Skip to content

SOF 2.11 Release Checklist #9360

@kv2019i

Description

@kv2019i

Planned Timeline (updated on Aug 12th)

  • Stable v2.11 Branch – ww36-37
  • RC1 – 16th Sep (previous 13th Sep)
  • Final tag
  • Target Release – w38 / 20th Sep
  • Overflow week (in case multiple RCs are required) – ww39

Pre-RC1 Steps, Creation of Stable Branch

  • Tag features and issue list with milestone https://github.com/thesofproject/sof/milestones/v2.11
  • Choose a SOF commit on main branch as candidate for stable branch
  • Testing & sign off
  • Branch stable v2.xx -- depending on main stability can be one week before RC1 or at the same time

RC1 Steps:

  • Cherry pick critical features and bug fixes to stable-v2.xx for RC1
  • Perform FW security scan and fix opens
  • Testing & sign off
  • Tag v2.xx-RC1

Final Release Steps:

Final Release, vendor specific steps / Intel:

Final Release, vendor specific steps / OtherVendor:

  • add steps here

Final Steps:

Metadata

Metadata

Assignees

Labels

Type

No type

Projects

No projects

Milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions