems, can handle demand. Integrated Systems Tests (ISTs) are central to this process, confirming redundancy and reliability before a single demand is placed on the infrastructure.”</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:297}"> </span></p>
<p><span data-contrast="auto">Whether you&#8217;re planning a new build, expanding an existing facility, or want to talk through your commissioning requirements, come and find the Crestchic team on stand 45 at Data Cloud.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335559738&quot;:0,&quot;335559739&quot;:405}"> </span></p>
<p>The post <a href="https://loadbanks.com/crestchic-to-exhibit-at-data-cloud-world-congress-in-cannes/">Crestchic to exhibit at Data Cloud World Congress in Cannes</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">71989</post-id>	</item>
		<item>
		<title>German customer tests their generators with Crestchic</title>
		<link>https://loadbanks.com/german-customer-tests-their-generators-with-crestchic/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Thu, 14 May 2026 17:09:36 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=71981</guid>

					<description><![CDATA[<p>A customer based in Germany required a full-load test of their generators and turned to Crestchic to provide the load bank and transformer equipment to get the job done. Crestchic delivered a tailored solution, combining two 2000 kW load banks with a 5,000 kVA transformer, giving the customer confidence that their generators would perform reliably [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/german-customer-tests-their-generators-with-crestchic/">German customer tests their generators with Crestchic</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="elementToProof">A customer based in Germany required a full-load test of their generators and turned to Crestchic to provide the load bank and transformer equipment to get the job done.</div>
<div></div>
<div class="elementToProof">Crestchic delivered a tailored solution, combining two 2000 kW load banks with a 5,000 kVA transformer, giving the customer confidence that their generators would perform reliably when it matters most.</div>
<div></div>
<div><img data-recalc-dims="1" fetchpriority="high" decoding="async" class="alignleft size-full wp-image-71985" src="https://i0.wp.com/loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM.jpeg?resize=1080%2C810&#038;ssl=1" alt="loadbanks in Germany" width="1080" height="810" srcset="https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM.jpeg 2048w, https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-1280x960.jpeg 1280w, https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-980x735.jpeg 980w, https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-480x360.jpeg 480w" sizes="((min-width: 0px) and (max-width: 480px)) 480px, ((min-width: 481px) and (max-width: 980px)) 980px, ((min-width: 981px) and (max-width: 1280px)) 1280px, (min-width: 1281px) 2048px, 100vw" /> <img data-recalc-dims="1" decoding="async" class="alignleft size-full wp-image-71984" src="https://i0.wp.com/loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-3.jpeg?resize=1080%2C810&#038;ssl=1" alt="loadbanks in Germany" width="1080" height="810" srcset="https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-3.jpeg 2048w, https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-3-1280x960.jpeg 1280w, https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-3-980x735.jpeg 980w, https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-3-480x360.jpeg 480w" sizes="((min-width: 0px) and (max-width: 480px)) 480px, ((min-width: 481px) and (max-width: 980px)) 980px, ((min-width: 981px) and (max-width: 1280px)) 1280px, (min-width: 1281px) 2048px, 100vw" /> <img data-recalc-dims="1" decoding="async" class="alignleft size-full wp-image-71982" src="https://i0.wp.com/loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-1.jpeg?resize=1080%2C810&#038;ssl=1" alt="loadbanks in Germany" width="1080" height="810" srcset="https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-1.jpeg 2048w, https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-1-1280x960.jpeg 1280w, https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-1-980x735.jpeg 980w, https://loadbanks.com/wp-content/uploads/2026/05/WhatsApp-Image-2026-04-21-at-4.44.51-PM-1-480x360.jpeg 480w" sizes="((min-width: 0px) and (max-width: 480px)) 480px, ((min-width: 481px) and (max-width: 980px)) 980px, ((min-width: 981px) and (max-width: 1280px)) 1280px, (min-width: 1281px) 2048px, 100vw" /></div>
<div></div>
<div class="elementToProof"></div>
<div></div>
<p>The post <a href="https://loadbanks.com/german-customer-tests-their-generators-with-crestchic/">German customer tests their generators with Crestchic</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">71981</post-id>	</item>
		<item>
		<title>Crestchic Loadbanks expands into Sweden to serve booming Nordic data centre market</title>
		<link>https://loadbanks.com/crestchic-loadbanks-expands-into-sweden-to-serve-booming-nordic-data-centre-market/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Mon, 04 May 2026 12:35:14 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=71977</guid>

					<description><![CDATA[<p>Crestchic Loadbanks, the UK&#8217;s leading manufacturer and global supplier of load testing equipment, has announced its expansion into Sweden. The move is a significant step forward in the company&#8217;s strategy to better serve customers across the Nordic region with both air-cooled and liquid cooled loadbanks. With over 40 years of experience delivering load bank solutions [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/crestchic-loadbanks-expands-into-sweden-to-serve-booming-nordic-data-centre-market/">Crestchic Loadbanks expands into Sweden to serve booming Nordic data centre market</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><!--StartFragment--></p>
<p class="MsoNormal">Crestchic Loadbanks, the UK&#8217;s leading manufacturer and global supplier of load testing equipment, has announced its expansion into Sweden. The move is a significant step forward in the company&#8217;s strategy to better serve customers across the Nordic region with both air-cooled and liquid cooled loadbanks.</p>
<p class="MsoNormal" style="margin-bottom: 10.0pt;"><span style="color: #1a1a1a;">With over 40 years of experience delivering load bank solutions to more than 50 countries, Crestchic has established itself as a trusted partner across a broad range of industries. </span>Crestchic<span style="color: #1a1a1a;"> operates in the UK, Ireland, France, Belgium, Germany, the Middle East, and Asia-Pacific, supporting critical applications in standby power generation, marine engineering, utilities, and the military sector. </span></p>
<p class="MsoNormal">Sweden has been selected as the base for Nordic operations due to its rapidly expanding data centre market and Crestchic&#8217;s established relationships with data centre owners, developers, and commissioning contractors in the region. <span style="color: #1a1a1a;">The Nordic data centre market is forecast to grow at over 10% annually through to 2028, driven by demand from hyperscalers and co-location providers seeking stable, low-carbon energy infrastructure. As facilities grow in scale and complexity, including the rapid adoption of liquid cooling technologies to manage the thermal demands of high-density AI and HPC workloads, the need for reliable, accurate, high-capacity liquid and air cooled loadbanks has never been greater.</span></p>
<p class="MsoNormal" style="margin-bottom: 10.0pt;"><span style="color: #1a1a1a;">The Swedish expansion is underpinned by significant investment at Crestchic’s UK headquarters. The company has recently signed the lease on a new facility in Burton-on-Trent that will more than double its manufacturing footprint, with plans to increase production output by a further 75% in the coming years, in a direct response to growing demand from global markets.</span></p>
<p class="MsoNormal">Speaking about the expansion, Chris Caldwell, Managing Director, commented:</p>
<p class="MsoNormal">&#8220;<i><span style="color: #1a1a1a;">After more than 40 years delivering mission-critical load testing solutions, Crestchic is growing at a pace that reflects the scale of opportunity in front of us. The Nordic data centre market is currently one of the most active in Europe, and we already have strong relationships with the key players driving that growth. This expansion puts us closer to our customers at exactly the right time.</span></i>&#8220;</p>
<p class="MsoNormal" style="margin: 14.0pt 0cm 14.0pt 0cm;">Leading Crestchic&#8217;s new Swedish operation is Richard Modin, a highly experienced operations and service management professional with over two decades of experience working across the Stockholm region. Richard&#8217;s background in managing complex, customer-facing service operations means he is well placed to support the contractors, developers and end users who will be working with Crestchic across the Nordics.</p>
<p class="MsoNormal" style="margin: 14.0pt 0cm 14.0pt 0cm;">Richard adds, <i><span style="color: #1a1a1a;">“Crestchic has a long and proven <a name="_Int_mU9TrASX"></a>track record in designing and manufacturing load banks that perform in the most demanding environments. Add to that genuine market knowledge, local technicians with hands-on expertise, and a sales team that understands the products and the sectors they serve, and you have a team that can make a real difference to customers here. We are excited to build lasting partnerships across the Nordics.”</span></i></p>
<p class="MsoNormal">What sets Crestchic apart in this market is its unique dual capability as both a leading equipment manufacturer and an established rental operator, a combination no other provider in the sector can offer. Whether a customer requires equipment specified and built to exacting project requirements, or flexible rental solutions to support commissioning and ongoing maintenance programmes, Crestchic is the only partner able to deliver both under one roof. <span style="color: black; mso-themecolor: text1;">The company is part of the Aggreko group, a collection of specialist companies covering temporary power, temperature control, decarbonisation, renewables and rooftop solar. The group gives us access to global knowledge-sharing and continued investment in new technologies.</span></p>
<p class="MsoNormal">As part of the expansion, Crestchic’s Swedish depot will offer a comprehensive range of load banks, with capacities from 10kW to 100MW and voltages from 110V to 36,000V, ensuring a solution for every project scale and specification.</p>
<p class="MsoNormal">For more information <a href="http://www.crestchicloadbanks.se"><span style="color: #1155cc;">www.crestchicloadbanks.se</span></a></p>
<p class="MsoNormal">
<p class="MsoNormal" style="margin-bottom: 14.0pt; line-height: normal;"><b>&#8211; ENDS &#8211;</b></p>
<h2 style="line-height: normal; mso-pagination: widow-orphan; page-break-after: auto; margin: 14.0pt 0cm 5.0pt 0cm;"><b><span style="font-size: 11.0pt;">Notes to Editors</span></b></h2>
<p class="MsoNormal" style="margin-bottom: 5.0pt; line-height: normal;"><b>About Crestchic Loadbanks</b></p>
<p class="MsoNormal" style="margin-bottom: 12.0pt; line-height: 150%;">Crestchic Loadbanks is the UK’s leading manufacturer of load banks and a global supplier of load testing equipment and services. With over 40 years of experience and operations spanning Europe, the Middle East, and Asia-Pacific, Crestchic supports critical applications in data centres, power generation, marine engineering, utilities, and defence. The company is headquartered in Burton-on-Trent, UK, with international depots providing local hire, sales, and service capabilities. As a member of the Aggreko group, Crestchic and our customers have access to global best practice, investment in new technologies and big thinking on the big issues like the energy transition.</p>
<p class="MsoNormal" style="margin-bottom: 5.0pt; line-height: normal;"><b>Media Contact</b></p>
<p class="MsoNormal" style="margin-bottom: 4.0pt; line-height: normal;">Laura Wilks</p>
<p class="MsoNormal" style="margin-bottom: 4.0pt; line-height: normal;">T: 07828 953 758</p>
<p class="MsoNormal" style="margin-bottom: 12.0pt; line-height: normal;">E: l.wilks@crestchic.com</p>
<p><!--EndFragment--></p>
<p>The post <a href="https://loadbanks.com/crestchic-loadbanks-expands-into-sweden-to-serve-booming-nordic-data-centre-market/">Crestchic Loadbanks expands into Sweden to serve booming Nordic data centre market</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">71977</post-id>	</item>
		<item>
		<title>Built for hyperscale: Crestchic&#8217;s trailer-mounted loadbank meets testing needs for European data centre</title>
		<link>https://loadbanks.com/built-for-hyperscale-crestchics-trailer-mounted-loadbank-meets-testing-needs-for-european-data-centre/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Wed, 08 Apr 2026 12:56:44 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=71957</guid>

					<description><![CDATA[<p>When a major European data centre contractor needed to test a fleet of generators spread across a vast site, Crestchic met the brief by supplying a trailer-mounted 3,000 kW containerised resistive load bank that could be moved easily around the data centre campus.  Modern data centres are often home to row upon row of generators, uninterruptible power supplies, and cooling infrastructure. For operators and contractors responsible for [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/built-for-hyperscale-crestchics-trailer-mounted-loadbank-meets-testing-needs-for-european-data-centre/">Built for hyperscale: Crestchic&#8217;s trailer-mounted loadbank meets testing needs for European data centre</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span data-contrast="auto">When a major European data centre contractor needed to test a fleet of generators spread across a vast site, Crestchic met the brief by supplying a trailer-mounted 3,000 kW containerised resistive load bank that could be moved easily around the data centre campus.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Modern data centres are often home to row upon row of generators, uninterruptible power supplies, and cooling infrastructure. For operators and contractors responsible for bringing these sites online, proving that every generator is fit for purpose is a critical step in achieving the industry standard of 99.999% uptime. With sites routinely running 20, 30, or even more generators, traditional testing methods can struggle to keep up with that demand.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Housed within a purpose-built containerised enclosure and mounted on a twin-axle special purpose trailer, the 3,000 kW, 415V resistive load bank was specified from the ground up for one of Europe&#8217;s most active data centre contractors. Every design decision was driven by the realities of the site: tight access routes between generator enclosures, strict health and safety requirements, and pressurised commissioning timelines. The trailer also comes with a motorised power cable reel for easier and safer cable deployment and retraction, with 30-metre lengths of 240 mm² cable pre-installed, a 5,000-amp air circuit breaker for maximum protection, and Powersafe cable connectors for fast set-up.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Paul Brickman, Commercial Director at Crestchic Loadbanks, explains: &#8220;We&#8217;re seeing more and more customers looking for a solution which will allow them to use their load testing equipment in multiple locations. Sites that once ran on two or three generators now operate fleets of twenty or more, sometimes distributed across multiple buildings or courtyards. Moving a load bank between generator sets was becoming a logistical exercise in its own right, consuming crew time and extending commissioning windows. This solution makes testing multiple gensets faster and more efficient.&#8221;</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<ul>
<li aria-setsize="-1" data-leveltext="●" data-font="" data-listid="1" data-list-defn-props="{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;●&quot;,&quot;469777815&quot;:&quot;multilevel&quot;}" data-aria-posinset="1" data-aria-level="1"><b><span data-contrast="auto">Twin-axle special purpose trailer:</span></b><span data-contrast="auto"> tow-vehicle compatible, no HGV or low-loader required, dramatically reducing mobilisation cost and lead time between tests.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559740&quot;:360}"> </span></li>
</ul>
<ul>
<li aria-setsize="-1" data-leveltext="●" data-font="" data-listid="1" data-list-defn-props="{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;●&quot;,&quot;469777815&quot;:&quot;multilevel&quot;}" data-aria-posinset="2" data-aria-level="1"><b><span data-contrast="auto">Low floor height:</span></b><span data-contrast="auto"> designed to sit at generator cable-connection level, removing the need for elevated working platforms and the associated risk assessments and time overhead.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:360}"> </span></li>
</ul>
<ul>
<li aria-setsize="-1" data-leveltext="●" data-font="" data-listid="1" data-list-defn-props="{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;●&quot;,&quot;469777815&quot;:&quot;multilevel&quot;}" data-aria-posinset="3" data-aria-level="1"><b><span data-contrast="auto">Motorised power cable reel:</span></b><span data-contrast="auto"> 30-metre lengths of 240 mm² cable are pre-installed and deploy or retract at the touch of a button, cutting the manual handling that contributes to musculoskeletal injuries and slows down turnaround.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:360}"> </span></li>
</ul>
<ul>
<li aria-setsize="-1" data-leveltext="●" data-font="" data-listid="1" data-list-defn-props="{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;●&quot;,&quot;469777815&quot;:&quot;multilevel&quot;}" data-aria-posinset="4" data-aria-level="1"><b><span data-contrast="auto">5,000 A air circuit breaker:</span></b><span data-contrast="auto"> provides robust overcurrent protection rated to the full prospective short-circuit current of the installation, giving engineers confidence during live testing.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:360}"> </span></li>
</ul>
<ul>
<li aria-setsize="-1" data-leveltext="●" data-font="" data-listid="1" data-list-defn-props="{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;●&quot;,&quot;469777815&quot;:&quot;multilevel&quot;}" data-aria-posinset="5" data-aria-level="1"><b><span data-contrast="auto">Powersafe cable connectors:</span></b><span data-contrast="auto"> industry-standard shrouded connectors that can be mated quickly and safely, reducing set-up time and eliminating risk.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></li>
</ul>
<p><span data-contrast="auto">For the European data centre contractor who specified this unit, the trailer-mounted load bank will compress the time between generator tests, eliminating the logistics overhead that previously made multi-generator commissioning a drawn-out process. The solution was developed through close collaboration between Crestchic&#8217;s R&amp;D team and clients from across the data centre sector. The result is a complete, self-contained load testing solution, with everything needed to test multiple genset in one easy-to-move package.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p>The post <a href="https://loadbanks.com/built-for-hyperscale-crestchics-trailer-mounted-loadbank-meets-testing-needs-for-european-data-centre/">Built for hyperscale: Crestchic&#8217;s trailer-mounted loadbank meets testing needs for European data centre</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">71957</post-id>	</item>
		<item>
		<title>Crestchic Unveils 600kW Liquid Cooled Loadbank at Data Centre World, London</title>
		<link>https://loadbanks.com/crestchic-unveils-600kw-liquid-cooled-loadbank-at-data-centre-world-london/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Wed, 04 Mar 2026 08:00:39 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[600kW]]></category>
		<category><![CDATA[datacentre]]></category>
		<category><![CDATA[liquid cooled]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=71884</guid>

					<description><![CDATA[<p>Setting a new standard in high-density data centre commissioning  Crestchic, the world&#8217;s leading provider of load bank solutions, today announced the launch of its innovative 600kW Liquid Cooled Loadbank at Data Centre World, London. The product marks a significant advancement in commissioning technology for the rapidly expanding liquid-cooled data centre market.  As rack power densities continue to [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/crestchic-unveils-600kw-liquid-cooled-loadbank-at-data-centre-world-london/">Crestchic Unveils 600kW Liquid Cooled Loadbank at Data Centre World, London</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span data-contrast="none">Setting a new standard in high-density data centre commissioning</span><span data-ccp-props="{&quot;134245418&quot;:false,&quot;134245529&quot;:false,&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Crestchic, the world&#8217;s leading provider of load bank solutions, today announced the launch of its innovative 600kW Liquid Cooled Loadbank at Data Centre World, London. The product marks a significant advancement in commissioning technology for the rapidly expanding liquid-cooled data centre market.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">As rack power densities continue to rise, operators are increasingly deploying liquid cooling technologies to manage thermal loads more efficiently. The need for precision commissioning tools has never been greater. Crestchic&#8217;s new 600kW Liquid Cooled Loadbank has been purpose-built to meet this challenge, delivering accurate thermal validation and precision electrical testing of liquid-cooled infrastructure at scale.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><span data-contrast="auto">Purpose-built for the modern data centre</span><span data-ccp-props="{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">The 600kW Loadbank delivers up to 648kW at 415V and has been engineered for the rigours of real-world data centre commissioning. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">At the heart of the new platform is stable ΔT thermal control to ±0.5°C, enabling highly repeatable validation and precision electrical testing of liquid-cooled infrastructure. The unit maintains temperature accuracy to ±0.5°C regardless of flow variation, giving engineers the repeatability and confidence they need during critical testing activities. Comprehensive system protection covers flow, pressure, overload/underload, and thermal shock, safeguarding both the load bank and the infrastructure it is connected to.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">The 600kW platform features a single-vessel architecture, eliminating the need for multi-vessel configurations typically used at this power level. The result is a significantly smaller footprint, making the unit easier to position in space-constrained plant rooms. The compact design also simplifies transport, storage, and on-site handling. With a stackable structure, flush-mounted connections, heavy-duty castors and dual-side forklift pockets, the unit has been engineered for practical deployment on live project sites and can transported double stacked within a standard height ISO shipping container. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><span data-contrast="auto">Advanced control and reporting with VCS</span><span data-ccp-props="{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">The 600kW platform integrates with Crestchic&#8217;s state-of-the-art VCS software, providing a comprehensive digital dashboard with live supply and hydraulic instrumentation data. The software supports real-time monitoring, automatic load profiling and clustering of up to 240 load banks for hybrid air-cooled and liquid-cooled test configurations. Automated compliance reporting via the Crestchic Portal provides audit-ready documentation aligned with key industry standards including ISO 8528-5/22514, NEMA MG1, EN60150, IEEE 141 and ASHRAE G22 standards.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">“The move toward liquid cooling is accelerating as rack densities increase, particularly with AI and high-performance computing workloads,” explains Paul Brickman, Commercial Director at Crestchic. “Our new 600kW Liquid Cooled Loadbank has been designed from the ground up to serve this market, giving commissioning engineers the precision, reliability and control they need to bring critical infrastructure online with confidence.&#8221;</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">The 600kW Liquid Cooled Loadbank is available for both sale and rental through Crestchic&#8217;s global network of offices across the UK, Ireland, Singapore, Germany, Belgium, France, China, and UAE.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><span data-contrast="auto">About Crestchic</span><span data-ccp-props="{&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Crestchic is a world-leading manufacturer and provider of load bank solutions, with decades of experience supporting the power generation, data centre, marine and defence industries. For more information, visit www.crestchicloadbanks.com</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Media Enquiries: Laura Wilks |  l.wilks@crestchic.com | 07828953758</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><b><span data-contrast="auto">Ends</span></b><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p>The post <a href="https://loadbanks.com/crestchic-unveils-600kw-liquid-cooled-loadbank-at-data-centre-world-london/">Crestchic Unveils 600kW Liquid Cooled Loadbank at Data Centre World, London</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">71884</post-id>	</item>
		<item>
		<title>Crestchic expands UK manufacturing capacity with new Midlands facility</title>
		<link>https://loadbanks.com/crestchic-expands-uk-manufacturing-capacity-with-new-midlands-facility/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Mon, 09 Feb 2026 01:18:58 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=71857</guid>

					<description><![CDATA[<p>Loadbank and power testing specialist Crestchic has signed a lease on a new 93,000 sq. ft facility in Burton upon Trent, enabling the company to consolidate operations and support further production growth. Founded in Burton in 1983, Crestchic has developed its UK operations in the town over four decades, moving to its current Centrum 100 headquarters in 1998 [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/crestchic-expands-uk-manufacturing-capacity-with-new-midlands-facility/">Crestchic expands UK manufacturing capacity with new Midlands facility</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Loadbank and power testing specialist Crestchic has signed a lease on a new 93,000 sq. ft facility in Burton upon Trent, enabling the company to consolidate operations and support further production growth.</p>
<p>Founded in Burton in 1983, Crestchic has developed its UK operations in the town over four decades, moving to its current Centrum 100 headquarters in 1998 and continuing to expand locally as demand increased. In mid-2021, the company invested in a new factory, increasing its footprint by 60%. The expansion delivered strong operational results, including a 150% increase in production output, a doubling of the company’s rental fleet, and headcount growth from 175 to 250 employees.</p>
<p>However, with operations now operating across three neighbouring sites, and demand growing globally, the move will improve efficiency and create room for further expansion. The move to Centrum Logistics Park allows Crestchic to bring manufacturing, engineering, and logistics operations together in a single, larger facility.</p>
<p>Chris Caldwell, MD at Crestchic, commented, “Demand for power testing solutions continues to grow across multiple sectors, and while our previous expansion delivered strong gains, demand has continued to grow. This move allows us to future-proof our UK manufacturing base, improve operational flow and create capacity for further expansion while retaining the skilled workforce we have built in Burton.”</p>
<p>The lease for the new site has now been signed, with the relocation planned over a 12-month phased programme. This timeline will enable Crestchic to develop a world-class manufacturing facility purpose-built for precision electrical engineering, supporting higher-quality output and long-term operational resilience.</p>
<p>The new facility provides high-clearance industrial space, expanded loading capacity, and improved logistics circulation, supporting higher production throughput and accommodating the company’s growing rental and service divisions.</p>
<p>With the new footprint more than double than the company’s current Burton facility, Crestchic plans to increase production output by a further 75% in the coming years.</p>
<p>The building also aligns with company sustainability objectives, featuring solar PV generation, high energy efficiency standards, LED lighting, rainwater harvesting, and electric vehicle charging infrastructure, helping reduce operational energy consumption and emissions.</p>
<p>The move positions Crestchic to meet continued demand growth across data centre, power generation, renewables and industrial sectors while strengthening the resilience of its UK manufacturing operations.</p>
<p>The post <a href="https://loadbanks.com/crestchic-expands-uk-manufacturing-capacity-with-new-midlands-facility/">Crestchic expands UK manufacturing capacity with new Midlands facility</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">71857</post-id>	</item>
		<item>
		<title>Data centres, load testing, and power resilience in 2026</title>
		<link>https://loadbanks.com/data-centres-load-testing-and-power-resilience-in-2026/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Wed, 28 Jan 2026 15:09:34 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=71854</guid>

					<description><![CDATA[<p>Backup power systems have long been essential for data centre operators striving to meet uptime targets. As demand for AI grows, grid infrastructure ages, and outages become more likely, the reliability of backup systems is increasingly seen as a strategic priority rather than an operational necessity.  Industry research published by the Uptime Institute &#8211; “Five data [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/data-centres-load-testing-and-power-resilience-in-2026/">Data centres, load testing, and power resilience in 2026</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span data-contrast="auto">Backup power systems have long been essential for data centre operators striving to meet uptime targets. As demand for AI grows, grid infrastructure ages, and outages become more likely, the reliability of backup systems is increasingly seen as a strategic priority rather than an operational necessity.  Industry research published by the Uptime Institute &#8211; “Five data centre predictions for 2026” &#8211; suggests that power failures will be more frequent, more complex, and more significant in 2026 and beyond. With that in mind, the old model of “test the generator once a year and hope for the best” is no longer good enough. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><b><span data-contrast="auto">Grid instability is a growing risk</span></b><span data-ccp-props="{&quot;134245418&quot;:false,&quot;134245529&quot;:false,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">According to Uptime Institute’s report, “Uptime Intelligence expects resiliency to re-emerge as a major area of focus and concern for the industry.” </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Ageing transmission infrastructure, electrification, intermittent generation, and the explosive growth of AI computing are putting increasing strain on power grids. In September 2025, the US Department of Energy (DoE) warned that grid power outages could increase one hundredfold by 2030. The US is not alone. In April 2025, Spain and Portugal were hit by one of the largest blackouts recorded in Europe in decades. In that same year, hundreds of smaller blackouts were caused by a myriad of failures and extreme weather events, suggesting that Europe’s electricity system is also at risk. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">With sources pointing to more frequent disturbances, voltage fluctuations, and long-term outages, data centres that once expected rare grid failures must now plan for more regular outages.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Most data centres overcome this risk by installing backup generators. However, with frequent grid fluctuations and outages putting greater stress on critical power systems, ensuring the reliability of the generator is critical. This changes the role of testing. As grid risk rises, load testing becomes a frontline defence, not a compliance checkbox. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><b><span data-contrast="auto">From “maintenance asset” to strategic resilience tool</span></b><span data-ccp-props="{&quot;134245418&quot;:false,&quot;134245529&quot;:false,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">While large outages are becoming less likely relative to industry growth, Uptime Intelligence data shows that, when failures do occur, their consequences are more severe. This shift necessitates a new approach to generator testing. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">While using a load bank to test generators has always been critical in terms of maintenance &#8211; testing </span><span data-contrast="auto">alternator housing, windings, bearings, controls and cooling systems, </span><span data-contrast="auto">and avoiding wet stacking &#8211; the extra pressures of grid instability and the rise in high-density infrastructure mean that operators must go beyond maintenance. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Where many operators may previously have relied on testing once or twice a year, testing should now include scenario-based testing, including black starts, ATS transfers and N+1 failures. When backup systems consist of several generators, testing is also a vital step in validating synchronised or parallel systems, including verifying that they start automatically, synchronise, and support failover mechanisms. Tests should also assess how generators would perform in the event of a partial power failure. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Proper loadbank testing can provide data that can directly influence board level decisions around resilience, investment, and risk planning. When asked, “How confident are we in our backup power?” Load bank results become the only credible answer.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><b><span data-contrast="auto">On-site power growth</span></b><span data-ccp-props="{&quot;134245418&quot;:false,&quot;134245529&quot;:false,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">As grid capacity tightens, and fears of systemic failure mount, more data centres are investing in prime power systems, gas turbines, hybrid generation and shared power infrastructure across campuses. While becoming independent of the grid and adding redundancy may reduce reliance on large backup systems, new generators and power systems also require careful validation. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Full system testing should be undertaken during commissioning, to confirm that the system &#8211; whether diesel generators, gas turbines or other power sources &#8211; performs as expected under real operating conditions. This includes validating load sharing and synchronisation in multi-generator or hybrid generation systems, as well as checking system settings and components to ensure safe transitions and fault response. Equally, thermal and cooling systems should be tested to confirm they can handle operations without overheating. Additionally, fuel systems must perform flawlessly to deliver clean and polished fuel for hours upon end, from large fuel storage systems across a range of ambient temperature throughout the year. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">None of that can be done meaningfully without load banks. In a world of multi-megawatt data centres and off-grid power generation, skipping load testing is effectively commissioning in the dark.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><b><span data-contrast="auto">Compliance moves centre stage </span></b><span data-ccp-props="{&quot;134245418&quot;:false,&quot;134245529&quot;:false,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">As data centres create more energy on-site, prime power, built-in redundancy and battery storage mean that some facilities are actively supplying the grid through demand response arrangements. This move from data centres as passive consumers to “grid interactive” resources are likely to bring a new level of compliance. Many grid-interactive sites are being asked to meet new grid connection rules, including performing and documenting commissioning tests, as well as regular testing, to ensure safe grid-parallel operations and reduce risks. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:360}"> </span></p>
<p><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:360}"> </span><span data-contrast="auto">As compliance requirements tighten, load bank testing is likely to become a regulatory enabler, demonstrating proven reliability. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><b><span data-contrast="auto">The need for full load</span></b><span data-ccp-props="{&quot;134245418&quot;:false,&quot;134245529&quot;:false,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Of course, while new pressures abound, we can’t overlook the age-old issue of wet stacking in backup generators. Wet stacking usually occurs when engines operate significantly below their rated output level, which is common in backup scenarios. This excessive no-or-low-load runtime causes a buildup of unburned fuel deposits around the combustion chamber, injector nozzles, piston rings, turbocharger, and exhaust. This, combined with condensed water, results in carbon particles and moisture gathering around the exhaust system. Potential outcomes include reduced power, increased emissions, and higher operational costs. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">Regularly running the generator at full load during load bank testing can resolve these issues. If the generator is used below the rated output level on a regular basis, pairing it with a load bank more permanently will prevent “wet stacking” from happening. Without load banks, generator failures often appear for the first time during a real outage, when it’s already too late.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p aria-level="2"><b><span data-contrast="auto">The bottom line: Load banks are still mission-critical</span></b><span data-ccp-props="{&quot;134245418&quot;:false,&quot;134245529&quot;:false,&quot;201341983&quot;:0,&quot;335559738&quot;:360,&quot;335559739&quot;:80,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">As power resilience remains a real risk for data centres, load bank testing remains the backbone of a credible uptime strategy. As well as their ongoing role in testing whether backup power is “outage ready” and preventing equipment damage, load banks are increasingly important in supporting tiered resilience strategies and de-risking on-site power plants. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559737&quot;:600,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p><span data-contrast="auto">In a world of unstable grids, AI-power consumption, and high uptime targets, backup power that hasn’t been tested using a load bank isn’t really backup power at all.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559737&quot;:600,&quot;335559738&quot;:280,&quot;335559739&quot;:280,&quot;335559740&quot;:360}"> </span></p>
<p>The post <a href="https://loadbanks.com/data-centres-load-testing-and-power-resilience-in-2026/">Data centres, load testing, and power resilience in 2026</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">71854</post-id>	</item>
		<item>
		<title>10MW generator test in Frankfurt</title>
		<link>https://loadbanks.com/10mw-generator-test-in-frankfurt/</link>
		
		<dc:creator><![CDATA[Crestchic]]></dc:creator>
		<pubDate>Thu, 22 Jan 2026 16:34:45 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://loadbanks.com/?p=71850</guid>

					<description><![CDATA[<p>These images were captured by Benjamin Velasco during a 10MW generator test in Frankfurt, highlighting the scale and complexity of validating high-power systems. The test configuration included three 3.3MVA loadbanks, one 6.0MVA loadbank, and two 6.3MVA transformers, working together to accurately apply and manage the load throughout the process. From idle to full load, the [&#8230;]</p>
<p>The post <a href="https://loadbanks.com/10mw-generator-test-in-frankfurt/">10MW generator test in Frankfurt</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>These images were captured by Benjamin Velasco during a 10MW generator test in Frankfurt, highlighting the scale and complexity of validating high-power systems. The test configuration included three 3.3MVA loadbanks, one 6.0MVA loadbank, and two 6.3MVA transformers, working together to accurately apply and manage the load throughout the process. From idle to full load, the system was closely monitored to ensure stable performance, reliability, and compliance under demanding conditions.</p>
<p>The post <a href="https://loadbanks.com/10mw-generator-test-in-frankfurt/">10MW generator test in Frankfurt</a> appeared first on <a href="https://loadbanks.com">Crestchic leading manufacturer of load banks</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">71850</post-id>	</item>
	</channel>
</rss>
