{"id":51530,"date":"2020-09-15T18:55:58","date_gmt":"2020-09-15T13:25:58","guid":{"rendered":"https:\/\/ye1o34zhk8.onrocket.site\/?p=51530"},"modified":"2023-10-17T14:15:56","modified_gmt":"2023-10-17T08:45:56","slug":"ups-selection","status":"publish","type":"post","link":"https:\/\/instrumentationtools.com\/ups-selection\/","title":{"rendered":"UPS Selection Factors for a Control System"},"content":{"rendered":"\n<p>The purpose of UPS is to provide regulated and uninterrupted single-phase \/ three-phase power supply within specified tolerances to critical loads during normal &amp; emergency operations.<\/p>\n\n\n\n<p>It provides backup power when utility power fails, either long enough for critical equipment to shut down safely or to keep required loads operational until a generator comes online.<\/p>\n\n\n\n<p>Voltage surges or dips don\u2019t damage sensitive electronics if they fed from <a href=\"https:\/\/instrumentationforum.com\/t\/uninterrupted-power-supply-ups-types\/5186\" target=\"_blank\" rel=\"noopener noreferrer\">UPS<\/a> output.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\" id=\"h-single-line-diagram-of-ups-system\">Single Line Diagram of UPS System<\/h2>\n\n\n<div class=\"wp-block-image is-style-default\">\n<figure class=\"aligncenter\"><img loading=\"lazy\" loading=\"lazy\" decoding=\"async\" width=\"988\" height=\"551\" src=\"https:\/\/instrumentationtools.com\/wp-content\/uploads\/2020\/09\/Single-Line-Diagram-of-UPS-System.png\" alt=\"Single Line Diagram of UPS System\" class=\"wp-image-51531\"\/><\/figure>\n<\/div>\n\n\n<h2 class=\"wp-block-heading has-text-align-left\" id=\"h-main-components-of-ups\">Main Components of UPS<\/h2>\n\n\n\n<p><strong>Rectifier: <\/strong>Converts AC supply to DC Supply<\/p>\n\n\n\n<p><strong>Inverter: <\/strong>Converts DC Supply to AC Supply<\/p>\n\n\n\n<p><strong>Static Bypass Switch:<\/strong> Automatic \/ Manual transfer of load from the inverter to bypass supply. This will be imitated when Inverter fails, inverter output voltage fails, the input supply has some trouble.<\/p>\n\n\n\n<p><strong>Manual Bypass Switch:<\/strong> used to isolate any static transfer switch for maintenance or repair without interruption to UPS.<\/p>\n\n\n\n<p><strong>Battery Banks: <\/strong>When input supply fails, UPS will go into the discharge mode of batteries. These will give DC voltage to Inverter.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\" id=\"h-modes-of-ups\">Modes of UPS<\/h2>\n\n\n\n<p><strong>Normal mode:<\/strong> Input supply is converted to DC and Charging the batteries and inverter further converts to AC supply of desired output.<\/p>\n\n\n\n<p><strong>Discharge Mode: <\/strong>Input supply is not available. However, critical loads are fed from Batteries discharging and the inverter converts DC voltage to the desired AC supply output.<\/p>\n\n\n\n<p><strong>Failure mode: <\/strong>UPS is running though bypass input supply. Rectifier \/ Inverter and Batteries are not in operation.<\/p>\n\n\n\n<p>This article mainly focuses on the sizing of UPS to arrive at correct and optimum UPS Sizing so that UPS is not so oversize or undersize.<\/p>\n\n\n\n<p>UPS is generally rated in terms of <strong>VA (Volt Ampere) rating<\/strong>. It is available in various size (e.g. 300 VA to 5000 kVA)<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\" id=\"h-specification-for-ups\">Specification for UPS<\/h2>\n\n\n\n<p>Input Supply Voltage e.g. 3 phase, 415V \u00b1 5%, 50Hz \u00b1 2%<\/p>\n\n\n\n<p>UPS Output Voltage e.g. 240 V \u00b1 1% (Between P-N)<\/p>\n\n\n\n<p>No of phases e.g. 1 Phase<\/p>\n\n\n\n<p>Neutral: Grounded neutral<\/p>\n\n\n\n<p>Output frequency e.g. 50 Hz \u00b1 0.5%<\/p>\n\n\n\n<p>Battery Autonomy (Battery Back up) e.g. 2 hr of ESD, FGS, and Telecommunication system, 30 min for DCS. This will decide the battery bank capacity (AH) and the number of batteries.<\/p>\n\n\n\n<p>Crest Factor e.g. 3<\/p>\n\n\n\n<p>Max single switching load e.g. 40 Ampere<\/p>\n\n\n\n<p>Spare Capacity \/ Margin e.g. 20%.<\/p>\n\n\n\n<p><strong>UPS rating can be calculated based on downstream critical loads connected to UPS and their VA or Watt rating.<\/strong><\/p>\n\n\n\n<p>Watt = VA rating x Power factor<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-left\" id=\"h-ups-calculations\">UPS Calculations<\/h2>\n\n\n\n<p><span style=\"color: #ff0000\"><strong>STEP 1:<\/strong> <\/span><\/p>\n\n\n\n<p>List down all cabinets and loads of components or cabinet as a whole (VA or Watt).<\/p>\n\n\n\n<p>The individual component that requires specific power (e.g. 110 VAC, 230 VAC, 24 VDC, 48V DC, etc) that can be fed directly from respective cabinets or power distribution panel or bulk power supply modules.<strong>&nbsp;<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-left\" id=\"h-control-panels\">Control Panels<\/h3>\n\n\n\n<p>Control Panel related and other Auxiliaries loads but not limited to following<\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-dcs-esd-f-amp-g-fgs-system-and-marshalling-cabinets\"><span style=\"color: #0000ff\">DCS, ESD, F&amp;G (FGS) System and Marshalling cabinets<\/span><\/h4>\n\n\n\n<p>(TCS, TPS, BMS, BCS, BPS, TSI, Governor Panels, etc in case of the power plant)<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Controller nodes<\/li>\n\n\n\n<li>Modules\/cards<\/li>\n\n\n\n<li>Bulk power supply (24V DC)<\/li>\n<\/ul>\n\n\n\n<p>Solenoids, Hooters, Sounders, Beacons, Gas detectors, Flame detectors, LOS gas detectors, Buzzer, <a href=\"https:\/\/instrumentationtools.com\/what-is-a-annunciator-panel\/\" target=\"_blank\" rel=\"noopener noreferrer\">Annunciator<\/a>, Relays, lamps, Earth leak monitors, I\/H converters, Barriers, Isolators, HART Multiplexers, Wireless Gateways, etc<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-interposing-relay-cabinets\"><span style=\"color: #0000ff\">Interposing Relay Cabinets<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Bulk power supply<\/li>\n<\/ul>\n\n\n\n<p>Relays used in IRP Cabinet which may be required for wetting the dry contact<\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-remote-i-o-panels\"><span style=\"color: #0000ff\">Remote I\/O Panels<\/span><\/h4>\n\n\n\n<p>(wherein RIO is connected to the controller via FO cable)<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Modules\/ cards<\/li>\n\n\n\n<li>Bulk power supply (24V DC) \u2013 (Hooter, beacons, solenoids, media converters, etc)<\/li>\n\n\n\n<li>Ethernet switch and Firewall etc<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-server-cabinets\"><span style=\"color: #0000ff\">Server Cabinets<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Cabinet rack-mounted Servers for different applications (Historian, OPC, Asset Management, Plant info Management, Cybersecurity, APC, OTS, <a href=\"https:\/\/instrumentationtools.com\/alarm-management-system\/\" target=\"_blank\" rel=\"noopener noreferrer\">Alarm management<\/a>, rack type workstation of OWS \/ EWS, etc)<\/li>\n\n\n\n<li>Cabinet mounted HMI\/Monitors, KVM Extender, KVM Switches<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-network-cabinets\"><span style=\"color: #0000ff\">Network Cabinets<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Network Ethernet switches (Layer 2, Layer 3, etc)<\/li>\n\n\n\n<li>Firewalls, GPS, NTP Switches<\/li>\n\n\n\n<li>RS 485 to TCP\/IP Convertors<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-fiber-optic-patch-panels\"><span style=\"color: #0000ff\">Fiber optic patch panels<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Bulk Power Supply<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-converters\"><span style=\"color: #0000ff\">Converters<\/span><\/h4>\n\n\n\n<p>Media converters (Fiber optic to Ethernet converters)<\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-package-systems\"><span style=\"color: #0000ff\">Package Systems<\/span><\/h4>\n\n\n\n<p>Packaged control panels: <a href=\"https:\/\/instrumentationtools.com\/high-integrity-pressure-protection-systems\/\" target=\"_blank\" rel=\"noopener noreferrer\">HIPPS<\/a>, PLDS, CCS, PSA, HGP, N2 Gen, DM Water, HVAC, etc<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Components similar to DCS\/ESD control panel and\/ RIO<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-vibration-monitoring-cabinets-mms-cms\"><span style=\"color: #0000ff\">Vibration Monitoring Cabinets (MMS, CMS)<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Network Ethernet switch, Server, HMI, KVM components<\/li>\n\n\n\n<li>Vibration monitoring racks and isolators<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-clean-agent-systems\"><span style=\"color: #0000ff\">Clean Agent Systems<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>CO2 Flooding System<\/li>\n\n\n\n<li>Argonite systems<\/li>\n\n\n\n<li>Deluge System, etc.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-fire-alarm-control-panel\"><span style=\"color: #0000ff\">Fire Alarm Control Panel<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>CPU unit, Rack controller<\/li>\n\n\n\n<li>I\/O Modules and communication modules<\/li>\n\n\n\n<li>Bulk power supply<\/li>\n<\/ul>\n\n\n\n<p>Hooter, beacons, relays, other than <a href=\"https:\/\/instrumentationtools.com\/conventional-or-addressable-fire-alarm-system\/\" target=\"_blank\" rel=\"noopener noreferrer\">addressable detectors<\/a><\/p>\n\n\n\n<p>High Sensitivity Smoke detection<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Vesda Smoke detector panels e.g. VLS-304 \/ Power supply (VPS-220U)<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-weather-monitoring\"><span style=\"color: #0000ff\">Weather Monitoring<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/instrumentationtools.com\/ph-analyzer\/\" target=\"_blank\" rel=\"noopener noreferrer\">Analyzer<\/a> racks, HMI, printers, and media converters<\/li>\n\n\n\n<li>SOx, NOx, CO, SPM analyzer, Sampling system, heaters, smoke detectors, etc<\/li>\n\n\n\n<li>Wind speed, wind direction, Amb temp, Humidity, solar radiation, rain gauge sensor, and interface units, etc<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-power-distribution-panel\"><span style=\"color: #0000ff\">Power Distribution Panel<\/span><\/h4>\n\n\n\n<p>Field Power distribution panels for field instruments but not limited to the following.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/instrumentationtools.com\/what-is-a-magnetic-flow-meter\/\" target=\"_blank\" rel=\"noopener noreferrer\">Magnetic flowmeter<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/instrumentationtools.com\/coriolis-flow-meter-construction\/\" target=\"_blank\" rel=\"noopener noreferrer\">Coriolis Flowmeter<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/instrumentationtools.com\/ultrasonic-flow-meter\/\" target=\"_blank\" rel=\"noopener noreferrer\">Ultrasonic Flowmeter<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/instrumentationtools.com\/thermal-flow-meter\/\" target=\"_blank\" rel=\"noopener noreferrer\">Thermal Mass flowmeter<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/instrumentationtools.com\/multiphase-flowmeter-working-principle\/\" target=\"_blank\" rel=\"noopener noreferrer\">Multiphase flowmeter<\/a><\/li>\n\n\n\n<li>Custody flowmeter, flow computers<\/li>\n\n\n\n<li>Analyzers (O2, Moisture, CO2, pH, Conductivity, CEMS, SWAS, etc)<\/li>\n\n\n\n<li>Conductivity type Level Switches<\/li>\n\n\n\n<li>Nucleonic level transmitters<\/li>\n\n\n\n<li>Stroke devices (used in chemical injection)<\/li>\n\n\n\n<li>Current to Hydraulic converter, Voith<\/li>\n\n\n\n<li>Flame Scanners<\/li>\n\n\n\n<li>Field Vibration monitors<\/li>\n\n\n\n<li>Reverse Rotation Switch<\/li>\n\n\n\n<li>Local control panel\/field PLC Panel<\/li>\n\n\n\n<li>Emergency lighting e.g. exit gate lighting<\/li>\n<\/ul>\n\n\n\n<p>Analyzer shelters<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/instrumentationtools.com\/online-gas-chromatograph-principle\/\" target=\"_blank\" rel=\"noopener noreferrer\">GC<\/a>,<\/li>\n\n\n\n<li><a href=\"https:\/\/instrumentationtools.com\/analyzer-sample-systems\/\" target=\"_blank\" rel=\"noopener noreferrer\">Sample handling<\/a> system\/pumps,<\/li>\n\n\n\n<li><a href=\"https:\/\/instrumentationtools.com\/electrical-heat-tracing\/\" target=\"_blank\" rel=\"noopener noreferrer\">Heat tracing<\/a>, etc<\/li>\n<\/ul>\n\n\n\n<p>Miscellaneous cabinets which require UPS supply<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Variable Frequency Drive Panels (<a href=\"https:\/\/instrumentationtools.com\/allen-bradley-powerflex-vfd\/\" target=\"_blank\" rel=\"noopener noreferrer\">VFD<\/a>)<\/li>\n\n\n\n<li>Generator Control Panel<\/li>\n\n\n\n<li>Auxiliary panels like Generator Aux panels, Seal oil control panels<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-left\" id=\"h-telecommunication-systems\">Telecommunication Systems<\/h3>\n\n\n\n<p>Telecommunication related loads but not limited to following<\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-cctv-cabinets\"><span style=\"color: #0000ff\">CCTV Cabinets<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Network Ethernet switch and servers<\/li>\n\n\n\n<li>Media converters, KVMs, HMI<\/li>\n\n\n\n<li>Storage drives, recording servers<\/li>\n\n\n\n<li>Outdoor cameras with washer units<\/li>\n\n\n\n<li>Large CCTV Displays (sometimes it is fed from utility supply)<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-paga-cabinets\"><span style=\"color: #0000ff\">PAGA Cabinets<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Bulk power supply (48V)<\/li>\n<\/ul>\n\n\n\n<p>Loudspeaker controller, Beacon controller, Amplifier<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Network switch, Media converter, Ethernet switches, Baseband converter, etc<\/li>\n\n\n\n<li>Network controller, Call stations, Recorder, etc<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-access-control-cabinets\"><span style=\"color: #0000ff\">Access Control Cabinets<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Bulk power supply (12V)<\/li>\n<\/ul>\n\n\n\n<p>Access&nbsp; \/ Door controller, Badge reader, Electromagnetic lock, etc<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Media convertor, KVM, HMI<\/li>\n\n\n\n<li>Network Ethernet switch and servers<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-telephone-systems-cabinets\"><span style=\"color: #0000ff\">Telephone Systems Cabinets<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Call manager Servers, KVM &amp; <a href=\"https:\/\/instrumentationtools.com\/create-an-application-in-hmi-using-tia-portal\/\" target=\"_blank\" rel=\"noopener noreferrer\">HMI<\/a><\/li>\n\n\n\n<li>Ethernet switches, IP Gateway and Analog Voice Gateways<\/li>\n\n\n\n<li>Main distribution frames, Intermediate distribution frames<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-left\" id=\"h-tetra-radio-cabinets\"><span style=\"color: #0000ff\">Tetra Radio cabinets<\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Base station<\/li>\n\n\n\n<li>Ethernet switches, servers, radio chargers, etc<\/li>\n\n\n\n<li>Transceiver, switching, control, and Gateway units<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-left\" id=\"h-workstation\">Workstation<\/h3>\n\n\n\n<p>Workstation related loads but not limited to following<\/p>\n\n\n\n<p>1. Operator workstations, Engineering workstations, Packaged systems\u2019 workstations, Telcom related <a href=\"https:\/\/instrumentationtools.com\/workstation-healthiness-checks\/\" target=\"_blank\" rel=\"noopener noreferrer\">workstations<\/a>.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Tower-type workstations (CPU)<\/li>\n<\/ul>\n\n\n\n<p>2. Laptops<\/p>\n\n\n\n<p>3. Printers and Fax machines: (sometimes these items are connected to the utility power supply), etc.<\/p>\n\n\n\n<p><strong><span style=\"color: #ff0000\">STEP 2:<\/span> <\/strong><\/p>\n\n\n\n<p>Feeder location and redundancy requirement. It is important to know where the consumer is.<\/p>\n\n\n\n<p>Sometimes UPS are kept at various buildings so that respective loads are fed from that UPS in the same building. When all consumers are at a nearby location then it is better to have common UPS in one place.<\/p>\n\n\n\n<p><strong><span style=\"color: #ff0000\">STEP 3:<\/span> <\/strong><\/p>\n\n\n\n<p>Sum up all the UPS loads in the same area + same battery back up. Prepare the schematic drawings for load distribution.<\/p>\n\n\n\n<p>e.g. identify all loads in the control room which requires 30 min UPS back up<\/p>\n\n\n\n<p>e.g. identify all loads in substation which requires 2 hr UPS backup<\/p>\n\n\n\n<p>e.g. identify all loads in the field which requires 30 min UPS Backup<\/p>\n\n\n\n<p>Step 3 is not so important for UPS sizing but it is required for proper distribution and segregation of critical loads.<\/p>\n\n\n\n<p><span style=\"color: #ff0000\"><strong>STEP 4:<\/strong><\/span><\/p>\n\n\n\n<p>It is important, to sum up, all loads in Watt or in VA rating then check it is possible to distribute with one UPS system or you may require a strategic location wise UPS system.<\/p>\n\n\n\n<p><span style=\"color: #ff0000\"><strong>STEP 5:<\/strong><\/span><\/p>\n\n\n\n<p>Apply the load factor. Sometimes it is very much important to know those individual components are taken with the highest power consumption or operational power consumption.<\/p>\n\n\n\n<p>It is not practical that all 100% of UPS loads are running at the same time. e.g. printers, fax, not all <a href=\"https:\/\/instrumentationtools.com\/connect-a-solenoid-valve-with-plc\/\" target=\"_blank\" rel=\"noopener noreferrer\">solenoids<\/a> are activated; not all hooters, beacons are activated; not all annunciator activated all the time, an announcement on PAGA systems is not ON all the time, etc.<\/p>\n\n\n\n<p>Hence it is advised to keep the load factor as 0.95 which means a 5% reduced UPS rating. This is a risk factor you are taking<strong>.<\/strong> (This step is optional)<\/p>\n\n\n\n<p><span style=\"color: #ff0000\"><strong>STEP 6:<\/strong><\/span><\/p>\n\n\n\n<p>Apply gross spare\/future capacity. This is the final step wherein you are getting the final rating which will be required.<\/p>\n\n\n\n<p><span style=\"color: #ff0000\"><strong>STEP 7:<\/strong><\/span><\/p>\n\n\n\n<p>Based on the selected rating, you are advised to perform an adequacy check of UPS for the single largest load with crest factor. UPS shall be capable to handle the largest inrush current.<strong>&nbsp;<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-tips\">Tips<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Sometimes it is wise to kept field Power distribution panel (PDP) to cater all or maximum loads from field PDP. This will reduce the number of power <a href=\"https:\/\/instrumentationtools.com\/instrumentation-cables-testing-standards\/\" target=\"_blank\" rel=\"noopener noreferrer\">cables<\/a> going directly to each field consumers.<\/li>\n\n\n\n<li>Sometimes tender requirement calls for UPS supply requirement for some office or IT or administrative requirement within the plant area. These shall be identified and schematic drawing shall be prepared for distribution purposes.<\/li>\n\n\n\n<li>Always check that loose supplied items\/ workstations\/panels which require UPS Power are already listed down to arrive correct UPS sizing.<\/li>\n\n\n\n<li>It is also wise to consider 3 phase supply up to the Power distribution panel at the <a href=\"https:\/\/instrumentationtools.com\/how-to-wire-a-field-instrument-to-control-room\/\" target=\"_blank\" rel=\"noopener noreferrer\">control room<\/a> and Power distribution panel at the field. These places where you require maximum distribution. By considering 3 ph supply you will end up with a lower power cable size which also reduces efforts while cable laying.<\/li>\n\n\n\n<li>Miss-out of loads that require UPS supply, may have some diverse impact after-ward like an increase of UPS rating, an increase of battery banks, an increase of room size, or increase of building itself. It is very essential to review all the UPS Load requirement critically.<\/li>\n<\/ul>\n\n\n\n<p>Author:&nbsp;<a href=\"https:\/\/www.linkedin.com\/in\/jatin-katrodiya-34781711\/\" target=\"_blank\" rel=\"noopener noreferrer\">Jatin Katrodiya<\/a><\/p>\n\n\n\n<p>If you liked this article, then please subscribe to our <a href=\"http:\/\/youtube.com\/instrumentationtools?sub_confirmation=1\" target=\"_blank\" rel=\"noreferrer noopener\">YouTube Channel<\/a> for PLC and SCADA video tutorials. <\/p>\n\n\n\n<p>You can also follow us on <a href=\"https:\/\/www.facebook.com\/instrumentationtoolss\" target=\"_blank\" rel=\"noreferrer noopener\">Facebook<\/a> and <a href=\"https:\/\/twitter.com\/InstTools\" target=\"_blank\" rel=\"noreferrer noopener\">Twitter<\/a> to receive daily updates.<\/p>\n\n\n\n<p id=\"h-read-next\"><strong>Read Next:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a class=\"row-title\" href=\"https:\/\/instrumentationtools.com\/yokogawa-dcs-and-sis\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"\u201cOrifice Flow Meters: Detailed Specifications\u201d (Edit)\">DCS and SIS System<\/a><\/li>\n\n\n\n<li><a class=\"row-title\" href=\"https:\/\/instrumentationtools.com\/how-to-calculate-transmitter-performance-and-calibration-frequency\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"\u201cHow to Calculate Transmitter Performance and Calibration Frequency?\u201d (Edit)\">Calibration Frequency<\/a><\/li>\n\n\n\n<li><a class=\"row-title\" href=\"https:\/\/instrumentationtools.com\/wiring-diagrams-of-plc-and-dcs-systems\/\" target=\"_blank\" rel=\"noopener noreferrer\" aria-label=\"\u201c200 Quiz Questions for Instrumentation and Control Professionals\u201d (Edit)\">DCS Wiring Diagram<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/instrumentationtools.com\/instrument-loop-test\/\" target=\"_blank\" rel=\"noopener noreferrer\">Instrument Loop Test<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/instrumentationtools.com\/problem-on-plc-hmi-vfd-and-motor-circuit\/\" target=\"_blank\" rel=\"noopener noreferrer\">PLC, HMI, VFD Problem<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Learn basic factors for the UPS selection of a control system to provide regulated and uninterrupted power supply within tolerance.<\/p>\n","protected":false},"author":101017,"featured_media":51531,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_mo_disable_npp":"","footnotes":""},"categories":[12,1925,6],"tags":[108785,108784,108783],"class_list":{"0":"post-51530","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-control-systems","8":"category-instrumentation-design","9":"category-plc","10":"tag-basics-of-ups","11":"tag-ups-factors","12":"tag-ups-selection"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>UPS Selection Factors for a Control System - InstrumentationTools<\/title>\n<meta name=\"description\" content=\"Learn basic factors for the UPS selection of a control system to provide regulated and uninterrupted power supply within tolerance.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/instrumentationtools.com\/ups-selection\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"UPS Selection Factors for a Control System - InstrumentationTools\" \/>\n<meta property=\"og:description\" content=\"Learn basic factors for the UPS selection of a control system to provide regulated and uninterrupted power supply within tolerance.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/instrumentationtools.com\/ups-selection\/\" \/>\n<meta property=\"og:site_name\" content=\"Inst Tools\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/instrumentationtoolss\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-09-15T13:25:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-17T08:45:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/instrumentationtools.com\/wp-content\/uploads\/2020\/09\/Single-Line-Diagram-of-UPS-System.png\" \/>\n\t<meta property=\"og:image:width\" content=\"988\" \/>\n\t<meta property=\"og:image:height\" content=\"551\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jatin Katrodiya\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"UPS Selection Factors for a Control System - InstrumentationTools\" \/>\n<meta name=\"twitter:description\" content=\"Learn basic factors for the UPS selection of a control system to provide regulated and uninterrupted power supply within tolerance.\" \/>\n<meta name=\"twitter:creator\" content=\"@insttools\" \/>\n<meta name=\"twitter:site\" content=\"@insttools\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jatin Katrodiya\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/\"},\"author\":{\"name\":\"Jatin Katrodiya\",\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/#\\\/schema\\\/person\\\/a4249c94556a1715605e2795cc2cb313\"},\"headline\":\"UPS Selection Factors for a Control System\",\"datePublished\":\"2020-09-15T13:25:58+00:00\",\"dateModified\":\"2023-10-17T08:45:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/\"},\"wordCount\":1623,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/instrumentationtools.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/Single-Line-Diagram-of-UPS-System.png\",\"keywords\":[\"Basics of UPS\",\"UPS Factors\",\"UPS Selection\"],\"articleSection\":[\"Control Systems\",\"Instrumentation Design\",\"PLC Tutorials\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/\",\"url\":\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/\",\"name\":\"UPS Selection Factors for a Control System - InstrumentationTools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/instrumentationtools.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/Single-Line-Diagram-of-UPS-System.png\",\"datePublished\":\"2020-09-15T13:25:58+00:00\",\"dateModified\":\"2023-10-17T08:45:56+00:00\",\"description\":\"Learn basic factors for the UPS selection of a control system to provide regulated and uninterrupted power supply within tolerance.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/#primaryimage\",\"url\":\"https:\\\/\\\/instrumentationtools.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/Single-Line-Diagram-of-UPS-System.png\",\"contentUrl\":\"https:\\\/\\\/instrumentationtools.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/Single-Line-Diagram-of-UPS-System.png\",\"width\":988,\"height\":551,\"caption\":\"Single Line Diagram of UPS System\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/ups-selection\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/instrumentationtools.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"UPS Selection Factors for a Control System\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/#website\",\"url\":\"https:\\\/\\\/instrumentationtools.com\\\/\",\"name\":\"Instrumentation Tools\",\"description\":\"Instrumentation, Electrical, PLC, Tutorials\",\"publisher\":{\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/#organization\"},\"alternateName\":\"Inst Tools\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/instrumentationtools.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/#organization\",\"name\":\"Instrumentation Tools\",\"alternateName\":\"Inst Tools\",\"url\":\"https:\\\/\\\/instrumentationtools.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/instrumentationtools.com\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/Instrumentation-Tools-Logo.png\",\"contentUrl\":\"https:\\\/\\\/instrumentationtools.com\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/Instrumentation-Tools-Logo.png\",\"width\":1024,\"height\":1024,\"caption\":\"Instrumentation Tools\"},\"image\":{\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/instrumentationtoolss\\\/\",\"https:\\\/\\\/x.com\\\/insttools\",\"https:\\\/\\\/mastodon.social\\\/@InstrumentationTools\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/instrumentationtools\\\/\",\"https:\\\/\\\/whatsapp.com\\\/channel\\\/0029VaAbUecLNSa4rDPOV31o\",\"https:\\\/\\\/t.me\\\/+u3qORX5FKec1NjA1\",\"https:\\\/\\\/www.instagram.com\\\/instrumentationtools\\\/\",\"https:\\\/\\\/youtube.com\\\/instrumentationtools\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/instrumentationtools.com\\\/#\\\/schema\\\/person\\\/a4249c94556a1715605e2795cc2cb313\",\"name\":\"Jatin Katrodiya\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c43caba57a0a028e91f19c1e7850fc4cb09f7224f3e57d93887dd5d104d17f19?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c43caba57a0a028e91f19c1e7850fc4cb09f7224f3e57d93887dd5d104d17f19?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c43caba57a0a028e91f19c1e7850fc4cb09f7224f3e57d93887dd5d104d17f19?s=96&d=mm&r=g\",\"caption\":\"Jatin Katrodiya\"},\"description\":\"Jatin has 11 years of experience in the field of instrumentation and control (Engineering and commissioning domain). He has hands-on experience on DCS, ESD, F&amp;G system, MMS, Specialized Instrumentation, Valves &amp; Analysers. He is excellent in cross discipline coordination and interfacing (P&amp;ID review, HAZOP, SIL Study, 3D model review etc). He is skilled in Instrument sizing e.g. Control Valve, Flow meter, PSV; UPS load calculations, Intrinsic safety validation, SIL verification etc. He is well versed with international code and standards.\",\"url\":\"https:\\\/\\\/instrumentationtools.com\\\/author\\\/jatin-katrodiya\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"UPS Selection Factors for a Control System - InstrumentationTools","description":"Learn basic factors for the UPS selection of a control system to provide regulated and uninterrupted power supply within tolerance.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/instrumentationtools.com\/ups-selection\/","og_locale":"en_US","og_type":"article","og_title":"UPS Selection Factors for a Control System - InstrumentationTools","og_description":"Learn basic factors for the UPS selection of a control system to provide regulated and uninterrupted power supply within tolerance.","og_url":"https:\/\/instrumentationtools.com\/ups-selection\/","og_site_name":"Inst Tools","article_publisher":"https:\/\/www.facebook.com\/instrumentationtoolss\/","article_published_time":"2020-09-15T13:25:58+00:00","article_modified_time":"2023-10-17T08:45:56+00:00","og_image":[{"width":988,"height":551,"url":"https:\/\/instrumentationtools.com\/wp-content\/uploads\/2020\/09\/Single-Line-Diagram-of-UPS-System.png","type":"image\/png"}],"author":"Jatin Katrodiya","twitter_card":"summary_large_image","twitter_title":"UPS Selection Factors for a Control System - InstrumentationTools","twitter_description":"Learn basic factors for the UPS selection of a control system to provide regulated and uninterrupted power supply within tolerance.","twitter_creator":"@insttools","twitter_site":"@insttools","twitter_misc":{"Written by":"Jatin Katrodiya","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/instrumentationtools.com\/ups-selection\/#article","isPartOf":{"@id":"https:\/\/instrumentationtools.com\/ups-selection\/"},"author":{"name":"Jatin Katrodiya","@id":"https:\/\/instrumentationtools.com\/#\/schema\/person\/a4249c94556a1715605e2795cc2cb313"},"headline":"UPS Selection Factors for a Control System","datePublished":"2020-09-15T13:25:58+00:00","dateModified":"2023-10-17T08:45:56+00:00","mainEntityOfPage":{"@id":"https:\/\/instrumentationtools.com\/ups-selection\/"},"wordCount":1623,"commentCount":0,"publisher":{"@id":"https:\/\/instrumentationtools.com\/#organization"},"image":{"@id":"https:\/\/instrumentationtools.com\/ups-selection\/#primaryimage"},"thumbnailUrl":"https:\/\/instrumentationtools.com\/wp-content\/uploads\/2020\/09\/Single-Line-Diagram-of-UPS-System.png","keywords":["Basics of UPS","UPS Factors","UPS Selection"],"articleSection":["Control Systems","Instrumentation Design","PLC Tutorials"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/instrumentationtools.com\/ups-selection\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/instrumentationtools.com\/ups-selection\/","url":"https:\/\/instrumentationtools.com\/ups-selection\/","name":"UPS Selection Factors for a Control System - InstrumentationTools","isPartOf":{"@id":"https:\/\/instrumentationtools.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/instrumentationtools.com\/ups-selection\/#primaryimage"},"image":{"@id":"https:\/\/instrumentationtools.com\/ups-selection\/#primaryimage"},"thumbnailUrl":"https:\/\/instrumentationtools.com\/wp-content\/uploads\/2020\/09\/Single-Line-Diagram-of-UPS-System.png","datePublished":"2020-09-15T13:25:58+00:00","dateModified":"2023-10-17T08:45:56+00:00","description":"Learn basic factors for the UPS selection of a control system to provide regulated and uninterrupted power supply within tolerance.","breadcrumb":{"@id":"https:\/\/instrumentationtools.com\/ups-selection\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/instrumentationtools.com\/ups-selection\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/instrumentationtools.com\/ups-selection\/#primaryimage","url":"https:\/\/instrumentationtools.com\/wp-content\/uploads\/2020\/09\/Single-Line-Diagram-of-UPS-System.png","contentUrl":"https:\/\/instrumentationtools.com\/wp-content\/uploads\/2020\/09\/Single-Line-Diagram-of-UPS-System.png","width":988,"height":551,"caption":"Single Line Diagram of UPS System"},{"@type":"BreadcrumbList","@id":"https:\/\/instrumentationtools.com\/ups-selection\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/instrumentationtools.com\/"},{"@type":"ListItem","position":2,"name":"UPS Selection Factors for a Control System"}]},{"@type":"WebSite","@id":"https:\/\/instrumentationtools.com\/#website","url":"https:\/\/instrumentationtools.com\/","name":"Instrumentation Tools","description":"Instrumentation, Electrical, PLC, Tutorials","publisher":{"@id":"https:\/\/instrumentationtools.com\/#organization"},"alternateName":"Inst Tools","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/instrumentationtools.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/instrumentationtools.com\/#organization","name":"Instrumentation Tools","alternateName":"Inst Tools","url":"https:\/\/instrumentationtools.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/instrumentationtools.com\/#\/schema\/logo\/image\/","url":"https:\/\/instrumentationtools.com\/wp-content\/uploads\/2018\/10\/Instrumentation-Tools-Logo.png","contentUrl":"https:\/\/instrumentationtools.com\/wp-content\/uploads\/2018\/10\/Instrumentation-Tools-Logo.png","width":1024,"height":1024,"caption":"Instrumentation Tools"},"image":{"@id":"https:\/\/instrumentationtools.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/instrumentationtoolss\/","https:\/\/x.com\/insttools","https:\/\/mastodon.social\/@InstrumentationTools","https:\/\/www.linkedin.com\/company\/instrumentationtools\/","https:\/\/whatsapp.com\/channel\/0029VaAbUecLNSa4rDPOV31o","https:\/\/t.me\/+u3qORX5FKec1NjA1","https:\/\/www.instagram.com\/instrumentationtools\/","https:\/\/youtube.com\/instrumentationtools"]},{"@type":"Person","@id":"https:\/\/instrumentationtools.com\/#\/schema\/person\/a4249c94556a1715605e2795cc2cb313","name":"Jatin Katrodiya","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/c43caba57a0a028e91f19c1e7850fc4cb09f7224f3e57d93887dd5d104d17f19?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c43caba57a0a028e91f19c1e7850fc4cb09f7224f3e57d93887dd5d104d17f19?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c43caba57a0a028e91f19c1e7850fc4cb09f7224f3e57d93887dd5d104d17f19?s=96&d=mm&r=g","caption":"Jatin Katrodiya"},"description":"Jatin has 11 years of experience in the field of instrumentation and control (Engineering and commissioning domain). He has hands-on experience on DCS, ESD, F&amp;G system, MMS, Specialized Instrumentation, Valves &amp; Analysers. He is excellent in cross discipline coordination and interfacing (P&amp;ID review, HAZOP, SIL Study, 3D model review etc). He is skilled in Instrument sizing e.g. Control Valve, Flow meter, PSV; UPS load calculations, Intrinsic safety validation, SIL verification etc. He is well versed with international code and standards.","url":"https:\/\/instrumentationtools.com\/author\/jatin-katrodiya\/"}]}},"_links":{"self":[{"href":"https:\/\/instrumentationtools.com\/wp-json\/wp\/v2\/posts\/51530","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/instrumentationtools.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/instrumentationtools.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/instrumentationtools.com\/wp-json\/wp\/v2\/users\/101017"}],"replies":[{"embeddable":true,"href":"https:\/\/instrumentationtools.com\/wp-json\/wp\/v2\/comments?post=51530"}],"version-history":[{"count":0,"href":"https:\/\/instrumentationtools.com\/wp-json\/wp\/v2\/posts\/51530\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/instrumentationtools.com\/wp-json\/wp\/v2\/media\/51531"}],"wp:attachment":[{"href":"https:\/\/instrumentationtools.com\/wp-json\/wp\/v2\/media?parent=51530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/instrumentationtools.com\/wp-json\/wp\/v2\/categories?post=51530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/instrumentationtools.com\/wp-json\/wp\/v2\/tags?post=51530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}